CROCKETT IH 10 (0140-13-023)

Items: 111

County: CROCKETT
Length: 0.0000 MILES (1.2486 MILES)
Highway: IH 10
District: SAN ANGELO
Control Number: 0140-13-023
DBE Goal: 0.0%
Project: F 2026(932)
Guaranty: $100,000.00
Time: 261 WORKING DAYS
Engineer's Estimate: $19,998,294.70
Date: 08/06/2026 1:00 PM CDT (6 weeks ago) Changed
Contract Number: 8263008
Type: CONSTRUCT REST AREA
Project ID: A00140254
Contract Type: FEDERAL
Project Description: CONSTRUCT NEW TRUCK PARKING AREA
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (6)
E
Engineer's Estimate
$19,998,294.70
$13,741,321.18
Over/Under Est: -31.29% -$6,256,973.52
$16,617,786.23
Over/Under Est: -16.9% -$3,380,508.47
Amt Left: 20.93% $2,876,465.05
$17,441,115.00
Over/Under Est: -12.79% -$2,557,179.70
Amt Left: 26.92% $3,699,793.82
Delta: -4.95% -$823,328.77
$17,698,805.45
Over/Under Est: -11.5% -$2,299,489.25
Amt Left: 28.8% $3,957,484.27
Delta: -1.48% -$257,690.45
$21,530,035.07
Over/Under Est: 7.66% $1,531,740.37
Amt Left: 56.68% $7,788,713.89
Delta: -21.65% -$3,831,229.62
$21,852,939.11
Over/Under Est: 9.27% $1,854,644.41
Amt Left: 59.03% $8,111,617.93
Delta: -1.50% -$322,904.04

Bid Items & Bid Tabulations

111 Total 0 of 111
CROCKETT  |  IH 10  |  SAN ANGELO  |  0140-13-023  |  08/06/2026 1:00 PM CDT  |  $19,998,294.70  |  F 2026(932)  |  CONSTRUCT REST AREA  |  261 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
RELMCO, INC.
ALLEN KELLER COMPANY
CK NEWBERRY, LLC
A. L. HELMCAMP, INC.
FNF CONSTRUCTION, INC.
PREPARING ROW
STA 121.000 $6,000.000 $10,500.000 $2,500.000 $2,119.570 $2,500.000 $5,000.000 $10,000.000
RMV (15"-19") TRT/UNTRT BASE & ASPH PAV
SY 6,385.000 $30.000 $10.800 $5.000 $22.090 $15.000 $34.000 $14.000
EXCAV (ROADWAY)
CY 34,963.000 $20.000 $11.000 $15.000 $21.690 $15.000 $19.000 $15.000
EMBANK (FNL)(DC)(TY B)
CY 70,118.000 $40.000 $11.000 $21.000 $32.920 $25.000 $22.000 $23.250
DRILL SEED (PERM_RURAL_CLAY)
SY 186,168.000 $0.500 $0.100 $0.231 $0.220 $0.250 $0.220 $0.170
DRILL SEED (TEMP_WARM)
SY 93,086.000 $0.500 $0.100 $0.190 $0.180 $0.150 $0.180 $0.150
DRILL SEED (TEMP_COOL)
SY 93,086.000 $0.500 $0.100 $0.190 $0.180 $0.150 $0.180 $0.150
VEGETATIVE WATERING
TGL 3,133.000 $200.000 $5.000 $50.000 $39.900 $15.000 $40.000 $70.000
CEMENT
TON 356.000 $275.000 $300.000 $300.000 $314.080 $300.000 $350.000 $380.000
CEMENT TRT (EXIST MATL & NEW BASE)(6")
SY 36,978.000 $3.500 $2.300 $3.000 $4.510 $2.000 $6.200 $6.750
CEMENT TRT (EXIST MATL & NEW BASE)(8")
SY 13,633.000 $2.000 $2.400 $3.000 $5.100 $3.000 $7.200 $6.750
PRIME COAT(MC-30 OR AE-P)
GAL 10,234.000 $8.000 $5.000 $5.000 $7.650 $5.000 $7.000 $6.000
D-GR HMA TY-B PG64-22
TON 8,087.000 $150.000 $135.000 $189.000 $191.900 $155.000 $192.000 $140.000
D-GR HMA TY-B PG70-22
TON 1,949.000 $200.000 $142.000 $194.000 $198.960 $165.000 $238.000 $147.000
SP MIXES SP-C SAC-A PG76-22
TON 1,548.000 $200.000 $167.000 $215.000 $222.520 $200.000 $255.000 $166.000
TACK COAT
GAL 708.000 $10.000 $11.000 $7.000 $24.620 $5.000 $15.000 $6.500
CONC PVMT (CRCP) (9")
SY 36,488.000 $150.000 $80.000 $155.000 $119.490 $140.000 $172.000 $230.000
FLOWABLE BACKFILL
CY 645.000 $300.000 $250.000 $175.000 $280.180 $200.000 $350.000 $700.000
TEMPORARY SPL SHORING
SF 990.000 $50.000 $49.000 $35.000 $22.780 $22.000 $75.000 $60.000
DRILL SHAFT (42 IN)
