EXCAVATION (ROADWAY)
|
CY
|
2,733.000
|
$20.000
|
$6.500
|
$14.500
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,665.000
|
$25.000
|
$10.750
|
$14.500
|
$22.000
|
|
|
BLADING
|
LF
|
24,008.000
|
$1.500
|
$1.400
|
$1.500
|
$0.200
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
7,692.000
|
$0.250
|
$0.780
|
$0.300
|
$0.270
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
3,846.000
|
$0.250
|
$0.880
|
$0.400
|
$0.380
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
3,846.000
|
$0.250
|
$0.890
|
$0.400
|
$0.380
|
|
|
VEGETATIVE WATERING
|
MG
|
173.000
|
$10.500
|
$21.000
|
$15.000
|
$38.000
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$100.000
|
$100.000
|
$100.000
|
$101.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
5,353.100
|
$43.000
|
$41.250
|
$58.000
|
$58.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
3,504.000
|
$3.130
|
$4.000
|
$3.700
|
$3.400
|
|
|
ASPH (RC-250)
|
GAL
|
2,061.000
|
$4.260
|
$4.750
|
$4.200
|
$4.800
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
77.000
|
$92.420
|
$85.000
|
$115.000
|
$163.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
86.000
|
$123.570
|
$135.000
|
$130.000
|
$211.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
100.000
|
$50.000
|
$412.500
|
$59.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,239.000
|
$3.000
|
$2.750
|
$6.000
|
$2.850
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,621.000
|
$3.250
|
$6.050
|
$5.000
|
$2.150
|
|
|
CL C CONC (CULV)
|
CY
|
18.940
|
$1,450.000
|
$1,650.000
|
$1,900.000
|
$1,500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.000
|
$650.000
|
$1,100.000
|
$725.000
|
$1,000.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
0.500
|
$1,000.000
|
$2,750.000
|
$1,150.000
|
$2,500.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
20.000
|
$98.000
|
$70.000
|
$90.000
|
$60.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
1.000
|
$9,000.000
|
$17,600.000
|
$24,000.000
|
$16,000.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$4,500.000
|
$2,100.000
|
$1,800.000
|
$1,800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$141,888.660
|
$125,000.000
|
$160,000.000
|
$179,310.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$8,100.000
|
$5,550.000
|
$5,000.000
|
$8,020.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
90.000
|
$1.000
|
$36.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
470.000
|
$7.500
|
$4.750
|
$5.000
|
$2.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
470.000
|
$1.500
|
$3.000
|
$1.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
330.000
|
$5.200
|
$7.000
|
$4.000
|
$4.150
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
330.000
|
$1.500
|
$3.000
|
$1.500
|
$1.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
90.000
|
$5.000
|
$134.000
|
$50.000
|
$48.500
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
150.000
|
$30.000
|
$61.000
|
$17.500
|
$40.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
11.000
|
$9.660
|
$80.000
|
$50.000
|
$20.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
23,760.000
|
$0.500
|
$0.200
|
$0.100
|
$0.180
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
15,264.000
|
$0.500
|
$0.200
|
$0.100
|
$0.300
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$181.690
|
$500.000
|
$200.000
|
$200.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
16.000
|
$15.000
|
$33.000
|
$40.000
|
$30.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
20.000
|
$1.650
|
$5.000
|
$5.000
|
$4.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
40.000
|
$1.980
|
$5.000
|
$5.000
|
$4.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,000.000
|
$1,650.000
|
$2,000.000
|
$1,500.000
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$500.000
|
$220.000
|
$250.000
|
$200.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
36.500
|
$29.180
|
$60.000
|
$50.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$500.000
|
$850.000
|
$550.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$500.000
|
$900.000
|
$650.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$500.000
|
$1,200.000
|
$900.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$91.690
|
$150.000
|
$90.000
|
$150.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
1.000
|
$100.000
|
$150.000
|
$70.000
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
385.000
|
$0.500
|
$1.750
|
$1.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,538.000
|
$0.500
|
$1.750
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
532.000
|
$0.260
|
$0.830
|
$1.250
|
$0.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
434.000
|
$0.800
|
$1.710
|
$2.000
|
$1.550
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
36.000
|
$12.000
|
$13.200
|
$12.000
|
$12.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
23,760.000
|
$0.260
|
$0.460
|
$0.500
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,368.000
|
$0.260
|
$0.470
|
$0.500
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
18,689.000
|
$0.260
|
$0.470
|
$0.500
|
$0.430
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$203.030
|
$231.000
|
$210.000
|
$210.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$259.590
|
$352.000
|
$225.000
|
$320.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
232.000
|
$3.100
|
$4.400
|
$5.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
507.000
|
$2.910
|
$4.400
|
$5.000
|
$4.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$100.000
|
$350.000
|
$350.000
|
$315.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$2,000.000
|
$10,450.000
|
$10,000.000
|
$9,500.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$8,000.000
|
$13,475.000
|
$13,000.000
|
$12,250.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
7,272.000
|
$100.000
|
$100.000
|
$102.000
|
$110.000
|
|
|
BONDING COURSE
|
GAL
|
10,577.000
|
$3.170
|
$3.000
|
$3.500
|
$3.050
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$140.000
|
$50.000
|
$175.000
|
$235.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
48.000
|
$75.000
|
$165.000
|
$90.000
|
$25.000
|
|
Totals: |
$1,598,593.660
|
$1,557,595.495
|
$1,687,525.600
|
$1,772,133.660
|