|
|
PREPARING ROW
|
STA
|
7.000
|
$2,000.000
|
$3,000.000
|
$3,400.000
|
$10,000.000
|
$4,000.000
|
|
|
EXCAVATION (ROADWAY AND CHANNEL)
|
CY
|
160.000
|
$30.000
|
$25.000
|
$54.500
|
$50.000
|
$40.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
506.000
|
$700.000
|
$273.000
|
$375.000
|
$450.000
|
$1,000.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,193.000
|
$25.000
|
$15.000
|
$35.000
|
$45.000
|
$40.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
516.000
|
$200.000
|
$125.000
|
$150.000
|
$226.540
|
$250.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
39.000
|
$550.000
|
$600.000
|
$575.000
|
$517.500
|
$600.000
|
|
|
PROOF ROLLING
|
HR
|
50.000
|
$100.000
|
$170.000
|
$160.000
|
$193.120
|
$220.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
24,162.000
|
$4.500
|
$4.000
|
$3.750
|
$4.030
|
$0.720
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
2,500.000
|
$5.000
|
$7.000
|
$8.300
|
$9.930
|
$8.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
50.000
|
$285.000
|
$340.000
|
$255.000
|
$309.060
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
105.000
|
$700.000
|
$715.000
|
$770.000
|
$927.190
|
$800.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
300.000
|
$250.000
|
$240.000
|
$410.000
|
$258.750
|
$250.000
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
24.000
|
$160.000
|
$225.000
|
$175.000
|
$210.160
|
$170.000
|
|
|
CMP AR (GAL STL DES 5)
|
LF
|
44.000
|
$230.000
|
$290.000
|
$255.000
|
$309.060
|
$250.000
|
|
|
CMP AR (GAL STL DES 6)
|
LF
|
89.000
|
$300.000
|
$280.000
|
$310.000
|
$370.880
|
$300.000
|
|
|
CMP AR (GAL STL DES 7)
|
LF
|
72.000
|
$400.000
|
$380.000
|
$465.000
|
$556.310
|
$450.000
|
|
|
CMP AR (GAL STL DES 8)
|
LF
|
16.000
|
$500.000
|
$460.000
|
$530.000
|
$636.670
|
$515.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
72.000
|
$1,000.000
|
$755.000
|
$1,200.000
|
$1,421.690
|
$1,150.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
64.000
|
$1,000.000
|
$1,350.000
|
$1,300.000
|
$1,607.130
|
$1,300.000
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
24.000
|
$1,100.000
|
$1,950.000
|
$1,500.000
|
$1,854.380
|
$1,500.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 4)
|
EA
|
2.000
|
$4,500.000
|
$13,130.000
|
$12,000.000
|
$14,216.880
|
$11,500.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 5)
|
EA
|
4.000
|
$6,500.000
|
$12,000.000
|
$17,500.000
|
$21,016.250
|
$17,000.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 6)
|
EA
|
8.000
|
$9,000.000
|
$18,000.000
|
$19,500.000
|
$23,488.750
|
$19,000.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 7)
|
EA
|
4.000
|
$12,000.000
|
$20,000.000
|
$28,500.000
|
$33,996.880
|
$27,500.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 8)
|
EA
|
2.000
|
$15,000.000
|
$12,000.000
|
$29,000.000
|
$34,615.000
|
$28,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
4.000
|
$14,000.000
|
$19,500.000
|
$15,500.000
|
$18,543.750
|
$15,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$17,500.000
|
$25,500.000
|
$19,500.000
|
$23,488.750
|
$19,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$24,000.000
|
$32,000.000
|
$24,500.000
|
$29,670.000
|
$24,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$3,000.000
|
$2,800.000
|
$2,600.000
|
$5,750.000
|
$3,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
28.000
|
$1,500.000
|
$1,200.000
|
$1,000.000
|
$1,236.250
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$651,000.000
|
$710,000.000
|
$650,000.000
|
$400,000.000
|
$870,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$5,000.000
|
$25,000.000
|
$12,000.000
|
$16,882.510
|
$48,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$32.000
|
$85.000
|
$67.000
|
$71.300
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$15.000
|
$28.000
|
$31.000
|
$34.500
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
3,880.000
|
$6.000
|
$6.000
|
$4.500
|
$8.630
|