LF 114.000 $700.000 $485.000 $521.380 $683.380 $525.000 $700.000 $700.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 94.000 $300.000 $255.000 $274.130 $383.100 $225.000 $220.000 $225.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 424.000 $400.000 $305.000 $327.880 $497.000 $325.000 $550.000 $325.000
RIPRAP (CONC)(4 IN)
CY 8.000 $1,100.000 $682.000 $800.000 $1,340.060 $800.000 $2,200.000 $1,600.000
RIPRAP (CONC)(5 IN)
CY 158.000 $800.000 $504.000 $560.000 $678.030 $800.000 $1,000.000 $1,300.000
RIPRAP (CONC)(DISSIPATER)
CY 6.000 $1,400.000 $713.000 $1,500.000 $1,641.780 $1,000.000 $3,000.000 $6,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 43.000 $750.000 $662.000 $575.000 $861.080 $1,000.000 $1,000.000 $1,400.000
CONC BOX CULV (9 FT X 5 FT)
LF 105.000 $1,800.000 $919.000 $1,476.500 $1,736.380 $2,500.000 $2,000.000 $1,400.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 126.000 $1,100.000 $580.000 $727.500 $1,131.240 $1,000.000 $1,000.000 $1,300.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 180.000 $1,200.000 $607.000 $757.500 $1,296.040 $1,200.000 $1,200.000 $1,300.000
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
LF 171.000 $1,500.000 $930.000 $772.500 $1,772.630 $2,250.000 $2,200.000 $1,700.000
RC PIPE (CL III)(24 IN)
LF 53.000 $150.000 $203.000 $128.250 $346.530 $140.000 $90.000 $200.000
RC PIPE (CL III)(30 IN)
LF 188.000 $200.000 $177.000 $157.500 $376.950 $180.000 $130.000 $200.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $10,000.000 $9,245.000 $12,985.000 $12,338.450 $8,000.000 $6,000.000 $8,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 3.000 $40,000.000 $27,208.000 $48,075.000 $49,182.450 $50,000.000 $95,000.000 $36,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $10,000.000 $29,000.000 $23,626.000 $34,907.880 $30,000.000 $26,000.000 $24,000.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $20,000.000 $30,000.000 $23,625.000 $36,978.710 $32,000.000 $28,000.000 $27,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $3,000.000 $2,000.000 $2,410.500 $5,728.700 $2,000.000 $3,000.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 4.000 $6,500.000 $5,200.000 $2,760.000 $2,974.170 $3,000.000 $3,900.000 $4,500.000
CLEAN EXIST CULVERTS
EA 3.000 $6,000.000 $2,413.000 $3,500.000 $6,595.780 $6,500.000 $3,200.000 $44,000.000
REMOV STR (WINGWALL)
EA 3.000 $4,000.000 $1,375.000 $1,200.000 $6,497.900 $4,000.000 $1,200.000 $1,100.000
REMOV STR (BOX CULVERT)
LF 73.000 $100.000 $89.000 $150.000 $302.510 $100.000 $80.000 $125.000
MOBILIZATION
LS 1.000 $2,000,000.000 $1,190,000.000 $1,300,000.000 $1,660,000.670 $1,750,000.000 $1,900,000.000 $2,175,780.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,000.000 $100,000.000 $4,500.000 $9,483.930 $10,000.000 $23,500.000 $33,946.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $15,000.000 $15,400.000 $15,000.000 $45,228.170 $10,000.000 $15,000.000 $11,900.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 176.000 $150.000 $50.000 $55.000 $51.770 $50.000 $52.000 $98.000
ROCK FILTER DAMS (REMOVE)
LF 176.000 $50.000 $15.000 $16.500 $15.530 $15.000 $16.000 $27.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 448.000 $60.000 $38.000 $41.800 $39.350 $38.000 $40.000 $90.000
CONSTRUCTION EXITS (REMOVE)
SY 448.000 $30.000 $11.000 $12.100 $11.390 $11.000 $10.000 $16.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,836.000 $10.000 $4.250 $4.675 $4.400 $4.250 $4.500 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,836.000 $5.000 $1.000 $1.100 $1.040 $1.000 $1.000 $1.300
