PREPARING ROW
|
STA
|
21.900
|
$1,000.000
|
$9,500.000
|
$5,300.000
|
$7,000.000
|
$6,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
540.000
|
$25.000
|
$12.000
|
$20.000
|
$20.000
|
$40.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
360.000
|
$15.000
|
$22.000
|
$30.000
|
$25.000
|
$30.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
828.000
|
$20.000
|
$31.000
|
$20.000
|
$20.000
|
$45.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
4,524.000
|
$15.000
|
$16.000
|
$30.000
|
$35.000
|
$42.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
5,316.000
|
$0.150
|
$1.000
|
$1.000
|
$0.800
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
5,316.000
|
$0.150
|
$1.000
|
$1.000
|
$0.800
|
$0.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
10,632.000
|
$0.250
|
$0.650
|
$1.000
|
$0.800
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
2,510.000
|
$1.750
|
$1.950
|
$2.000
|
$4.000
|
$3.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
3,995.000
|
$25.000
|
$33.000
|
$40.000
|
$50.000
|
$40.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
4,881.000
|
$5.000
|
$14.000
|
$10.000
|
$6.000
|
$8.000
|
|
|
ASPH (RC-250)
|
GAL
|
880.000
|
$5.000
|
$14.000
|
$10.000
|
$10.000
|
$12.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
47.000
|
$140.000
|
$400.000
|
$700.000
|
$400.000
|
$450.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
72.000
|
$85.000
|
$400.000
|
$600.000
|
$400.000
|
$260.000
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
29.000
|
$125.000
|
$400.000
|
$700.000
|
$400.000
|
$700.000
|
|
|
CEM STABIL BKFL
|
CY
|
144.000
|
$140.000
|
$225.000
|
$250.000
|
$250.000
|
$185.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
449.000
|
$15.000
|
$32.000
|
$50.000
|
$25.000
|
$65.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
128.000
|
$250.000
|
$135.000
|
$220.000
|
$150.000
|
$125.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
764.000
|
$210.000
|
$362.000
|
$340.000
|
$435.000
|
$450.000
|
|
|
CL C CONC (ABUT)
|
CY
|
58.600
|
$1,300.000
|
$1,050.000
|
$2,500.000
|
$1,800.000
|
$1,491.100
|
|
|
CL C CONC (CAP)
|
CY
|
64.500
|
$1,550.000
|
$1,125.000
|
$2,500.000
|
$1,800.000
|
$1,500.200
|
|
|
CL C CONC (COLUMN)
|
CY
|
43.800
|
$1,250.000
|
$1,125.000
|
$2,000.000
|
$1,800.000
|
$1,826.500
|
|
|
REINF CONC SLAB
|
SF
|
15,040.000
|
$25.500
|
$18.250
|
$30.000
|
$30.000
|
$35.000
|
|
|
APPROACH SLAB
|
CY
|
72.200
|
$600.000
|
$625.000
|
$900.000
|
$800.000
|
$650.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,908.000
|
$170.000
|
$215.000
|
$190.000
|
$160.000
|
$195.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
159.000
|
$650.000
|
$460.000
|
$800.000
|
$700.000
|
$625.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
4.000
|
$750.000
|
$425.000
|
$1,000.000
|
$1,000.000
|
$2,500.000
|
|
|
RAIL (TY SSTR)
|
LF
|
692.000
|
$100.000
|
$115.000
|
$120.000
|
$140.000
|
$70.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
141.000
|
$80.000
|
$90.000
|
$80.000
|
$150.000
|
$90.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$36,000.000
|
$100,000.000
|
$450,000.000
|
$300,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
71.000
|
$5.000
|
$15.000
|
$10.000
|
$10.000
|
$30.000
|
|
|
REMOV STR (PIPE GATE)
|
LF
|
14.000
|
$50.000
|
$100.000
|
$110.000
|
$10.000
|
$150.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$227,351.080
|
$290,000.000
|
$300,000.000
|
$390,000.000
|
$375,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$10,000.000
|
$6,500.000
|
$2,000.000
|
$2,500.000
|
$9,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
28.000
|
$50.000
|
$32.000
|
$40.000
|
$60.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
28.000
|
$15.000
|
$12.000
|
$20.000
|
$10.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$30.000
|
$32.000
|
$10.000
|
$35.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$8.000
|
$15.000
|
$5.000
|
$10.000
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
3,128.000
|
$5.000
|
$6.000
|
$4.000
|
$8.000
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,128.000
|
$1.000
|
$2.000
|
$2.000
|
$1.000
|
$5.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
15.000
|
$3,000.000
|
$2,550.000
|
$5,000.000
|
$10,000.000
|
$3,500.000
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,050.000
|
$50.000
|
$95.000
|
$70.000
|
$90.000
|
$105.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
935.000
|
$10.000
|
$16.000
|
$30.000
|
$15.000
|
$12.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,050.000
|
$20.000
|
$16.000
|
$40.000
|
$15.000
|
$25.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
400.000
|
$25.000
|
$29.000
|
$30.000
|
$30.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,850.000
|
$1,900.000
|
$1,200.000
|
$1,600.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$5.000
|
$3.000
|
$5.000
|
$3.000
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$300.000
|
$300.000
|
$800.000
|
$200.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,750.000
|
$2,950.000
|
$2,800.000
|
$2,800.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$300.000
|
$300.000
|
$1,000.000
|
$200.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$2,500.000
|
$5,000.000
|
$2,000.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$250.000
|
$2,500.000
|
$5,000.000
|
$600.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$28,500.000
|
$20,000.000
|
$9,000.000
|
$12,500.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
69.000
|
$15.000
|
$22.000
|
$30.000
|
$20.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$700.000
|
$800.000
|
$600.000
|
$500.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$800.000
|
$800.000
|
$600.000
|
$600.000
|
$300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
17.000
|
$100.000
|
$200.000
|
$200.000
|
$65.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$22.000
|
$80.000
|
$12.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$27.000
|
$35.000
|
$60.000
|
$12.000
|
$30.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
60.000
|
$4.000
|
$5.000
|
$25.000
|
$21.000
|
$22.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,805.000
|
$0.700
|
$1.000
|
$2.000
|
$2.500
|
$1.320
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$15.000
|
$1.000
|
$20.000
|
$21.000
|
$22.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,400.000
|
$0.700
|
$1.000
|
$2.000
|
$2.500
|
$1.320
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
7,430.000
|
$0.750
|
$1.500
|
$2.000
|
$2.200
|
$1.650
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
7,430.000
|
$0.750
|
$1.500
|
$2.000
|
$2.200
|
$1.650
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
93.000
|
$3.000
|
$5.000
|
$25.000
|
$21.000
|
$11.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,911.000
|
$1.000
|
$0.750
|
$2.000
|
$3.500
|
$1.650
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$50,000.000
|
$45,000.000
|
$25,000.000
|
$100,000.000
|
$150,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
668.000
|
$90.000
|
$95.000
|
$95.000
|
$75.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
240.000
|
$200.000
|
$175.000
|
$300.000
|
$300.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
32.000
|
$50.000
|
$550.000
|
$30.000
|
$120.000
|
$100.000
|
|
Totals: |
$2,500,861.880
|
$2,965,511.050
|
$3,464,539.000
|
$3,951,926.200
|
$3,959,791.810
|