REMOVING CONC (RIPRAP)
|
SY
|
1,780.000
|
$15.000
|
$15.000
|
$50.000
|
$11.000
|
$11.600
|
$13.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
1,304.000
|
$35.000
|
$25.000
|
$65.000
|
$22.000
|
$50.000
|
$19.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
3,739.000
|
$100.000
|
$20.000
|
$50.000
|
$150.000
|
$22.500
|
$133.000
|
|
|
REMOVE CONC (WINGWALL)
|
CY
|
18.000
|
$110.000
|
$100.000
|
$500.000
|
$500.000
|
$200.000
|
$900.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
271.000
|
$35.000
|
$40.000
|
$500.000
|
$20.000
|
$30.000
|
$61.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,060.000
|
$25.000
|
$10.000
|
$20.000
|
$8.000
|
$4.500
|
$10.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,279.000
|
$30.000
|
$30.000
|
$20.000
|
$50.000
|
$177.000
|
$27.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
1,097.000
|
$20.000
|
$80.000
|
$35.000
|
$50.000
|
$38.000
|
$45.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,935.000
|
$6.000
|
$10.000
|
$10.000
|
$14.000
|
$2.650
|
$7.500
|
|
|
BLOCK SODDING
|
SY
|
1,935.000
|
$10.000
|
$6.000
|
$10.000
|
$6.000
|
$11.000
|
$5.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
1,935.000
|
$0.350
|
$0.100
|
$1.000
|
$1.750
|
$1.400
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
576.000
|
$100.000
|
$1.000
|
$25.000
|
$40.000
|
$58.000
|
$57.500
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
37.000
|
$500.000
|
$400.000
|
$350.000
|
$450.000
|
$293.000
|
$545.500
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
3,034.000
|
$11.000
|
$20.000
|
$12.000
|
$10.000
|
$5.000
|
$11.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
1,200.000
|
$105.000
|
$120.000
|
$120.000
|
$100.000
|
$76.550
|
$138.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
72,566.000
|
$5.000
|
$3.000
|
$6.000
|
$3.000
|
$1.550
|
$2.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,400.000
|
$40.000
|
$50.000
|
$85.000
|
$60.000
|
$75.000
|
$27.500
|
|
|
APPROACH SLAB
|
CY
|
97.000
|
$1,000.000
|
$1,000.000
|
$2,500.000
|
$800.000
|
$605.000
|
$990.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
33,638.000
|
$90.000
|
$70.000
|
$85.000
|
$123.250
|
$91.800
|
$140.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
175.000
|
$242.000
|
$150.000
|
$500.000
|
$300.000
|
$224.000
|
$467.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
62.000
|
$550.000
|
$1,500.000
|
$550.000
|
$900.000
|
$645.000
|
$1,450.500
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
445.000
|
$156.000
|
$210.000
|
$185.000
|
$240.000
|
$240.000
|
$244.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
125.000
|
$675.000
|
$1,000.000
|
$550.000
|
$900.000
|
$540.000
|
$1,059.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
275.000
|
$35.000
|
$50.000
|
$100.000
|
$40.000
|
$41.000
|
$200.000
|
|
|
RAIL (TY T551)
|
LF
|
1,331.000
|
$100.000
|
$233.000
|
$150.000
|
$75.000
|
$115.000
|
$93.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
610.000
|
$168.000
|
$300.000
|
$185.000
|
$200.000
|
$195.000
|
$503.500
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
90.000
|
$180.000
|
$120.000
|
$350.000
|
$250.000
|
$221.650
|
$430.500
|
|
|
RC PIPE (CL IV)(12 IN)
|
LF
|
50.000
|
$90.000
|
$170.000
|
$200.000
|
$240.000
|
$65.000
|
$186.500
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
310.000
|
$110.000
|
$110.000
|
$200.000
|
$150.000
|
$75.000
|
$154.500
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
3.000
|
$7,200.000
|
$10,000.000
|
$12,500.000
|
$4,000.000
|
$3,950.000
|
$7,342.500
|
|
|
INLET (COMPL)(RWI)(TY I)
|
EA
|
2.000
|
$6,500.000
|
$10,000.000
|
$12,500.000
|
$7,000.000
|
$4,825.000
|
$9,030.500
|
|
|
INLET (COMPL)(RWI)(TY II)
|
EA
|
1.000
|
$7,300.000
|
$10,000.000
|
$12,500.000
|
$11,000.000
|
$4,825.000
|
$11,326.500
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$6,500.000
|
$2,000.000
|
$1,850.000
|
$1,000.000
|
$1,390.000
|
$2,311.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$831,015.410
|
$750,000.000
|
$900,000.000
|
$964,000.000
|
$980,000.000
|
$989,515.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$15,000.000
|
$50,000.000
|
$12,500.000
|
$21,000.000
|
$70,000.000
|
$4,343.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
120.000
|
$60.000
|
$1.000
|
$30.000
|
$73.500
|
$90.000
|
$93.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$20.000
|
$1.000
|
$15.000
|
$35.000
|
$20.000
|
$36.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
