|
|
PREPARING ROW
|
STA
|
122.000
|
$2,500.000
|
$1,000.000
|
$732.000
|
$800.000
|
$565.000
|
$4,925.000
|
$6,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
508.000
|
$45.000
|
$20.000
|
$8.000
|
$25.000
|
$18.000
|
$16.320
|
$23.150
|
|
|
RMV (6"-10") TRT/UNTRT BASE & ASPH PAV
|
SY
|
59.000
|
$25.000
|
$20.000
|
$25.000
|
$7.000
|
$30.000
|
$40.000
|
$34.050
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
902.000
|
$25.000
|
$15.000
|
$4.000
|
$9.000
|
$20.000
|
$11.150
|
$9.260
|
|
|
EXCAV (ROADWAY)
|
CY
|
672.000
|
$25.000
|
$25.000
|
$14.500
|
$29.000
|
$15.000
|
$20.000
|
$35.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
9,599.000
|
$18.000
|
$25.000
|
$43.500
|
$29.000
|
$16.000
|
$27.670
|
$35.020
|
|
|
BACKFILL (TY B)
|
STA
|
100.000
|
$200.000
|
$150.000
|
$130.000
|
$415.000
|
$675.000
|
$747.270
|
$243.160
|
|
|
BLADING
|
STA
|
4.000
|
$110.160
|
$800.000
|
$850.000
|
$400.000
|
$360.000
|
$2,962.380
|
$231.520
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
47,461.000
|
$1.500
|
$0.500
|
$1.100
|
$1.250
|
$1.750
|
$0.310
|
$1.870
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
47,461.000
|
$0.220
|
$0.230
|
$0.190
|
$0.210
|
$0.380
|
$0.160
|
$0.540
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
47,461.000
|
$0.170
|
$0.210
|
$0.170
|
$0.190
|
$0.310
|
$0.160
|
$0.420
|
|
|
VEGETATIVE WATERING
|
TGL
|
772.000
|
$37.000
|
$20.000
|
$42.000
|
$1.000
|
$35.000
|
$36.950
|
$46.300
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
|
SY
|
4,894.000
|
$5.000
|
$2.300
|
$2.000
|
$2.250
|
$1.680
|
$2.830
|
$2.720
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
10,040.000
|
$70.000
|
$60.000
|
$62.000
|
$65.000
|
$62.000
|
$52.450
|
$102.500
|
|
|
FL BS (RDWY DEL)(TY D GR 3)(FINAL POS)
|
CY
|
4,822.000
|
$55.000
|
$47.000
|
$44.000
|
$45.000
|
$60.000
|
$53.580
|
$102.500
|
|
|
REWORK BS MTL (TY C)(8")(ORD COMP)
|
STA
|
119.000
|
$800.000
|
$430.000
|
$700.000
|
$750.000
|
$1,185.000
|
$1,527.930
|
$385.870
|
|
|
CEMENT
|
TON
|
526.000
|
$255.000
|
$240.000
|
$250.000
|
$232.000
|
$280.000
|
$244.820
|
$381.330
|
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
43,868.000
|
$2.250
|
$3.000
|
$4.150
|
$3.000
|
$3.000
|
$5.850
|
$3.860
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
70,189.000
|
$3.270
|
$3.400
|
$3.600
|
$2.000
|
$3.350
|
$5.000
|
$6.540
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
4,387.000
|
$4.080
|
$5.250
|
$5.000
|
$4.000
|
$4.800
|
$2.600
|
$8.720
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
15,354.000
|
$5.000
|
$3.600
|
$4.500
|
$4.300
|
$6.550
|
$5.850
|
$8.720
|
|
|
ASPH (CRS-2P)
|
GAL
|
26,321.000
|
$5.500
|
$3.500
|
$3.900
|
$3.500
|
$4.400
|
$3.900
|
$8.720
|
|
|
AGGR (TY-PD OR PL, GR-4)
|
CY
|
325.000
|
$125.000
|
$140.000
|
$240.000
|
$195.000
|
$270.000
|
$240.000
|
$272.380
|
|
|
AGGR (TY-D OR L,GR-3)
|
CY
|
462.000
|
$230.000
|
$100.000
|
$170.000
|
$185.000
|
$201.000
|
$180.000
|
$250.590
|
|
|
CUT & RESTORING PAV
|
SY
|
288.000
|
$125.000
|
$25.000
|
$150.000
|
$87.000
|
$98.000
|
$59.600
|
$141.790
|
|
|
CEM STABIL BKFL
|
CY
|
448.800
|
$275.000
|
$200.000
|
$239.000
|
$275.000
|
$250.000
|
$155.170
|
$198.830
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,961.000
|
$40.000
|
$12.000
|
$0.750
|
$2.000
|
$22.500
|
$4.120
|
$9.260
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
80.000
|
$200.000
|
$180.000
|
$133.050
|
$200.000
|
$146.000
|
$105.340
|
$173.650
