PREPARING ROW
|
STA
|
15.700
|
$2,500.000
|
$11,500.000
|
$15,211.910
|
$40,000.000
|
$4,280.000
|
$6,000.000
|
|
|
PREP ROW (TREE REMOVE) (0"-12" DIA)
|
EA
|
267.000
|
$500.000
|
$300.000
|
$117.430
|
$59.730
|
$18.200
|
$300.000
|
|
|
PREP ROW (TREE REMOVE) (12"-24" DIA)
|
EA
|
46.000
|
$1,500.000
|
$800.000
|
$33.040
|
$89.590
|
$48.700
|
$750.000
|
|
|
PREP ROW (TREE REMOVE) (24"-36" DIA)
|
EA
|
10.000
|
$2,500.000
|
$1,000.000
|
$165.780
|
$244.880
|
$207.000
|
$1,200.000
|
|
|
PREP ROW (TREE REMOVE) (36"-48" DIA)
|
EA
|
2.000
|
$5,000.000
|
$2,500.000
|
$863.450
|
$519.620
|
$487.000
|
$1,500.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
782.000
|
$45.000
|
$25.000
|
$10.830
|
$35.510
|
$35.300
|
$70.000
|
|
|
RMV (11"-15") TRT/UNTRT BASE & ASPH PAV
|
SY
|
4,235.000
|
$12.000
|
$12.000
|
$9.340
|
$30.100
|
$18.100
|
$17.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
7,783.000
|
$35.000
|
$15.000
|
$6.110
|
$35.840
|
$32.300
|
$1.500
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
13,877.000
|
$20.000
|
$25.000
|
$19.950
|
$50.170
|
$40.600
|
$2.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
3,978.000
|
$1.000
|
$1.320
|
$1.660
|
$3.340
|
$1.030
|
$2.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
3,978.000
|
$1.000
|
$1.340
|
$1.690
|
$0.560
|
$0.910
|
$2.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG)
|
SY
|
1,750.000
|
$3.000
|
$4.390
|
$5.510
|
$5.200
|
$3.620
|
$6.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
2,096.000
|
$100.000
|
$100.000
|
$115.340
|
$66.550
|
$125.000
|
$120.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,077.000
|
$9.000
|
$8.000
|
$8.340
|
$17.920
|
$25.400
|
$18.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
4,366.000
|
$7.000
|
$7.000
|
$6.790
|
$27.470
|
$8.400
|
$8.000
|
|
|
AGGR (TY-PB, GR-3)(SAC-B)
|
CY
|
49.000
|
$210.000
|
$250.000
|
$638.950
|
$238.910
|
$392.000
|
$530.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
42.000
|
$230.000
|
$250.000
|
$745.440
|
$238.910
|
$389.000
|
$530.000
|
|
|
CEM STABIL BKFL
|
CY
|
126.000
|
$405.000
|
$245.000
|
$497.270
|
$226.960
|
$837.000
|
$650.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
132.000
|
$110.000
|
$100.000
|
$111.750
|
$46.590
|
$46.600
|
$300.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,070.000
|
$525.000
|
$625.000
|
$729.280
|
$677.110
|
$789.000
|
$1,088.000
|
|
|
CL C CONC (ABUT)
|
CY
|
57.200
|
$1,815.000
|
$1,650.000
|
$2,258.080
|
$1,931.290
|
$2,380.000
|
$4,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
85.700
|
$2,200.000
|
$1,545.000
|
$2,280.390
|
$2,035.740
|
$2,890.000
|
$4,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
65.600
|
$2,200.000
|
$1,425.000
|
$2,003.030
|
$2,114.360
|
$3,250.000
|
$3,500.000
|
|
|
REINF CONC SLAB
|
SF
|
19,741.000
|
$40.000
|
$32.000
|
$49.210
|
$28.460
|
$43.300
|
$70.000
|
|
|
APPROACH SLAB
|
CY
|
72.200
|
$1,100.000
|
$950.000
|
$1,610.850
|
$974.690
|
$1,300.000
|
$2,000.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
2,704.000
|
$340.000
|
$205.000
|
$281.550
|
$229.460
|
$284.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
92.000
|
$750.000
|
$772.100
|
$1,015.410
|
$811.950
|
$1,240.000
|
$1,300.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
2,836.000
|
$275.000
|
$195.000
|
$171.210
|
$120.650
|
$223.000
|
$260.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
958.000
|
$320.000
|
$205.000
|
$275.090
|
$259.080
|
$250.000
|
$270.000
|
|
|
RAIL (TY SSTR)
|
LF
|
880.000
|
$150.000
|
$125.000
|
$194.560
|
$179.610
|
$284.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
141.000
|
$305.000
|
$235.000
|
$393.130
|
$228.160
|
$402.000
|
$400.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$183,750.000
|
$250,000.000
|
$187,462.150
|
$157,977.600
|
$369,000.000
|
$500,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$603,552.930
|
$550,000.000
|
$651,023.410
|
$670,000.000
|
$873,000.000
|
$909,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$10,000.000
|
$5,000.000
|
$2,848.400
|
$3,414.970
|
$5,040.000
|
$20,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$15,000.000
|
$6,175.350
|
$11,945.380
|
$12,200.000
|
$15,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$100.000
|
$90.000
|
$110.520
|
$83.620
|
$507.000
|
$400.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$35.000
|
$66.120
|
$83.040
|
$37.580
|
$63.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$15.000
|
$22.040
|
$27.690
|
$14.360
|
$18.200
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
