D-GR HMA TY-D SAC-B PG70-22
|
TON
|
57.000
|
$120.000
|
$150.000
|
$300.000
|
$193.000
|
$400.000
|
|
|
TACK COAT
|
GAL
|
50.000
|
$5.000
|
$5.000
|
$100.000
|
$2.000
|
$100.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,204.000
|
$10.000
|
$15.000
|
$10.000
|
$10.000
|
$13.200
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
135.200
|
$100.000
|
$400.000
|
$444.000
|
$35.000
|
$110.000
|
|
|
REINF CONC SLAB (LIGHTWEIGHT)
|
SF
|
20,365.000
|
$30.000
|
$20.000
|
$18.000
|
$30.000
|
$55.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
4.000
|
$1,000.000
|
$2,000.000
|
$250.000
|
$500.000
|
$500.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
189.000
|
$12.000
|
$100.000
|
$75.000
|
$31.000
|
$40.000
|
|
|
CONCRETE OVERLAY (1.5 IN)
|
SY
|
1,204.000
|
$20.000
|
$35.000
|
$112.000
|
$225.000
|
$68.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
10,485.000
|
$10.000
|
$10.000
|
$10.000
|
$6.000
|
$4.000
|
|
|
STR STEEL (SHEAR ANCHOR)
|
LB
|
1,335.000
|
$8.000
|
$12.000
|
$15.000
|
$100.000
|
$98.000
|
|
|
CLEAN AND PAINT EXIST STR (REF NO.1)
|
LS
|
1.000
|
$700,000.000
|
$500,000.000
|
$1,000,000.000
|
$700,000.000
|
$847,348.600
|
|
|
CLEAN AND PAINT EXIST STR (REF NO.2)
|
LS
|
1.000
|
$700,000.000
|
$500,000.000
|
$1,000,000.000
|
$2,100,000.000
|
$2,134,382.800
|
|
|
CLEAN AND PAINT EXIST STR (REF NO.3)
|
LS
|
1.000
|
$700,000.000
|
$500,000.000
|
$1,000,000.000
|
$700,000.000
|
$837,348.600
|
|
|
ANCHOR BOLTS
|
EA
|
4.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
$10,000.000
|
$1,000.000
|
|
|
RAIL (TY SSTR)
|
LF
|
258.500
|
$35.000
|
$300.000
|
$168.000
|
$300.000
|
$198.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
2,112.000
|
$185.000
|
$150.000
|
$310.000
|
$285.000
|
$185.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
108.000
|
$120.000
|
$100.000
|
$200.000
|
$200.000
|
$165.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
40.000
|
$10.000
|
$300.000
|
$150.000
|
$100.000
|
$180.000
|
|
|
REMOVE STRUCTURE (BRIDGE SLAB)(REF 1)
|
EA
|
1.000
|
$75,000.000
|
$100,000.000
|
$225,000.000
|
$75,000.000
|
$120,000.000
|
|
|
REMOVE STRUCTURE (BRIDGE SLAB)(REF 2)
|
EA
|
1.000
|
$75,000.000
|
$100,000.000
|
$225,800.000
|
$85,000.000
|
$120,000.000
|
|
|
REMOVE STRUCTURE (BRIDGE SLAB)(REF 3)
|
EA
|
1.000
|
$75,000.000
|
$100,000.000
|
$225,000.000
|
$75,000.000
|
$120,000.000
|
|
|
ADJUST STL SHOES
|
EA
|
6.000
|
$3,000.000
|
$40,000.000
|
$2,000.000
|
$7,000.000
|
$9,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$432,000.000
|
$420,000.000
|
$650,000.000
|
$690,000.000
|
$690,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$6,000.000
|
$12,000.000
|
$1,000.000
|
$10,000.000
|
$700.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
300.000
|
$5.000
|
$5.000
|
$8.000
|
$5.000
|
$6.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
300.000
|
$1.000
|
$1.000
|
$5.000
|
$1.250
|
$3.300
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
300.000
|
$11.000
|
$30.000
|
$35.000
|
$36.000
|
$44.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$25.000
|
$25.000
|
$35.000
|
$26.000
|
$33.390
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$35.000
|
$50.000
|
$100.000
|
$30.000
|
$57.090
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,000.000
