PREPARING ROW
|
STA
|
21.000
|
$2,000.000
|
$1,000.000
|
$1,734.000
|
$2,040.000
|
$1,850.000
|
$4,925.000
|
$7,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,089.000
|
$15.000
|
$5.000
|
$20.160
|
$11.000
|
$12.000
|
$7.000
|
$14.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
11,554.000
|
$12.000
|
$15.000
|
$17.700
|
$16.000
|
$17.000
|
$19.600
|
$30.000
|
|
|
BACKFILL (TY B)
|
STA
|
232.000
|
$100.000
|
$50.000
|
$83.250
|
$85.000
|
$125.000
|
$150.000
|
$400.000
|
|
|
BLADING
|
STA
|
50.000
|
$125.000
|
$200.000
|
$106.050
|
$95.000
|
$60.000
|
$98.000
|
$500.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
40,453.000
|
$0.300
|
$0.290
|
$0.450
|
$0.450
|
$0.350
|
$0.420
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
10,113.000
|
$0.200
|
$0.230
|
$0.150
|
$0.150
|
$0.250
|
$0.360
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
10,113.000
|
$0.200
|
$0.230
|
$0.150
|
$0.150
|
$0.250
|
$0.360
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
341.000
|
$16.000
|
$10.000
|
$19.980
|
$10.000
|
$25.000
|
$19.000
|
$70.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
6,868.000
|
$65.000
|
$68.000
|
$62.680
|
$70.000
|
$60.000
|
$77.500
|
$79.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
23,106.000
|
$2.000
|
$2.500
|
$1.480
|
$2.400
|
$2.750
|
$1.720
|
$3.300
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
276.000
|
$160.000
|
$140.000
|
$151.200
|
$149.000
|
$165.000
|
$160.000
|
$170.000
|
|
|
CEMENT
|
TON
|
276.000
|
$140.000
|
$140.000
|
$121.800
|
$120.000
|
$140.000
|
$130.000
|
$150.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
23,106.000
|
$1.500
|
$2.500
|
$1.480
|
$1.500
|
$2.750
|
$1.200
|
$2.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,739.000
|
$3.500
|
$3.500
|
$4.060
|
$3.250
|
$3.750
|
$3.800
|
$4.600
|
|
|
PRIME COAT (RC-250)
|
GAL
|
2,041.000
|
$3.500
|
$4.500
|
$4.060
|
$3.500
|
$4.000
|
$4.000
|
$5.000
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
1,499.000
|
$65.000
|
$50.000
|
$72.400
|
$100.000
|
$110.000
|
$100.000
|
$128.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
66,248.000
|
$2.500
|
$1.900
|
$2.680
|
$2.300
|
$2.850
|
$2.450
|
$3.100
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
15,042.000
|
$65.000
|
$67.000
|
$66.270
|
$68.000
|
$78.000
|
$71.000
|
$76.000
|
|
|
D-GR HMA TY-D SAC-B PG76-22
|
TON
|
17,216.000
|
$65.000
|
$72.000
|
$72.570
|
$72.000
|
$79.000
|
$78.000
|
$82.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,167.000
|
$50.000
|
$60.000
|
$55.360
|
$60.000
|
$70.000
|
$67.700
|
$108.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
18,902.000
|
$2.000
|
$1.500
|
$1.540
|
$1.500
|
$1.200
|
$1.110
|
$3.200
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
14,999.000
|
$2.000
|
$2.500
|
$1.650
|
$1.500
|
$1.500
|
$1.600
|
$4.900
|
|
|
CEM STABIL BKFL
|
CY
|
255.000
|
$150.000
|
$150.000
|
$115.000
|
$44.000
|
$90.000
|
$108.000
|
$250.000
|
|
|
CUT & RESTORING PAV
|
SY
|
290.000
|
$150.000
|
$25.000
|
$100.000
|
$81.000
|
$200.000
|
$190.000
|
$175.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
20.400
|
$500.000
|
$500.000
|
$425.000
|
$717.000
|
$750.000
|
$543.000
|
$500.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
21.000
|
$400.000
|
$300.000
|
$260.000
|
$235.000
|
$550.000
|
$460.000
|
$590.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
77.000
|
$600.000
|
$500.000
|
$385.000
|
$428.000
|
$600.000
|
$543.000
|
$670.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