2,635.000
|
$8.000
|
$7.000
|
$8.800
|
$12.040
|
$10.500
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,635.000
|
$2.500
|
$2.409
|
$3.030
|
$3.720
|
$3.020
|
$3.500
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
10.000
|
$5,000.000
|
$3,000.000
|
$2,624.870
|
$5,023.030
|
$5,550.000
|
$5,000.000
|
|
|
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
480.000
|
$80.000
|
$45.000
|
$45.840
|
$88.530
|
$34.300
|
$80.000
|
|
|
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
480.000
|
$25.000
|
$25.000
|
$3.880
|
$27.870
|
$13.400
|
$10.000
|
|
|
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
480.000
|
$40.000
|
$35.000
|
$54.790
|
$33.450
|
$11.700
|
$10.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
102.000
|
$60.000
|
$100.000
|
$148.560
|
$61.920
|
$174.000
|
$75.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,725.000
|
$50.000
|
$35.200
|
$44.210
|
$34.820
|
$35.500
|
$40.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$3,000.000
|
$2,640.000
|
$5,249.740
|
$3,135.660
|
$3,190.000
|
$4,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.000
|
$2.750
|
$4.140
|
$5.970
|
$6.100
|
$10.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$150.000
|
$275.000
|
$690.750
|
$328.500
|
$335.000
|
$500.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$275.000
|
$690.760
|
$328.500
|
$335.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$4,000.000
|
$3,410.000
|
$4,835.280
|
$4,300.340
|
$4,380.000
|
$5,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$300.000
|
$275.000
|
$690.750
|
$388.220
|
$395.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$950.000
|
$1,516.780
|
$2,299.480
|
$2,340.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$330.000
|
$1,516.780
|
$1,702.220
|
$1,730.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$15,000.000
|
$7,700.000
|
$10,841.960
|
$10,601.520
|
$10,800.000
|
$15,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
1,250.000
|
$25.000
|
$35.750
|
$18.070
|
$38.820
|
$39.500
|
$40.000
|
|
|
GATE (TY 1)
|
EA
|
2.000
|
$5,000.000
|
$3,206.500
|
$5,180.660
|
$3,482.080
|
$3,550.000
|
$4,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,150.000
|
$385.000
|
$2,210.410
|
$1,791.810
|
$2,510.000
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$200.000
|
$137.500
|
$224.320
|
$358.360
|
$998.000
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
10.000
|
$35.000
|
$25.300
|
$24.810
|
$59.730
|
$55.000
|
$300.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$35.000
|
$27.500
|
$31.710
|
$71.670
|
$59.000
|
$400.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
212.000
|
$7.500
|
$4.400
|
$5.530
|
$7.170
|
$8.100
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
7,120.000
|
$1.500
|
$1.595
|
$2.000
|
$2.090
|
$1.820
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$15.000
|
$13.200
|
$16.580
|
$11.950
|
$9.600
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
8,400.000
|
$1.500
|
$1.595
|
$2.000
|
$2.090
|
$1.820
|
$1.500
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
1,280.000
|
$0.450
|
$1.320
|
$1.660
|
$0.900
|
$2.980
|
$0.900
|
|
RE PM TY II (Y) 6" (BRK)
|
LF
|
1,130.000
|
$0.450
|
$1.430
|
$1.800
|
$0.900
|
$3.040
|
$1.000
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
2,630.000
|
$0.450
|
$1.320
|
$1.660
|
$0.900
|
$2.980
|
$0.900
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
3,580.000
|
$0.750
|
$3.130
|
$3.940
|
$2.990
|
$4.010
|
$2.000
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
3,198.000
|
$0.750
|
$3.130
|
$3.940
|
$2.990
|
$4.010
|
$2.000
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
1,575.000
|
$0.750
|
$3.240
|
$4.080
|
$2.990
|
$4.060
|
$2.000
|
|
PRFB RUMBLE STRIP (BLK)(1 )(CENTERLINE)
|
LF
|
575.000
|
$10.000
|
$7.700
|
$9.670
|
$11.950
|
$7.700
|
$12.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
119.000
|
$10.000
|
$9.900
|
$12.430
|
$8.960
|
$10.100
|
$8.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
14,550.000
|
$2.000
|
$0.380
|
$0.480
|
$1.190
|
$0.830
|
$1.700
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
246.000
|
$10.000
|
$5.770
|
$7.250
|
$4.780
|
$2.640
|
$8.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,040.000
|
$1.000
|
$0.050
|
$0.070
|
$0.300
|
$0.750
|
$0.750
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
736.000
|
$10.000
|
$10.000
|
$2.230
|
$5.970
|
$5.900
|
$10.000
|
|
Totals: |
$6,809,082.180
|
$5,673,708.115
|
$6,571,416.764
|
$6,771,299.780
|
$7,753,530.740
|
$9,091,292.000
|