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
650.000
|
$280.000
|
$300.000
|
$236.990
|
$375.000
|
$333.000
|
$203.050
|
$355.400
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
111.200
|
$1,200.000
|
$1,280.000
|
$1,200.000
|
$1,250.000
|
$1,240.000
|
$954.010
|
$1,681.110
|
|
|
REINF CONC SLAB
|
SF
|
7,600.000
|
$25.000
|
$28.000
|
$30.000
|
$31.000
|
$43.000
|
$45.000
|
$34.170
|
|
|
APPROACH SLAB
|
CY
|
153.700
|
$700.000
|
$920.000
|
$680.000
|
$650.000
|
$660.000
|
$550.820
|
$637.280
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
944.750
|
$187.500
|
$220.000
|
$259.000
|
$310.000
|
$330.000
|
$226.930
|
$281.400
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
99.000
|
$650.000
|
$650.000
|
$550.000
|
$750.000
|
$705.000
|
$450.000
|
$343.340
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
3,117.000
|
$200.000
|
$150.000
|
$110.000
|
$145.000
|
$140.000
|
$126.270
|
$100.230
|
|
|
RAIL (TY T223)
|
LF
|
478.000
|
$154.670
|
$190.000
|
$155.000
|
$155.000
|
$185.000
|
$89.080
|
$260.190
|
|
|
ARMOR JOINT
|
LF
|
156.000
|
$150.000
|
$95.000
|
$110.000
|
$125.000
|
$150.000
|
$82.330
|
$83.260
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
568.000
|
$125.000
|
$85.000
|
$105.000
|
$102.000
|
$118.000
|
$125.790
|
$78.530
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
198.000
|
$178.600
|
$150.000
|
$155.000
|
$342.000
|
$210.000
|
$286.130
|
$137.550
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,800.000
|
$1,500.000
|
$1,825.000
|
$1,920.000
|
$1,600.000
|
$1,653.010
|
$1,798.040
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$3,000.000
|
$1,600.000
|
$2,425.000
|
$1,935.000
|
$2,050.000
|
$2,201.580
|
$1,906.630
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$3,200.000
|
$1,700.000
|
$2,425.000
|
$2,265.000
|
$2,450.000
|
$2,384.410
|
$2,168.110
|
|
|
REMOV STR (PIPE)
|
LF
|
671.000
|
$18.000
|
$14.000
|
$20.000
|
$12.000
|
$34.000
|
$10.120
|
$20.700
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$36,000.000
|
$30,000.000
|
$35,000.000
|
$47,000.000
|
$23,000.000
|
$90,000.000
|
$36,716.280
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$342,050.210
|
$372,000.000
|
$510,000.000
|
$485,000.000
|
$375,000.000
|
$596,577.220
|
$615,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$10,000.000
|
$4,000.000
|
$9,600.000
|
$19,800.000
|
$6,890.000
|
$8,500.000
|
$6,408.460
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,040.000
|
$12,000.000
|
$2,700.000
|
$15,000.000
|
$19,500.000
|
$15,458.300
|
$6,101.220
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$35.000
|
$40.000
|
$35.000
|
$55.000
|
$67.000
|
$55.120
|
$51.750
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$12.840
|
$10.000
|
$10.000
|
$25.000
|
$45.000
|
$24.230
|
$40.860
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,030.000
|
$4.630
|
$4.000
|
$2.950
|
$6.200
|
$4.750
|
$8.370
|
$4.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,030.000
|
$1.500
|
$1.000
|
$1.000
|
$1.100
|
$1.400
|
$1.240
|
$1.090
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,067.000
|
$59.150
|
$40.000
|
$95.780
|
$55.000
|
$70.000
|
$84.540
|
$54.480
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,406.000
|
$32.000
|
$40.000
|
$28.500
|
$32.000
|
$33.000
|
$27.000
|
$33.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,400.000
|
$2,500.000
|
$2,700.000
|
$3,000.000
|
$2,850.000
|
$2,200.000
|
$2,287.960