42.000
|
$700.000
|
$700.000
|
$600.000
|
$752.000
|
$750.000
|
$570.000
|
$760.000
|
|
|
CONC BOX CULV (8 FT X 2 FT)
|
LF
|
22.000
|
$800.000
|
$900.000
|
$650.000
|
$850.000
|
$1,200.000
|
$650.000
|
$780.000
|
|
|
CONC BOX CULVERT (10 FT X 2.5 FT)
|
LF
|
43.000
|
$900.000
|
$1,100.000
|
$850.000
|
$1,130.000
|
$1,400.000
|
$760.000
|
$950.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
60.000
|
$70.000
|
$40.000
|
$60.000
|
$65.000
|
$130.000
|
$49.000
|
$100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
355.000
|
$60.000
|
$50.000
|
$65.000
|
$52.000
|
$137.000
|
$52.000
|
$125.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
295.000
|
$65.000
|
$60.000
|
$68.000
|
$66.000
|
$160.000
|
$93.500
|
$150.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
8.000
|
$4,000.000
|
$3,000.000
|
$4,200.000
|
$6,085.000
|
$3,800.000
|
$3,800.000
|
$6,200.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
4.000
|
$5,500.000
|
$4,000.000
|
$5,200.000
|
$6,457.000
|
$5,500.000
|
$4,300.000
|
$7,200.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
2.000
|
$5,000.000
|
$4,000.000
|
$5,500.000
|
$8,839.000
|
$4,300.000
|
$5,400.000
|
$5,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
4.000
|
$6,000.000
|
$5,000.000
|
$6,000.000
|
$9,185.000
|
$5,700.000
|
$7,000.000
|
$8,000.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$900.000
|
$600.000
|
$1,300.000
|
$1,180.000
|
$1,200.000
|
$760.000
|
$1,700.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,000.000
|
$800.000
|
$1,500.000
|
$1,400.000
|
$1,700.000
|
$870.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,400.000
|
$1,000.000
|
$1,950.000
|
$1,799.000
|
$2,100.000
|
$1,030.000
|
$2,200.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
3.000
|
$3,000.000
|
$3,000.000
|
$2,500.000
|
$2,596.000
|
$3,000.000
|
$2,700.000
|
$6,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
13.000
|
$500.000
|
$500.000
|
$1,150.000
|
$1,613.000
|
$900.000
|
$700.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$300,000.000
|
$400,000.000
|
$381,409.620
|
$375,000.000
|
$250,000.000
|
$518,000.000
|
$425,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,000.000
|
$2,000.000
|
$1,942.030
|
$1,100.000
|
$2,750.000
|
$2,780.000
|
$7,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
311.000
|
$15.000
|
$10.000
|
$15.000
|
$15.000
|
$37.000
|
$27.000
|
$32.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
311.000
|
$10.000
|
$1.000
|
$6.000
|
$6.000
|
$15.000
|
$6.850
|
$16.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
465.000
|
$2.500
|
$10.000
|
$4.850
|
$4.850
|
$5.000
|
$4.800
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
465.000
|
$0.500
|
$0.500
|
$2.500
|
$2.500
|
$2.000
|
$1.500
|
$2.700
|
|
|
DRIVEWAYS (CONC)
|
SY
|
141.000
|
$80.000
|
$80.000
|
$75.000
|
$100.000
|
$77.000
|
$120.000
|
$90.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
273.000
|
$30.000
|
$40.000
|
$39.420
|
$69.000
|
$55.000
|
$44.000
|
$60.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
764.000
|
$20.000
|
$20.000
|
$26.280
|
$34.000
|
$32.000
|
$29.600
|
$40.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
40,028.000
|
$0.200
|
$0.220
|
$0.120
|
$0.250
|
$0.250
|
$0.150
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
20,014.000
|
$0.200
|
$0.220
|
$0.160
|
$0.440
|
$0.350
|
$0.220
|
$0.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$400.000
|
$440.000
|
$410.000
|
$410.000
|
$500.000
|