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,140.000 $7.500 $10.000 $11.000 $10.350 $10.000 $11.000 $16.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,140.000 $3.500 $3.000 $3.300 $3.110 $3.000 $3.000 $1.250
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
LF 15,090.000 $30.000 $47.000 $42.000 $49.770 $75.000 $105.000 $40.000
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 3,030.000 $20.000 $7.400 $8.000 $11.810 $20.000 $34.000 $3.500
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 15,090.000 $15.000 $16.300 $42.000 $10.530 $60.000 $68.000 $5.500
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 5,212.000 $5.000 $2.250 $0.750 $1.560 $3.000 $3.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 551.000 $45.000 $27.750 $29.830 $28.730 $30.000 $47.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $2,500.000 $1,649.750 $1,773.480 $1,708.190 $1,800.000 $2,000.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 188.000 $25.000 $3.250 $3.490 $3.370 $3.250 $5.300 $4.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $1,500.000 $225.000 $241.870 $232.990 $225.000 $430.000 $240.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $4,250.000 $3,449.750 $3,708.480 $3,571.950 $3,500.000 $4,800.000 $3,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $2,000.000 $274.750 $295.360 $284.480 $275.000 $430.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,300.000 $1,113.000 $322.500 $638.830 $2,500.000 $1,200.000 $600.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $635.000 $916.000 $322.500 $639.240 $1,500.000 $1,200.000 $2,500.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 4.000 $10,500.000 $7,572.000 $8,500.000 $958.660 $20,000.000 $10,000.000 $14,000.000
CHAIN LINK FENCE (INSTALL) (8')
LF 6,422.000 $60.000 $54.750 $58.850 $56.690 $55.000 $55.000 $60.000
WIRE FENCE (REMOVE)
LF 6,338.000 $10.000 $3.500 $3.760 $2.960 $3.500 $5.000 $5.500
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 53.000 $6,500.000 $4,900.000 $5,267.500 $5,901.890 $5,000.000 $6,100.000 $5,000.000
CONDT (PVC) (SCH 40) (2")
LF 13,180.000 $10.000 $17.000 $18.280 $17.600 $20.000 $18.000 $18.000
CONDT (PVC) (SCH 40) (3")
LF 4,270.000 $40.000 $18.000 $19.350 $19.670 $18.000 $20.000 $19.000
CONDT (PVC) (SCH 80) (2")
LF 520.000 $35.000 $19.000 $20.430 $22.780 $19.000 $24.000 $20.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 475.000 $50.000 $35.000 $37.630 $54.880 $35.000 $56.000 $37.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 355.000 $60.000 $40.000 $43.000 $61.090 $40.000 $62.000 $42.000
ELEC CONDR (NO.8) BARE
LF 16,810.000 $4.000 $1.700 $1.830 $2.070 $1.750 $2.200 $2.000
ELEC CONDR (NO.8) INSULATED
LF 41,400.000 $1.500 $2.150 $2.310 $2.330 $2.250 $2.400 $2.250
GROUND BOX TY A (122311)W/APRON
EA 11.000 $2,500.000 $1,000.000 $1,075.000 $1,863.760 $1,000.000 $1,900.000 $1,400.000
GROUND BOX TY D (162922)W/APRON
EA 16.000 $3,000.000 $1,200.000 $1,290.000 $2,381.470 $1,200.000 $2,400.000 $1,700.000
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
EA 3.000 $5,000.000 $9,500.000 $10,212.500 $7,869.190 $9,500.000 $8,000.000 $14,000.000
ALUMINUM SIGNS (TY A)
SF 32.000 $75.000 $27.000 $29.030 $34.170 $26.500 $35.000 $35.000
ALUMINUM SIGNS (TY G)