|
$2,500.000
|
$3,200.000
|
$2,000.000
|
$3,146.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,000.000
|
$2,500.000
|
$3,200.000
|
$3,000.000
|
$3,349.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$3,000.000
|
$5,000.000
|
$1,200.000
|
$13,000.000
|
$4,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
3.000
|
$600.000
|
$3,000.000
|
$1,000.000
|
$400.000
|
$470.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
1.000
|
$3,800.000
|
$3,000.000
|
$3,000.000
|
$2,000.000
|
$7,650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$100.000
|
$3,000.000
|
$3,000.000
|
$84.000
|
$100.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
2.000
|
$700.000
|
$1,000.000
|
$250.000
|
$1,000.000
|
$950.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
12.000
|
$40.000
|
$100.000
|
$40.000
|
$10.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
6.000
|
$30.000
|
$100.000
|
$40.000
|
$10.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$25.000
|
$50.000
|
$65.000
|
$25.000
|
$22.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
6,834.000
|
$0.120
|
$0.300
|
$1.000
|
$0.500
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
8,656.000
|
$0.200
|
$0.300
|
$1.000
|
$0.500
|
$0.550
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
1,648.000
|
$15.000
|
$7.000
|
$10.000
|
$9.000
|
$9.900
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
232.000
|
$6.000
|
$3.000
|
$5.000
|
$5.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,500.000
|
$0.500
|
$0.400
|
$1.000
|
$1.000
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
800.000
|
$5.000
|
$3.000
|
$10.000
|
$3.000
|
$3.300
|
|
|
REPAIR (STEEL RAIL)
|
LF
|
225.000
|
$200.000
|
$100.000
|
$100.000
|
$150.000
|
$130.000
|
|
|
REPLACE (STEEL RAIL)
|
LF
|
123.300
|
$300.000
|
$150.000
|
$300.000
|
$150.000
|
$210.000
|
|
|
REP STL BRIDGE MEMBER (COVER PLATES)
|
EA
|
2.000
|
$7,500.000
|
$1,000.000
|
$2,200.000
|
$4,000.000
|
$6,400.000
|
|
|
REP STL BRIDGE MEMBER (BATTEN PLATES)
|
EA
|
60.000
|
$300.000
|
$1,000.000
|
$2,500.000
|
$1,500.000
|
$1,225.000
|
|
|
REP STL BRDG MEMB (TRUSS PORTAL BRACE)
|
EA
|
6.000
|
$2,500.000
|
$4,500.000
|
$3,500.000
|
$10,000.000
|
$3,900.000
|
|
|
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
|
EA
|
7.000
|
$15,000.000
|
$10,000.000
|
$7,500.000
|
$4,000.000
|
$2,600.000
|
|
|
REP STL BRIDGE MEMBER(REPL RIVET/BOLT)
|
EA
|
1,502.000
|
$150.000
|
$180.000
|
$220.000
|
$43.000
|
$105.000
|
|
|
REPR STL BRG MEMB(GUSSET PLATES)(TY I)
|
EA
|
1.000
|
$5,000.000
|
$1,000.000
|
$3,000.000
|
$4,000.000
|
$8,600.000
|
|
|
REPR STL BRG MEMB(GUSSET PLATES)(TY II)
|
EA
|
2.000
|
$5,000.000
|
$1,000.000
|
$3,000.000
|
$4,000.000
|
$3,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
10.000
|
$250.000
|
$500.000
|
$10.000
|
$450.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$250.000
|
$500.000
|
$10.000
|
$450.000
|
$137.500
|
|
|
CLEANING SUBSTRUCTURE (BENT)
|
EA
|
9.000
|
$2,500.000
|
$1,000.000
|
$2,500.000
|
$6,000.000
|
$2,150.000
|
|
|
CLEANING SUBSTRUCTURE (ABUT)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$5,000.000
|
$3,000.000
|
$1,600.000
|
|
Totals: |
$4,616,818.780
|
$4,243,334.000
|
$6,589,804.800
|
$6,895,869.000
|
$7,338,238.000
|