PREPARING ROW
|
AC
|
1.400
|
$6,000.000
|
$25,000.000
|
$160,000.000
|
$20,000.000
|
$17,600.000
|
$4,000.000
|
$6,500.000
|
$14,000.000
|
|
|
PREPARING ROW
|
STA
|
39.000
|
$3,000.000
|
$500.000
|
$5,825.000
|
$8,250.000
|
$3,287.000
|
$650.000
|
$8,000.000
|
$1,200.000
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
7.000
|
$1,000.000
|
$750.000
|
$625.420
|
$700.000
|
$898.000
|
$1,000.000
|
$500.000
|
$1,000.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
11.000
|
$1,750.000
|
$1,500.000
|
$1,050.640
|
$1,400.000
|
$1,683.000
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
78.000
|
$10.000
|
$15.000
|
$20.890
|
$15.000
|
$8.000
|
$20.000
|
$15.000
|
$20.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
57.000
|
$15.000
|
$15.000
|
$14.290
|
$20.000
|
$7.000
|
$20.000
|
$15.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
11,497.000
|
$4.000
|
$2.500
|
$1.160
|
$0.500
|
$3.000
|
$2.000
|
$4.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,329.000
|
$12.000
|
$10.000
|
$4.110
|
$8.000
|
$21.000
|
$10.000
|
$25.000
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
5,555.000
|
$8.000
|
$10.000
|
$8.600
|
$15.000
|
$22.000
|
$5.000
|
$20.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
23,360.000
|
$15.000
|
$14.000
|
$21.320
|
$15.000
|
$25.000
|
$8.000
|
$25.000
|
$20.000
|
|
|
SPEC EXCAV WORK (VEHICLE)
|
CY
|
905.000
|
$20.000
|
$20.000
|
$19.580
|
$15.000
|
$27.000
|
$15.000
|
$30.000
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
26,466.000
|
$1.000
|
$1.000
|
$0.200
|
$2.250
|
$3.000
|
$0.750
|
$3.000
|
$2.000
|
|
|
FURNISHING AND PLACING TOPSOIL (3")
|
SY
|
2,083.000
|
$2.000
|
$1.500
|
$0.320
|
$4.000
|
$2.000
|
$2.750
|
$3.000
|
$6.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
26,466.000
|
$0.500
|
$0.150
|
$0.290
|
$0.150
|
$0.190
|
$0.150
|
$0.200
|
$0.500
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
26,466.000
|
$0.150
|
$0.150
|
$0.230
|
$0.100
|
$0.180
|
$0.150
|
$0.200
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
433.000
|
$20.000
|
$10.000
|
$19.230
|
$15.000
|
$41.000
|
$10.000
|
$40.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
950.000
|
$2.000
|
$2.000
|
$3.440
|
$2.000
|
$3.000
|
$2.500
|
$3.000
|
$1.500
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
3,142.000
|
$50.000
|
$40.000
|
$37.530
|
$40.000
|
$32.000
|
$35.000
|
$65.000
|
$75.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
2,102.000
|
$6.000
|
$4.000
|
$3.350
|
$3.400
|
$4.000
|
$3.850
|
$4.500
|
$6.000
|
|
|
ASPH (CRS-2)
|
GAL
|
4,729.000
|
$3.000
|
$3.500
|
$2.600
|
$2.750
|
$3.000
|
$3.250
|
$3.200
|
$8.000
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
78.000
|
$150.000
|
$100.000
|
$196.000
|
$205.000
|
$220.000
|
$135.000
|
$300.000
|
$500.000
|
|
|
CEM STABIL BKFL
|
CY
|
110.000
|
$160.000
|
$120.000
|
$167.620
|
$175.000
|
$112.000
|
$100.000
|
$200.000
|
$250.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,016.000
|
$180.000
|
$210.000
|
$164.360
|
$200.000
|
$222.000
|
$210.000
|
$250.000
|
$200.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
294.000
|
$300.000
|
$300.000
|
$225.280
|
$270.000
|
$281.000
|
$265.000
|
$310.000
|
$275.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
29.000
|
$1,000.000
|
$900.000
|
$900.590
|
$1,200.000
|
$859.000
|
$1,200.000
|
$1,500.000
|
$1,200.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
143.000
|
$1,100.000
|
$900.000
|
$948.280
|
$1,200.000
|
$746.000
|
$1,075.000
|
$1,500.000
|
$1,300.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
39.000
|
$1,200.000
|
$900.000
|
$1,187.020
|
$1,200.000
|
$911.000
|
$2,185.000
|
$1,500.000
|
$1,400.000
|
|
|
CL C CONC (MISC)
|
CY
|
11.200
|
$900.000
|
$1,200.000
|
$1,360.760
|
$1,250.000
|
$564.000
|
$1,575.000
|
$700.000
|
$500.000
|
|
|
REINF CONC SLAB
|
SF
|
33,600.000
|
$15.000
|
$15.000
|
$19.980
|
$19.250
|
$15.000
|
$22.000
|
$25.000
|
$22.000
|
|
|
APPROACH SLAB
|
CY
|
48.000
|
$500.000
|
$600.000
|
$584.740
|
$530.000