$445.000
|
$460.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$510.000
|
$550.000
|
$504.000
|
$504.000
|
$620.000
|
$547.000
|
$575.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$650.000
|
$600.000
|
$565.620
|
$565.620
|
$750.000
|
$614.000
|
$625.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$850.000
|
$750.000
|
$903.520
|
$903.520
|
$1,000.000
|
$980.000
|
$780.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
1.000
|
$300.000
|
$300.000
|
$267.560
|
$267.560
|
$350.000
|
$290.000
|
$310.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
2.000
|
$300.000
|
$420.000
|
$36.480
|
$267.560
|
$450.000
|
$430.000
|
$440.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$70.000
|
$120.000
|
$50.000
|
$90.000
|
$100.000
|
$80.000
|
$119.770
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
12.000
|
$60.000
|
$50.000
|
$50.000
|
$36.480
|
$50.000
|
$39.000
|
$49.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
4,350.000
|
$0.200
|
$0.250
|
$0.450
|
$0.240
|
$0.240
|
$0.260
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
51,890.000
|
$0.200
|
$0.200
|
$0.240
|
$0.190
|
$0.190
|
$0.210
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,720.000
|
$0.200
|
$0.250
|
$0.320
|
$0.240
|
$0.240
|
$0.260
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
98,976.000
|
$0.200
|
$0.200
|
$0.180
|
$0.190
|
$0.190
|
$0.210
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (Y)8"(SLD)
|
LF
|
700.000
|
$0.500
|
$1.000
|
$0.240
|
$0.840
|
$0.840
|
$0.910
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,731.000
|
$1.500
|
$1.000
|
$1.550
|
$0.440
|
$2.000
|
$0.900
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,251.000
|
$1.500
|
$1.000
|
$1.550
|
$0.440
|
$2.000
|
$0.900
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
700.000
|
$1.000
|
$1.000
|
$1.600
|
$0.540
|
$0.540
|
$0.590
|
$0.750
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
4,270.000
|
$0.300
|
$0.280
|
$0.380
|
$0.270
|
$0.270
|
$0.290
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
53,687.000
|
$0.250
|
$0.260
|
$0.300
|
$0.250
|
$0.250
|
$0.270
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
1,860.000
|
$0.300
|
$0.280
|
$0.380
|
$0.270
|
$0.270
|
$0.290
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
58,948.000
|
$0.250
|
$0.260
|
$0.320
|
$0.250
|
$0.250
|
$0.270
|
$0.350
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
114.000
|
$3.000
|
$7.000
|
$6.400
|
$6.400
|
$6.400
|
$6.900
|
$7.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
156.000
|
$5.000
|
$14.000
|
$12.800
|
$13.000
|
$13.000
|
$14.000
|
$14.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
18.000
|
$160.000
|
$250.000
|
$200.000
|
$240.000
|
$240.000
|
$260.000
|
$235.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$300.000
|
$350.000
|
$280.000
|
$300.000
|
$300.000
|
$325.000
|
$310.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
1,443.000
|
$6.000
|
$7.000
|
$5.800
|
$6.400
|
$6.400
|
$6.900
|
$7.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
273.000
|
$3.000
|
$4.000
|
$2.800
|
$2.900
|
$2.900
|
$3.000
|
$3.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,218.000
|
$2.750
|
$3.000
|
$2.800
|
$2.900
|
$2.900
|
$3.000
|
$3.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$7,500.000
|
$8,118.750
|
$5,000.000
|
$6,500.000
|
$10,500.000
|
$21,000.000
|
|
Totals: |
$4,345,747.950
|
$4,487,326.990
|
$4,612,390.540
|
$4,698,539.800
|
$5,047,737.790
|
$5,144,836.400
|
$6,102,513.690
|