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,000.000
|
$3,300.000
|
$2,877.500
|
$3,000.000
|
$3,575.000
|
$2,800.000
|
$3,186.800
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$500.000
|
$700.000
|
$605.220
|
$670.000
|
$680.000
|
$605.220
|
$653.700
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
6.000
|
$320.000
|
$250.000
|
$374.220
|
$400.000
|
$420.000
|
$374.220
|
$245.140
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$300.000
|
$300.000
|
$377.220
|
$420.000
|
$425.000
|
$377.220
|
$288.720
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$810.950
|
$800.000
|
$721.420
|
$800.000
|
$800.000
|
$721.420
|
$800.790
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$1,000.000
|
$1,500.000
|
$1,041.340
|
$1,150.000
|
$1,165.000
|
$1,041.340
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
4.000
|
$1,100.000
|
$1,500.000
|
$1,292.380
|
$1,425.000
|
$1,445.000
|
$1,292.380
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,200.000
|
$1,200.000
|
$1,033.020
|
$1,145.000
|
$1,160.000
|
$1,033.020
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
17.000
|
$668.030
|
$600.000
|
$482.260
|
$535.000
|
$540.000
|
$482.260
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$650.000
|
$700.000
|
$563.960
|
$625.000
|
$630.000
|
$563.960
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$200.000
|
$150.000
|
$742.000
|
$165.000
|
$825.550
|
$742.000
|
$200.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
31.000
|
$297.400
|
$750.000
|
$450.000
|
$222.000
|
$104.000
|
$92.740
|
$729.970
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
4.000
|
$20.000
|
$30.000
|
$20.000
|
$45.000
|
$41.000
|
$36.940
|
$25.060
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
25.000
|
$25.000
|
$60.000
|
$45.000
|
$60.000
|
$67.000
|
$59.750
|
$48.480
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
8.000
|
$75.000
|
$80.000
|
$50.000
|
$100.000
|
$67.000
|
$59.810
|
$70.820
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
23,930.000
|
$0.540
|
$0.500
|
$0.300
|
$0.270
|
$0.270
|
$0.370
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
1,500.000
|
$0.170
|
$0.500
|
$1.000
|
$0.390
|
$0.390
|
$0.380
|
$0.410
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
18,260.000
|
$0.930
|
$0.500
|
$0.300
|
$0.380
|
$0.380
|
$0.370
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,197.000
|
$1.140
|
$1.500
|
$1.200
|
$1.000
|
$2.170
|
$3.200
|
$2.720
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,336.000
|
$0.250
|
$1.500
|
$1.200
|
$1.500
|
$2.170
|
$1.500
|
$2.720
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
69.000
|
$12.000
|
$15.000
|
$15.000
|
$22.000
|
$22.350
|
$13.500
|
$14.710
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
26,915.000
|
$0.820
|
$0.900
|
$0.870
|
$1.200
|
$1.230
|
$0.880
|
$0.960
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
20,972.000
|
$0.750
|
$0.900
|
$0.870
|
$1.200
|
$1.230
|
$0.880
|
$0.960
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
1,880.000
|
$0.880
|
$0.900
|
$1.400
|
$1.200
|
$1.230
|
$0.880
|
$0.960
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
608.000
|
$4.950
|
$7.000
|
$6.250
|
$6.750
|
$7.240
|
$4.950
|
$5.390
|
|
|
PREFORMED IN-LANE (TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$20.000
|
$25.000
|
$15.000
|
$21.000
|
$21.230
|
$20.500
|
$20.650
|
|
Totals: |
$5,558,480.255
|
$4,787,271.590
|
$5,167,109.530
|
$5,342,312.650
|
$5,498,498.000
|
$6,031,382.000
|
$7,263,534.762
|