PREPARING ROW
|
STA
|
11.000
|
$2,500.000
|
$2,500.000
|
$4,000.000
|
$3,000.000
|
$4,000.000
|
$7,000.000
|
|
|
PREP ROW (TREE) (18"-36" DIA.)
|
EA
|
14.000
|
$1,200.000
|
$1,050.000
|
$1,500.000
|
$1,000.000
|
$800.000
|
$500.000
|
|
|
PREP ROW (TREE)(GREATER THAN 8 IN DIA)
|
EA
|
5.000
|
$1,200.000
|
$975.000
|
$1,500.000
|
$2,000.000
|
$700.000
|
$500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
556.000
|
$15.000
|
$25.000
|
$10.000
|
$25.000
|
$28.000
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,419.000
|
$17.000
|
$18.000
|
$10.000
|
$18.000
|
$19.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
745.000
|
$22.000
|
$5.000
|
$12.000
|
$25.000
|
$28.500
|
$25.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
1,010.000
|
$2.000
|
$3.250
|
$2.000
|
$3.300
|
$3.000
|
$5.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
504.000
|
$2.000
|
$3.500
|
$2.000
|
$3.900
|
$3.500
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
504.000
|
$2.000
|
$3.500
|
$2.000
|
$3.900
|
$3.500
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
25.000
|
$50.000
|
$95.000
|
$75.000
|
$50.000
|
$40.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
930.000
|
$3.000
|
$2.200
|
$2.000
|
$2.250
|
$2.000
|
$5.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
|
CY
|
446.000
|
$65.000
|
$72.000
|
$85.000
|
$80.000
|
$110.000
|
$100.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
344.000
|
$30.000
|
$9.000
|
$17.000
|
$26.000
|
$16.000
|
$20.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
578.000
|
$30.000
|
$8.000
|
$13.500
|
$24.000
|
$11.000
|
$20.000
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
11.000
|
$1,500.000
|
$500.000
|
$1,100.000
|
$895.000
|
$820.000
|
$1,200.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
16.000
|
$1,500.000
|
$380.000
|
$850.000
|
$680.000
|
$625.000
|
$1,200.000
|
|
|
CEM STABIL BKFL
|
CY
|
148.000
|
$265.000
|
$264.000
|
$200.000
|
$263.000
|
$320.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
31.000
|
$20.000
|
$7.600
|
$5.000
|
$30.000
|
$1.000
|
$20.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
292.000
|
$110.000
|
$150.000
|
$145.000
|
$135.000
|
$155.000
|
$115.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
318.000
|
$190.000
|
$246.000
|
$250.000
|
$220.000
|
$258.000
|
$200.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
438.000
|
$225.000
|
$340.000
|
$410.000
|
$320.000
|
$486.000
|
$295.000
|
|
|
CORE HOLE
|
EA
|
4.000
|
$400.000
|
$543.500
|
$250.000
|
$220.000
|
$200.000
|
$800.000
|
|
|
CL C CONC (ABUT)
|
CY
|
80.800
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
$1,250.000
|
$1,150.000
|
$1,600.000
|
|
|
CL C CONC (CULV)
|
CY
|
42.000
|
$1,500.000
|
$1,220.000
|
$1,200.000
|
$1,250.000
|
$1,185.000
|
$3,000.000
|
|
|
REINF CONC SLAB
|
SF
|
3,120.000
|
$25.000
|
$38.000
|
$25.000
|
$31.000
|
$30.000
|
$30.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
1,040.000
|
$25.000
|
$38.000
|
$20.000
|
$24.000
|
$29.000
|
$30.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
197.410
|
$230.000
|
$284.000
|
$255.000
|
$257.000
|
$301.000
|
$255.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
478.000
|
$230.000
|
$310.000
|
$265.000
|
$255.000
|
$285.000
|
$245.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
17.000
|
$1,000.000
|
$577.000
|
$500.000
|
$550.000
|
$715.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,592.000
|
$125.000
|
$116.000
|
$150.000
|
$125.000
|
$160.000
|
$160.000
|
|
|
RAIL (TY T223)
|
LF
|
408.000
|
$125.000
|
$139.000
|
$125.000
|
$125.000
|
$170.000
|
$120.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
48.000
|
$120.000
|
$150.000
|
$110.000
|
$120.000
|
$160.000
|
$150.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
573.000
|
$120.000
|
$160.000
|
$150.000
|
$190.000
|
$175.000
|
$125.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
150.000
|
$265.000
|
$266.000
|
$250.000
|
$345.000
|
$275.000
|
$350.000
|
|
|
GABION (1.5' X 3')(GALV)
|
CY
|
31.000
|
$265.000
|
$289.000
|
$300.000
|
$450.000
|
$488.000
|
$350.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
38.000
|
$95.000
|
$95.000
|
$75.000
|
$110.000
|
$150.000
|
$120.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
