|
|
EXCAVATION (ROADWAY)
|
CY
|
5,286.000
|
$35.000
|
$20.000
|
$40.000
|
$40.000
|
$22.810
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
21,869.000
|
$25.000
|
$25.000
|
$50.000
|
$45.000
|
$39.090
|
$30.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
30,582.000
|
$1.500
|
$0.250
|
$0.300
|
$0.180
|
$0.200
|
$0.250
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
15,291.000
|
$1.500
|
$0.250
|
$0.300
|
$0.180
|
$0.200
|
$0.250
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
15,291.000
|
$1.500
|
$0.250
|
$0.300
|
$0.180
|
$0.200
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
246.300
|
$100.000
|
$1.000
|
$50.000
|
$40.000
|
$1.330
|
$50.000
|
|
|
PROOF ROLLING
|
HR
|
3.000
|
$200.000
|
$1.000
|
$125.000
|
$150.000
|
$664.230
|
$610.000
|
|
|
FL BS(CMP IN PLC)(TYA GR3)(FINAL POS)8"
|
SY
|
8,453.000
|
$40.000
|
$50.000
|
$50.000
|
$60.000
|
$54.780
|
$40.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,625.000
|
$12.500
|
$15.000
|
$16.000
|
$20.000
|
$7.880
|
$6.500
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
8,122.000
|
$12.500
|
$12.000
|
$20.000
|
$35.000
|
$6.230
|
$8.000
|
|
|
AGGR(TY-L GR-3LW SAC-A)
|
CY
|
142.000
|
$275.000
|
$600.000
|
$500.000
|
$300.000
|
$423.440
|
$350.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
88.000
|
$450.000
|
$300.000
|
$350.000
|
$450.000
|
$464.960
|
$500.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
4,538.000
|
$300.000
|
$350.000
|
$240.000
|
$300.000
|
$388.380
|
$470.000
|
|
|
CL C CONC (ABUT)
|
CY
|
42.200
|
$1,500.000
|
$2,000.000
|
$2,800.000
|
$2,200.000
|
$2,656.910
|
$2,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
243.100
|
$1,500.000
|
$2,600.000
|
$2,800.000
|
$2,000.000
|
$2,771.250
|
$2,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
210.600
|
$2,000.000
|
$2,800.000
|
$2,800.000
|
$2,000.000
|
$2,517.290
|
$2,500.000
|
|
|
REINF CONC SLAB
|
SF
|
36,720.000
|
$30.000
|
$35.000
|
$40.000
|
$40.000
|
$24.740
|
$40.000
|
|
|
APPROACH SLAB
|
CY
|
48.100
|
$1,100.000
|
$1,200.000
|
$1,500.000
|
$2,000.000
|
$762.200
|
$2,500.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
4,284.000
|
$300.000
|
$250.000
|
$325.000
|
$338.000
|
$385.390
|
$200.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
4,964.000
|
$12.000
|
$8.000
|
$10.000
|
$6.500
|
$6.970
|
$6.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
74.000
|
$650.000
|
$800.000
|
$700.000
|
$1,220.000
|
$797.070
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
155.600
|
$230.000
|
$300.000
|
$250.000
|
$320.000
|
$292.260
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
74.400
|
$650.000
|
$800.000
|
$650.000
|
$1,000.000
|
$896.710
|
$600.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,208.000
|
$260.000
|
$160.000
|
$150.000
|
$160.000
|
$159.410
|
$100.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
238.000
|
$225.000
|
$250.000
|
$250.000
|
$280.000
|
$458.320
|
$200.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)
|
LF
|
205.000
|
$1,750.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
$2,802.700
|
$1,500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
48.000
|
$160.000
|
$120.000
|
$200.000
|
$280.000
|
$209.900
|
$200.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$40,000.000
|
$250,000.000
|
$60,000.000
|
$65,000.000
|
$39,853.590
|
$85,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,800.000
|
$5,500.000
|
$2,000.000
|
$7,200.000
|
$3,642.620
|
$4,500.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$75,000.000
|
$60,000.000
|
$25,000.000
|
$80,000.000
|
$39,853.590
|
$15,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$4,300.000
|
$8,000.000
|
$5,000.000
|
$15,000.000
|
$1,686.700
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
36.000
|
$35.000
|
$50.000
|
$20.000
|
$100.000
|
$24.770
|
$55.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$500,000.000
|
$1,000,000.000
|
$700,000.000
|
$700,000.000
|
$565,808.020
|
$1,500,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$914,640.000
