PREPARING ROW
|
STA
|
14.000
|
$2,000.000
|
$1,650.000
|
$2,000.000
|
$2,000.000
|
$6,000.000
|
$12,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
257.000
|
$20.000
|
$19.000
|
$25.000
|
$22.000
|
$100.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
974.000
|
$10.000
|
$29.000
|
$20.000
|
$27.000
|
$20.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,150.000
|
$20.000
|
$35.000
|
$26.000
|
$50.000
|
$35.000
|
$35.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
2.230
|
$1,000.000
|
$940.000
|
$1,200.000
|
$750.000
|
$2,500.000
|
$900.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
2.230
|
$750.000
|
$800.000
|
$1,000.000
|
$650.000
|
$2,500.000
|
$900.000
|
|
|
VEGETATIVE WATERING
|
MG
|
90.800
|
$20.000
|
$48.000
|
$40.000
|
$92.000
|
$100.000
|
$100.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
104.000
|
$200.000
|
$175.000
|
$190.000
|
$285.000
|
$171.000
|
$180.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
5,224.000
|
$6.000
|
$10.000
|
$10.000
|
$13.000
|
$4.250
|
$12.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,306.000
|
$5.000
|
$4.000
|
$8.000
|
$5.500
|
$15.000
|
$13.000
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
2,160.000
|
$5.000
|
$3.000
|
$5.000
|
$4.000
|
$15.000
|
$8.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
1,139.000
|
$150.000
|
$70.000
|
$100.000
|
$82.500
|
$120.000
|
$120.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-22
|
TON
|
946.000
|
$150.000
|
$80.000
|
$125.000
|
$95.000
|
$125.000
|
$150.000
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
150.000
|
$150.000
|
$130.000
|
$200.000
|
$100.000
|
$125.000
|
$150.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
80.000
|
$200.000
|
$195.000
|
$200.000
|
$210.000
|
$210.000
|
$200.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
1.500
|
$800.000
|
$1,200.000
|
$2,100.000
|
$2,000.000
|
$1,500.000
|
$1,800.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
21.800
|
$500.000
|
$600.000
|
$550.000
|
$632.000
|
$850.000
|
$650.000
|
|
|
RAIL (TY T221) (MOD)
|
LF
|
10.000
|
$500.000
|
$325.000
|
$600.000
|
$55.000
|
$210.000
|
$600.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
50.000
|
$100.000
|
$95.000
|
$65.000
|
$80.000
|
$45.000
|
$80.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
7.000
|
$2,000.000
|
$1,600.000
|
$1,200.000
|
$1,400.000
|
$1,000.000
|
$1,500.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$25,000.000
|
$17,500.000
|
$31,000.000
|
$36,750.000
|
$25,000.000
|
$30,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,300.000
|
$1,000.000
|
$1,600.000
|
$2,000.000
|
$1,800.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$400.000
|
$250.000
|
$550.000
|
$650.000
|
$1,500.000
|
$150.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
1.000
|
$1,000.000
|
$315.000
|
$260.000
|
$325.000
|
$1,000.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$56,000.000
|
$70,000.000
|
$55,000.000
|
$40,000.000
|
$110,000.000
|
$85,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$6,000.000
|
$7,500.000
|
$3,000.000
|
$3,200.000
|
$12,500.000
|
$4,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,620.000
|
$5.000
|
$2.450
|
$3.500
|
$1.600
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,620.000
|
$2.500
|
$1.370
|
$1.000
|
$0.600
|
$2.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,160.000
|
$8.000
|
$3.050
|
$3.000
|
$3.250
|
$12.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
910.000
|
$4.000
|
$6.450
|
$4.000
|
$4.750
|
$12.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
250.000
|
$4.000
|
$1.370
|
$0.500
|
$1.000
|
$8.000
|
$1.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
86.000
|
$20.000
|
$37.000
|
$25.000
|
$34.250
|
$50.000
|
$40.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
192.000
|
$60.000
|
$75.000
|
$90.000
|
$94.070
|
$125.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$25.000
|
$19.500
|
$24.000
|
$23.000
|
$25.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$30.000
|
$53.000
|
$75.000
|
$72.000
|
$50.000
|
$130.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$10.000
|
$4.250
|
$8.000
|
$7.000
|
$3.000
|
$8.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,100.000
|
$2,500.000
|
$2,400.000
|
$2,850.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$265.000
|
$550.000
|
$500.000
|
$1,000.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
1.000
|
$10,000.000
|
$12,750.000
|
$12,500.000
|
$12,000.000
|
$15,000.000
|
$13,000.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
7.000
|
$2,000.000
|
$4,000.000
|
$5,200.000
|
$7,526.210
|
$2,000.000
|
$5,500.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
1.000
|
$3,000.000
|
$4,750.000
|
$5,300.000
|
$5,600.000
|
$3,100.000
|
$6,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
90.000
|
$8.000
|
$15.750
|
$15.000
|
$16.000
|
$15.000
|
$16.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
90.000
|
$1.350
|
$3.150
|
$3.500
|
$3.350
|
$2.000
|
$4.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
180.000
|
$1.650
|
$3.150
|
$3.500
|
$3.350
|
$2.000
|
$4.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
8.000
|
$850.000
|
$900.000
|
$1,200.000
|
$1,275.000
|
$650.000
|
$1,400.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,000.000
|
$5,700.000
|
$7,900.000
|
$8,400.000
|
$5,000.000
|
$9,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
12.000
|
$400.000
|
$370.000
|
$450.000
|
$530.000
|
$500.000
|
$800.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
1.000
|
$150.000
|
$315.000
|
$250.000
|
$165.000
|
$100.000
|
$285.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
1.000
|
$150.000
|
$318.000
|
$250.000
|
$165.000
|
$100.000
|
$285.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
14.000
|
$25.000
|
$21.000
|
$45.000
|
$17.000
|
$100.000
|
$5.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
13.000
|
$25.000
|
$5.250
|
$45.000
|
$37.000
|
$100.000
|
$42.000
|
|
|
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
|
EA
|
3.000
|
$75.000
|
$53.000
|
$125.000
|
$2.000
|
$100.000
|
$80.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
80.000
|
$3.000
|
$0.630
|
$1.000
|
$1.500
|
$10.000
|
$3.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
51.000
|
$0.500
|
$1.670
|
$1.800
|
$2.400
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
350.000
|
$1.000
|
$1.150
|
$1.200
|
$1.700
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
60.000
|
$5.200
|
$6.240
|
$6.500
|
$9.000
|
$20.000
|
$7.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$140.000
|
$127.000
|
$130.000
|
$180.000
|
$250.000
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$170.000
|
$147.000
|
$150.000
|
$210.000
|
$250.000
|
$200.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
200.000
|
$4.100
|
$3.250
|
$3.500
|
$4.600
|
$6.500
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
840.000
|
$0.500
|
$0.460
|
$0.500
|
$0.650
|
$6.500
|
$0.600
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,070.000
|
$0.500
|
$0.460
|
$0.500
|
$0.650
|
$1.000
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,000.000
|
$0.500
|
$0.460
|
$0.500
|
$0.650
|
$1.000
|
$0.600
|
|
REFL PAV MRKR TY I-C
|
EA
|
60.000
|
$6.000
|
$4.200
|
$4.500
|
$6.000
|
$15.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
110.000
|
$6.000
|
$4.200
|
$4.500
|
$6.000
|
$15.000
|
$6.000
|
|
Totals: |
$783,988.500
|
$706,189.820
|
$777,552.800
|
$804,713.010
|
$1,021,453.000
|
$1,065,944.000
|