$6.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$5,000.000
|
$8,700.000
|
$8,800.000
|
$5,601.940
|
$5,000.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
450.000
|
$20.000
|
$32.650
|
$30.000
|
$28.750
|
$15.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
450.000
|
$10.000
|
$7.000
|
$14.500
|
$23.000
|
$15.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
450.000
|
$15.000
|
$32.000
|
$30.000
|
$28.750
|
$15.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
96,600.000
|
$0.200
|
$0.250
|
$0.100
|
$0.190
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
49,000.000
|
$0.200
|
$0.250
|
$0.160
|
$0.210
|
$0.350
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
850.000
|
$40.000
|
$36.000
|
$30.500
|
$39.100
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$3,000.000
|
$2,800.000
|
$2,600.000
|
$3,709.080
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
650.000
|
$5.000
|
$2.100
|
$3.100
|
$2.300
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,500.000
|
$3,500.000
|
$3,100.000
|
$3,795.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$210.000
|
$310.000
|
$230.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$2,650.000
|
$1,900.000
|
$2,875.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$1,600.000
|
$1,300.000
|
$1,725.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(W)(TL2)
|
EA
|
2.000
|
$12,000.000
|
$8,700.000
|
$9,300.000
|
$9,487.500
|
$8,500.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
4.000
|
$400.000
|
$320.000
|
$335.000
|
$345.000
|
$325.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$900.000
|
$920.000
|
$820.000
|
$998.400
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$925.000
|
$1,177.630
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,000.000
|
$1,100.000
|
$925.000
|
$1,191.200
|
$900.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
56.000
|
$700.000
|
$900.000
|
$735.000
|
$860.820
|
$715.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
60.000
|
$30.000
|
$16.000
|
$31.000
|
$17.250
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
25.000
|
$50.000
|
$30.000
|
$30.000
|
$33.350
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
50.000
|
$85.000
|
$127.000
|
$82.000
|
$137.940
|
$80.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
26.000
|
$150.000
|
$130.000
|
$82.000
|
$140.880
|
$80.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
3,600.000
|
$0.250
|
$0.550
|
$0.220
|
$0.240
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
9,600.000
|
$0.250
|
$0.550
|
$0.220
|
$0.240
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
240.000
|
$5.000
|
$5.300
|
$4.100
|
$4.600
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,250.000
|
$1.000
|
$1.550
|
$1.350
|
$2.200
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
104,940.000
|
$1.000
|
$0.750
|
$0.640
|
$0.710
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
35,100.000
|
$1.000
|
$0.750
|
$0.640
|
$0.710
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
49,240.000
|
$1.000
|
$0.750
|
$0.640
|
$0.710
|
$0.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,240.000
|
$5.000
|
$5.550
|
$4.100
|
$4.600
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,200.000
|
$0.500
|
$0.800
|
$1.150
|
$1.270
|
$0.750
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
9,827.000
|
$150.000
|
$142.000
|
$180.000
|
$173.640
|
$160.000
|
|
|
D-GR HMA TY-D PG70-28
|
TON
|
18,823.000
|
$150.000
|
$138.000
|
$136.500
|
$179.220
|
$160.000
|
|
|
TACK COAT
|
GAL
|
21,966.000
|
$6.000
|
$4.600
|
$4.250
|
$5.960
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
330.000
|
$75.000
|
$43.000
|
$77.000
|
$166.720
|
$125.000
|
|
|
TMA (STATIONARY)
|
DAY
|
330.000
|
$250.000
|
$300.000
|
$105.000
|
$485.000
|
$335.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$250.000
|
$880.000
|
$975.000
|
$872.080
|
$950.000
|
|
Totals: |
$7,235,990.000
|
$7,122,576.600
|
$7,392,993.200
|
$8,564,810.890
|
$8,647,388.640
|