PREPARING ROW
|
STA
|
2.000
|
$5,000.000
|
$4,000.000
|
$5,000.000
|
$7,500.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
700.000
|
$50.000
|
$40.000
|
$32.000
|
$145.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
250.000
|
$35.000
|
$19.000
|
$60.500
|
$270.000
|
|
|
EXCAVATION (ROADWAY AND CHANNEL)
|
CY
|
120.000
|
$30.000
|
$30.000
|
$64.500
|
$145.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
207.000
|
$550.000
|
$900.000
|
$2,000.000
|
$2,500.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
1,100.000
|
$45.000
|
$57.000
|
$64.000
|
$110.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
211.000
|
$300.000
|
$300.000
|
$175.000
|
$330.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
16.000
|
$2,000.000
|
$515.000
|
$550.000
|
$466.000
|
|
|
VEGETATIVE WATERING
|
MG
|
400.000
|
$60.000
|
$40.000
|
$47.500
|
$45.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$120.000
|
$180.000
|
$235.000
|
$278.250
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
9,700.000
|
$8.000
|
$6.000
|
$5.150
|
$9.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
2,500.000
|
$7.000
|
$6.950
|
$11.000
|
$15.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
65.000
|
$350.000
|
$425.000
|
$455.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
500.000
|
$100.000
|
$80.000
|
$130.000
|
$65.000
|
|
|
CL C CONC (MISC)
|
CY
|
98.000
|
$6,000.000
|
$615.000
|
$750.000
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.000
|
$700.000
|
$895.000
|
$1,000.000
|
$700.000
|
|
|
RAIL (TY T631LS)
|
LF
|
80.000
|
$120.000
|
$117.000
|
$135.000
|
$105.000
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
16.000
|
$400.000
|
$400.000
|
$515.000
|
$250.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
60.000
|
$2,000.000
|
$1,385.000
|
$1,700.000
|
$900.000
|
|
|
CONC BOX CULV (9 FT X 6 FT)(EXTEND)
|
LF
|
26.000
|
$2,000.000
|
$2,655.000
|
$2,200.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
56.000
|
$800.000
|
$316.000
|
$355.000
|
$265.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
88.000
|
$1,000.000
|
$425.000
|
$420.000
|
$300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$10,000.000
|
$28,800.000
|
$24,000.000
|
$16,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$15,000.000
|
$33,850.000
|
$28,000.000
|
$22,000.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 4)
|
EA
|
2.000
|
$20,000.000
|
$16,800.000
|
$30,500.000
|
$8,400.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$10,000.000
|
$27,800.000
|
$37,000.000
|
$17,500.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$25,000.000
|
$67,000.000
|
$42,000.000
|
$70,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$4,000.000
|
$5,600.000
|
$4,200.000
|
$3,255.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$2,000.000
|
$3,500.000
|
$1,600.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,800.000
|
$1,750.000
|
$1,900.000
|
$1,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
120.000
|
$10.000
|
$15.000
|
$13.000
|
$12.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$342,748.000
|
$469,000.000
|
$500,000.000
|
$570,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,500.000
|
$35,000.000
|
$25,000.000
|
$30,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,650.000
|
$11.000
|
$13.500
|
$7.250
|
$7.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
335.000
|
$50.000
|
$30.000
|
$77.000
|
$80.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
700.000
|
$110.000
|
$112.000
|
$110.000
|
$100.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$2,500.000
|
$1,950.000
|
$3,200.000
|
$2,500.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
42,200.000
|
$0.500
|
$0.300
|
$0.060
|
$0.360
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
21,100.000
|
$0.500
|
$0.300
|
$0.110
|
$0.450
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$5,000.000
|
$5,800.000
|
$4,500.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
100.000
|
$40.000
|
$50.000
|
$58.000
|
$45.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
1.000
|
$500.000
|
$475.000
|
$480.000
|
$425.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$800.000
|
$1,000.000
|
$965.000
|
$900.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
41.000
|
$700.000
|
$1,100.000
|
$965.000
|
$975.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
52.000
|
$30.000
|
$16.750
|
$25.500
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$50.000
|
$44.550
|
$51.500
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
12.000
|
$100.000
|
$140.000
|
$130.000
|
$125.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
100.000
|
$10.000
|
$14.000
|
$15.500
|
$12.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
40.000
|
$2.000
|
$1.100
|
$1.300
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
35,958.000
|
$1.000
|
$0.750
|
$0.820
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,744.000
|
$1.000
|
$0.800
|
$1.000
|
$0.720
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
31,979.000
|
$1.000
|
$0.750
|
$0.820
|
$0.670
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
500.000
|
$7.000
|
$6.700
|
$5.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
100.000
|
$5.000
|
$4.450
|
$3.850
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
40.000
|
$2.000
|
$1.100
|
$1.300
|
$1.000
|
|
|
D-GR HMA TY-D SAC-A PG70-28
|
TON
|
7,494.000
|
$145.000
|
$195.000
|
$225.000
|
$236.200
|
|
|
TACK COAT
|
GAL
|
8,501.000
|
$18.000
|
$7.750
|
$5.150
|
$4.600
|
|
|
D-GR HMA TY-B PG70-28 (EXEMPT)
|
TON
|
4,077.000
|
$150.000
|
$190.000
|
$250.000
|
$236.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$21,000.000
|
$9,600.000
|
$15,000.000
|
$18,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
215.000
|
$300.000
|
$560.000
|
$250.000
|
$515.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
19.000
|
$300.000
|
$1,180.000
|
$1,100.000
|
$950.000
|
|
Totals: |
$4,283,347.000
|
$4,695,146.200
|
$5,284,097.990
|
$5,662,766.690
|