62.000
|
$600.000
|
$930.000
|
$800.000
|
$1,125.000
|
$1,100.000
|
$2,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$16,000.000
|
$13,900.000
|
$24,500.000
|
$23,000.000
|
$22,000.000
|
$45,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$17,000.000
|
$16,300.000
|
$26,500.000
|
$27,000.000
|
$26,000.000
|
$45,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
8.000
|
$9,000.000
|
$4,600.000
|
$7,500.000
|
$9,500.000
|
$3,600.000
|
$6,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$1,650.000
|
$2,500.000
|
$1,500.000
|
$1,700.000
|
$2,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,100.000
|
$1,400.000
|
$2,000.000
|
$3,250.000
|
$2,500.000
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
32.000
|
$40.000
|
$11.000
|
$15.000
|
$50.000
|
$40.000
|
$100.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
46.000
|
$100.000
|
$70.000
|
$75.000
|
$200.000
|
$190.000
|
$325.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
3.000
|
$25,000.000
|
$22,500.000
|
$40,000.000
|
$20,000.000
|
$17,250.000
|
$30,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$163,000.000
|
$195,000.000
|
$160,000.000
|
$200,000.000
|
$212,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$2,500.000
|
$900.000
|
$2,000.000
|
$2,500.000
|
$1,200.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
45.000
|
$12.000
|
$15.000
|
$10.000
|
$10.000
|
$15.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,435.000
|
$4.000
|
$4.350
|
$5.000
|
$3.110
|
$2.850
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,435.000
|
$1.500
|
$0.900
|
$1.000
|
$1.000
|
$0.900
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
190.000
|
$6.000
|
$6.250
|
$5.000
|
$6.300
|
$5.750
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
190.000
|
$1.500
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$5.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
45.000
|
$50.000
|
$70.000
|
$75.000
|
$74.990
|
$67.000
|
$1.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
217.000
|
$25.000
|
$17.000
|
$30.000
|
$30.000
|
$20.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
275.000
|
$33.000
|
$37.500
|
$42.000
|
$46.000
|
$35.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
8.000
|
$1,250.000
|
$1,250.000
|
$1,500.000
|
$1,360.000
|
$1,250.000
|
$1,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,000.000
|
$1,465.000
|
$1,500.000
|
$1,525.000
|
$1,375.000
|
$3,000.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$38.000
|
$53.000
|
$50.000
|
$29.000
|
$26.500
|
$40.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,200.000
|
$3,315.000
|
$3,250.000
|
$3,400.000
|
$3,150.000
|
$3,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
2,005.000
|
$15.000
|
$16.000
|
$25.000
|
$15.000
|
$18.000
|
$25.000
|
|
|
GATE (TY 1)
|
EA
|
2.000
|
$2,000.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
$1,500.000
|
$3,000.000
|
|
|
GATE (TY 2)
|
EA
|
3.000
|
$1,500.000
|
$1,000.000
|
$1,750.000
|
$1,000.000
|
$1,600.000
|
$3,000.000
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
116.000
|
$30.000
|
$55.000
|
$60.000
|
$50.000
|
$50.000
|
$100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$1,100.000
|
$815.000
|
$750.000
|
$950.500
|
$950.000
|
$1,200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$30.000
|
$25.000
|
$30.000
|
$29.000
|
$15.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
6.000
|
$125.000
|
$55.000
|
$70.000
|
$72.000
|
$55.000
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
58.000
|
$20.000
|
$33.000
|
$25.000
|
$1.000
|
$15.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
30.000
|
$30.000
|
$25.000
|
$40.000
|
$20.000
|
$25.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$30.000
|
$22.000
|
$40.000
|
$20.000
|
$15.000
|
$50.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
864.000
|
$5.000
|
$6.150
|
$5.000
|
$6.000
|
$10.000
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
12.000
|
$15.000
|
$9.780
|
$25.000
|
$16.000
|
$20.000
|
$30.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
2.000
|
$6,500.000
|
$20,000.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
|
Totals: |
$1,822,620.800
|
$1,969,718.250
|
$2,034,356.550
|
$2,047,047.470
|
$2,166,491.660
|
$2,345,812.550
|