SF 828.000 $50.000 $28.000 $30.100 $44.530 $32.250 $40.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $2,000.000 $921.840 $913.750 $1,206.190 $850.000 $1,200.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 4.000 $1,700.000 $1,062.080 $1,612.500 $1,698.080 $1,500.000 $1,800.000 $1,700.000
INSTALL LRSS (STRUCT STEEL)
LB 6,281.000 $10.000 $8.780 $8.600 $6.480 $7.250 $8.200 $8.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 15,182.000 $2.500 $0.600 $0.645 $0.420 $0.400 $0.450 $0.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 889.000 $2.000 $2.650 $2.850 $0.730 $0.700 $0.750 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,772.000 $2.000 $1.450 $1.560 $0.920 $0.900 $0.950 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,430.000 $5.000 $6.300 $6.770 $4.140 $4.000 $4.500 $4.250
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $500.000 $830.000 $892.250 $186.380 $180.000 $190.000 $185.000
RE PM TY II (W) 6" (BRK)
LF 2,933.000 $1.500 $0.750 $0.810 $0.360 $0.350 $0.380 $0.400
RE PM TY II (W) 6" (DOT)
LF 889.000 $1.500 $1.850 $1.990 $0.420 $0.400 $0.430 $0.450
RE PM TY II (W) 6" (SLD)
LF 16,918.000 $1.500 $0.450 $0.500 $0.360 $0.350 $0.380 $0.400
RE PM TY II (W) 8" (SLD)
LF 6,166.000 $2.500 $0.600 $0.700 $0.570 $0.550 $0.600 $0.600
RE PM TY II (W) 12" (SLD)
LF 1,430.000 $5.000 $2.250 $2.420 $1.550 $1.500 $1.600 $1.600
RE PM TY II (W) (WORD)
EA 4.000 $300.000 $290.000 $311.750 $31.070 $30.000 $32.000 $32.000
RE PM TY II (Y) 6" (SLD)
LF 4,985.000 $1.500 $0.450 $0.480 $0.360 $0.350 $0.400 $0.400
TY I HIGH PERF PM (W)4"(SLD)(100MIL)
LF 6,787.000 $2.000 $2.750 $2.960 $0.730 $0.700 $0.750 $0.800
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 2,933.000 $1.500 $1.400 $1.510 $0.770 $0.750 $0.800 $0.800
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 16,918.000 $1.500 $1.050 $1.130 $0.730 $0.700 $0.750 $0.800
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 4,985.000 $1.500 $1.050 $1.130 $0.770 $0.750 $0.800 $0.800
REFL PAV MRKR TY II-C-R
EA 399.000 $10.000 $7.000 $7.530 $4.140 $4.000 $4.500 $4.250
PAV SURF PREP FOR MRK (4")
LF 6,787.000 $0.600 $0.950 $1.020 $0.350 $0.350 $0.400 $0.400
PAV SURF PREP FOR MRK (6")
LF 18,603.000 $0.600 $0.950 $1.020 $0.360 $0.350 $0.400 $0.400
PAV SURF PREP FOR MRK (12")
LF 887.000 $0.600 $3.000 $3.230 $1.040 $1.000 $1.200 $1.250
SYSTEM INTEGRATION
LS 1.000 $75,000.000 $15,000.000 $16,125.000 $4,555.850 $15,000.000 $5,000.000 $22,000.000
ITS POLE (50 FT) (90 MPH)
EA 2.000 $25,000.000 $15,000.000 $16,125.000 $19,362.350 $15,000.000 $20,000.000 $16,000.000
ITS POLE MNT CAB (TY 2) (CONF 2)
EA 4.000 $9,000.000 $8,100.000 $8,707.500 $7,144.400 $8,100.000 $7,500.000 $9,000.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 4.000 $11,150.000 $6,900.000 $7,417.500 $7,040.860 $6,900.000 $7,200.000 $7,500.000
ITS POLE (30 FT)(90 MPH)
EA 4.000 $12,000.000 $10,500.000 $11,287.500 $12,942.750 $11,000.000 $13,000.000 $11,000.000
INSTALLATION OF CELLULAR MODEM
EA 4.000 $2,400.000 $950.000 $1,021.250 $517.710 $1,000.000 $550.000 $1,006.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 2.000 $7,500.000 $9,945.000 $10,690.880 $14,081.710 $10,000.000 $15,000.000 $15,000.000
ITS SYSTEM SUPPORT EQUIPMENT
LS 1.000 $67,845.000 $19,500.000 $20,962.500 $38,724.700 $20,000.000 $40,000.000 $20,000.000
Totals: $19,998,294.700 $13,741,321.180 $16,617,786.228 $17,441,115.000 $17,698,805.450 $21,530,035.070 $21,852,939.110
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $10,000.00