|
$492.000
|
$540.000
|
$850.000
|
$700.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
13,603.000
|
$50.000
|
$60.000
|
$47.430
|
$75.000
|
$63.000
|
$87.000
|
$85.000
|
$150.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
3,582.630
|
$145.000
|
$150.000
|
$147.790
|
$150.000
|
$208.000
|
$188.000
|
$200.000
|
$200.000
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
598.000
|
$200.000
|
$200.000
|
$188.290
|
$210.000
|
$316.000
|
$250.000
|
$250.000
|
$450.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4.000
|
$450.000
|
$500.000
|
$576.240
|
$450.000
|
$502.000
|
$850.000
|
$550.000
|
$800.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
462.000
|
$450.000
|
$350.000
|
$351.860
|
$450.000
|
$404.000
|
$500.000
|
$550.000
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
76.000
|
$115.000
|
$175.000
|
$185.350
|
$200.000
|
$123.000
|
$120.000
|
$130.000
|
$225.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
70.000
|
$425.000
|
$450.000
|
$555.340
|
$500.000
|
$437.000
|
$530.000
|
$550.000
|
$500.000
|
|
|
RAIL (TY T1W)
|
LF
|
3,249.000
|
$140.000
|
$190.000
|
$144.600
|
$140.000
|
$157.000
|
$217.000
|
$160.000
|
$220.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
156.000
|
$110.000
|
$125.000
|
$99.710
|
$110.000
|
$107.000
|
$135.000
|
$120.000
|
$100.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
50.000
|
$100.000
|
$125.000
|
$80.420
|
$120.000
|
$50.000
|
$98.000
|
$150.000
|
$120.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
66.000
|
$60.000
|
$60.000
|
$78.210
|
$70.000
|
$67.000
|
$55.000
|
$70.000
|
$140.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
110.000
|
$75.000
|
$80.000
|
$77.500
|
$90.000
|
$123.000
|
$75.000
|
$95.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
123.000
|
$100.000
|
$110.000
|
$92.630
|
$105.000
|
$157.000
|
$100.000
|
$150.000
|
$150.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$800.000
|
$900.000
|
$1,235.560
|
$1,200.000
|
$954.000
|
$900.000
|
$1,800.000
|
$3,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,200.000
|
$1,540.390
|
$1,500.000
|
$1,066.000
|
$1,200.000
|
$2,800.000
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,600.000
|
$2,000.000
|
$4,195.870
|
$4,000.000
|
$2,244.000
|
$1,750.000
|
$4,500.000
|
$3,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,300.000
|
$1,500.000
|
$861.710
|
$900.000
|
$842.000
|
$900.000
|
$5,000.000
|
$4,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
376.000
|
$15.000
|
$10.000
|
$9.770
|
$9.000
|
$34.000
|
$17.000
|
$15.000
|
$10.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$25,000.000
|
$48,404.000
|
$65,000.000
|
$44,880.000
|
$59,000.000
|
$175,000.000
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$525,000.000
|
$501,000.000
|
$548,000.000
|
$350,000.000
|
$400,000.000
|
$580,000.000
|
$750,000.000
|
$680,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$5,000.000
|
$3,000.000
|
$2,663.560
|
$5,000.000
|
$2,805.000
|
$2,000.000
|
$3,000.000
|
$2,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
192.000
|
$30.000
|
$25.000
|
$26.990
|
$30.000
|
$29.000
|
$27.000
|
$30.000
|
$1.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
192.000
|
$9.000
|
$5.000
|
$7.890
|
$5.000
|
$14.000
|
$12.500
|
$13.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$25.000
|
$10.000
|
$23.450
|
$30.000
|
$25.000
|
$12.000
|
$35.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$8.000
|
$3.000
|
$8.390
|
$5.000
|
$8.000
|
$2.000
|
$8.000
|
$1.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
313.000
|
$5.000
|
$3.500
|
$3.750
|
$5.000
|
$6.000
|
$5.000
|
$12.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,393.000
|
$3.000
|
$3.000
|
$2.280
|
$4.000
|
$3.000
|
$4.500
|
$3.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,393.000
|
$1.000
|
$0.500
|
$0.480
|
$0.500
|
$1.000
|
$0.470
|
$0.500
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,298.000
|
$45.000
|
$25.000
|
$24.290
|
$30.000
|
$15.000
|
$26.000