328.000
|
$40.000
|
$1.000
|
$30.000
|
$12.600
|
$50.000
|
$10.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
328.000
|
$20.000
|
$1.000
|
$20.000
|
$6.000
|
$10.000
|
$10.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$3.000
|
$1.000
|
$4.000
|
$3.150
|
$6.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$1.100
|
$1.000
|
$2.000
|
$0.500
|
$1.000
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.750
|
$1.000
|
$18.000
|
$4.200
|
$8.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$0.500
|
$1.000
|
$9.000
|
$1.500
|
$1.000
|
$1.500
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
1,000.000
|
$12.000
|
$1.000
|
$8.000
|
$3.150
|
$15.000
|
$23.500
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
32,898.000
|
$0.500
|
$0.200
|
$0.500
|
$0.170
|
$0.160
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
16,449.000
|
$0.500
|
$0.200
|
$0.500
|
$0.170
|
$0.160
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,960.000
|
$18.000
|
$40.000
|
$35.000
|
$21.530
|
$20.500
|
$18.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,200.000
|
$3,000.000
|
$1,850.000
|
$2,850.010
|
$1,775.000
|
$1,736.000
|
|
|
SHORT RADIUS
|
LF
|
100.000
|
$300.000
|
$23.000
|
$35.000
|
$23.630
|
$22.500
|
$42.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$4,000.000
|
$1,000.000
|
$1,850.000
|
$1,050.000
|
$1,000.000
|
$1,177.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,060.000
|
$4.000
|
$2.500
|
$3.000
|
$2.630
|
$2.500
|
$1.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$300.000
|
$125.000
|
$500.000
|
$131.250
|
$125.000
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,700.000
|
$2,500.000
|
$3,250.000
|
$2,913.750
|
$2,775.000
|
$2,843.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$3,500.000
|
$250.000
|
$850.000
|
$262.500
|
$250.000
|
$400.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
21.000
|
$30.000
|
$25.000
|
$100.000
|
$26.250
|
$25.000
|
$51.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,935.000
|
$1.000
|
$0.100
|
$6.000
|
$1.500
|
$2.360
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
3,210.000
|
$1.250
|
$0.100
|
$6.000
|
$1.500
|
$2.320
|
$2.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
1.000
|
$800.000
|
$2,500.000
|
$2,500.000
|
$1,312.500
|
$1,500.000
|
$2,760.000
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
53.000
|
$12.000
|
$15.000
|
$20.000
|
$7.880
|
$7.000
|
$16.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,400.000
|
$0.500
|
$0.200
|
$1.250
|
$1.050
|
$0.800
|
$0.250
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
32,898.000
|
$0.700
|
$0.720
|
$1.000
|
$0.790
|
$0.620
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,800.000
|
$0.500
|
$1.000
|
$1.250
|
$1.050
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
24,000.000
|
$0.500
|
$0.720
|
$1.000
|
$0.790
|
$0.630
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
131.000
|
$4.750
|
$5.000
|
$6.000
|
$6.300
|
$4.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,400.000
|
$1.500
|
$0.700
|
$1.250
|
$1.050
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,400.000
|
$1.000
|
$0.050
|
$1.250
|
$1.050
|
$0.500
|
$0.100
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
2,000.000
|
$7.000
|
$3.000
|
$15.000
|
$16.000
|
$2.950
|
$22.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
2.000
|
$500.000
|
$500.000
|
$2,500.000
|
$2,500.000
|
$5,000.000
|
$1,500.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
14.000
|
$150.000
|
$130.000
|
$1,000.000
|
$200.000
|
$120.000
|
$481.000
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
1,010.000
|
$250.000
|
$160.000
|
$140.000
|
$140.000
|
$119.100
|
$135.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
8,781.000
|
$175.000
|
$164.000
|
$160.000
|
$145.000
|
$131.100
|
$140.000
|
|
|
TACK COAT
|
GAL
|
7,983.000
|
$5.000
|
$0.100
|
$6.000
|
$0.250
|
$6.000
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$30,000.000
|
$16,500.000
|
$10,000.000
|
$30,000.000
|
$2,289.000
|
|
|
TMA (STATIONARY)
|
DAY
|
472.000
|
$500.000
|
$1.000
|
$250.000
|
$76.120
|
$150.000
|
$395.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
236.000
|
$400.000
|
$1.000
|
$350.000
|
$156.160
|
$480.000
|
$1,425.500
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
5.000
|
$100.000
|
$1,500.000
|
$1,000.000
|
$750.000
|
$218.000
|
$799.500
|
|
Totals: |
$8,772,969.510
|
$7,856,752.260
|
$8,820,154.500
|
$9,679,622.020
|
$9,987,753.630
|
$10,573,185.500
|