|
$910,000.000
|
$1,200,000.000
|
$1,100,000.000
|
$1,062,762.320
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$4,000.000
|
$17,000.000
|
$3,500.000
|
$2,800.000
|
$46,495.850
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
390.000
|
$35.000
|
$1.000
|
$55.000
|
$60.000
|
$59.780
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
390.000
|
$20.000
|
$1.000
|
$10.000
|
$20.000
|
$26.570
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
100.000
|
$80.000
|
$1.000
|
$55.000
|
$55.000
|
$59.780
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
100.000
|
$30.000
|
$1.000
|
$10.000
|
$25.000
|
$26.570
|
$10.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
2,508.000
|
$25.000
|
$20.000
|
$8.000
|
$8.000
|
$7.970
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,370.000
|
$6.000
|
$1.000
|
$6.000
|
$6.000
|
$10.630
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,370.000
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.660
|
$2.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
587.500
|
$40.000
|
$30.000
|
$38.000
|
$35.000
|
$35.220
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,100.000
|
$2,500.000
|
$3,000.000
|
$3,586.820
|
$2,050.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
100.000
|
$80.000
|
$100.000
|
$125.000
|
$135.000
|
$73.060
|
$90.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
120.000
|
$5.000
|
$2.000
|
$7.000
|
$10.000
|
$3.990
|
$7.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,750.000
|
$3,200.000
|
$4,000.000
|
$4,000.000
|
$4,417.110
|
$2,900.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$400.000
|
$500.000
|
$300.000
|
$1,000.000
|
$398.540
|
$500.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
275.000
|
$25.000
|
$20.000
|
$22.000
|
$40.000
|
$19.930
|
$30.000
|
|
|
GATE (TY 1)
|
EA
|
2.000
|
$2,000.000
|
$4,000.000
|
$2,000.000
|
$1,500.000
|
$1,494.510
|
$2,500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
9.000
|
$400.000
|
$1,500.000
|
$1,200.000
|
$750.000
|
$730.650
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$150.000
|
$50.000
|
$250.000
|
$125.000
|
$132.850
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
24.000
|
$35.000
|
$20.000
|
$30.000
|
$20.000
|
$31.880
|
$24.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$40.000
|
$30.000
|
$30.000
|
$30.000
|
$53.140
|
$32.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
22.000
|
$50.000
|
$30.000
|
$24.000
|
$25.000
|
$106.000
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
9,600.000
|
$0.750
|
$1.500
|
$1.100
|
$1.000
|
$1.060
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
240.000
|
$7.500
|
$10.000
|
$10.000
|
$8.000
|
$5.990
|
$8.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
7,210.000
|
$2.000
|
$2.000
|
$2.200
|
$2.500
|
$1.580
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
7,210.000
|
$2.000
|
$2.000
|
$2.200
|
$2.500
|
$1.580
|
$2.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
24.000
|
$25.000
|
$30.000
|
$30.000
|
$35.000
|
$33.210
|
$25.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$1,000.000
|
$2,000.000
|
$1,200.000
|
$1,420.000
|
$633.670
|
$1,000.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
110.000
|
$7.500
|
$15.000
|
$12.000
|
$13.000
|
$13.280
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,600.000
|
$1.500
|
$1.500
|
$1.300
|
$1.000
|
$1.200
|
$0.900
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$50,000.000
|
$40,000.000
|
$15,000.000
|
$90,000.000
|
$99,633.970
|
$65,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$16,000.000
|
$20,000.000
|
$18,000.000
|
$25,000.000
|
$11,204.340
|
$18,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$350.000
|
$250.000
|
$150.000
|
$500.000
|
$332.110
|
$1,225.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
54.000
|
$350.000
|
$250.000
|
$300.000
|
$1,215.000
|
$664.230
|
$950.000
|
|
Totals: |
$9,306,194.500
|
$10,872,131.300
|
$10,931,550.200
|
$11,239,028.020
|
$11,671,408.600
|
$12,287,967.000
|