|
$65.000
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
4,751.000
|
$0.200
|
$1.000
|
$0.220
|
$0.550
|
$1.120
|
$1.000
|
$1.000
|
$2.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
2,152.000
|
$0.200
|
$1.000
|
$0.250
|
$0.550
|
$1.120
|
$1.000
|
$1.000
|
$1.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
612.500
|
$26.000
|
$32.000
|
$26.680
|
$30.000
|
$29.000
|
$28.000
|
$29.000
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$1,750.000
|
$2,500.000
|
$2,051.280
|
$1,900.000
|
$2,014.000
|
$2,650.000
|
$2,100.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$2.500
|
$5.000
|
$2.460
|
$2.300
|
$2.000
|
$2.500
|
$2.000
|
$3.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$250.000
|
$300.000
|
$189.220
|
$80.000
|
$112.000
|
$200.000
|
$120.000
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,600.000
|
$3,000.000
|
$2,927.030
|
$2,500.000
|
$5,610.000
|
$3,000.000
|
$2,600.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$300.000
|
$204.730
|
$265.000
|
$135.000
|
$215.000
|
$150.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$7,500.000
|
$25,000.000
|
$22,392.960
|
$21,000.000
|
$7,349.000
|
$24,000.000
|
$26,000.000
|
$24,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
862.000
|
$12.000
|
$15.000
|
$7.000
|
$12.000
|
$22.000
|
$10.750
|
$15.000
|
$20.000
|
|
|
GATE (TY 1)
|
EA
|
3.000
|
$2,200.000
|
$1,000.000
|
$2,500.000
|
$1,500.000
|
$2,805.000
|
$1,650.000
|
$950.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$540.000
|
$500.000
|
$615.340
|
$650.000
|
$505.000
|
$475.000
|
$520.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$660.000
|
$600.000
|
$722.790
|
$750.000
|
$617.000
|
$580.000
|
$650.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$960.000
|
$800.000
|
$857.390
|
$900.000
|
$842.000
|
$790.000
|
$900.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
15.000
|
$2,300.000
|
$3,200.000
|
$3,710.340
|
$4,000.000
|
$3,254.000
|
$3,000.000
|
$4,200.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
40.000
|
$100.000
|
$125.000
|
$85.930
|
$85.000
|
$112.000
|
$100.000
|
$45.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
32.000
|
$25.000
|
$30.000
|
$18.160
|
$20.000
|
$22.000
|
$19.000
|
$21.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
11.000
|
$30.000
|
$50.000
|
$32.250
|
$35.000
|
$39.000
|
$34.000
|
$37.000
|
$30.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
75.000
|
$8.000
|
$10.000
|
$6.000
|
$6.250
|
$7.000
|
$10.500
|
$8.000
|
$10.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
4,360.000
|
$0.400
|
$0.250
|
$0.220
|
$0.230
|
$1.000
|
$0.210
|
$0.600
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,516.000
|
$0.350
|
$0.500
|
$0.430
|
$0.450
|
$1.000
|
$0.530
|
$0.900
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
7,398.000
|
$0.350
|
$0.500
|
$0.430
|
$0.450
|
$1.000
|
$0.530
|
$0.900
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
92.000
|
$3.000
|
$10.000
|
$4.550
|
$4.600
|
$9.000
|
$15.800
|
$10.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,360.000
|
$0.100
|
$0.190
|
$0.130
|
$0.140
|
$1.000
|
$0.160
|
$0.550
|
$0.500
|
|
|
D-GR HMA TY-C SAC-B PG64-22 (EXEMPT)
|
TON
|
1,433.000
|
$120.000
|
$70.000
|
$97.500
|
$110.000
|
$109.000
|
$85.000
|
$120.000
|
$140.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$6,000.000
|
$10,000.000
|
$1,051.180
|
$10,000.000
|
$1,795.000
|
$5,000.000
|
$18,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
10.000
|
$70.000
|
$150.000
|
$325.860
|
$300.000
|
$449.000
|
$350.000
|
$300.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$60.000
|
$50.000
|
$71.490
|
$30.000
|
$90.000
|
$50.000
|
$30.000
|
$25.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
LS
|
1.000
|
$50,000.000
|
$25,000.000
|
$35,000.000
|
$60,000.000
|
$7,862.000
|
$7,250.000
|
$50,000.000
|
$5,000.000
|
|
Totals: |
$5,176,663.750
|
$5,087,623.200
|
$5,485,565.910
|
$5,756,148.150
|
$5,760,286.120
|
$5,973,525.370
|
$7,560,334.800
|
$7,928,367.700
|