REMOV CONC (RIPRAP)
|
CY
|
6.000
|
$100.000
|
$1,500.000
|
$30.000
|
$35.000
|
$1,600.000
|
$450.000
|
$150.000
|
$100.000
|
|
|
REMOV CONC (CURB)
|
LF
|
924.000
|
$25.000
|
$14.500
|
$15.000
|
$12.000
|
$15.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
REMOV CONC (MISC)
|
SY
|
22.000
|
$30.000
|
$117.130
|
$50.000
|
$50.000
|
$400.000
|
$38.000
|
$150.000
|
$100.000
|
|
|
BLOCK SODDING
|
SY
|
838.000
|
$4.500
|
$11.490
|
$6.250
|
$16.000
|
$15.000
|
$17.100
|
$8.000
|
$10.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
125.000
|
$25.000
|
$0.750
|
$100.000
|
$0.100
|
$10.000
|
$96.000
|
$400.000
|
$30.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
20,223.000
|
$125.000
|
$127.690
|
$158.000
|
$156.000
|
$160.000
|
$131.000
|
$160.000
|
$155.000
|
|
|
TACK COAT
|
GAL
|
13,612.000
|
$3.000
|
$0.220
|
$8.000
|
$4.500
|
$6.000
|
$7.000
|
$1.300
|
$1.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
|
SY
|
300.000
|
$135.000
|
$131.690
|
$125.000
|
$115.000
|
$100.000
|
$120.000
|
$225.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
170,149.000
|
$2.900
|
$2.320
|
$1.700
|
$3.500
|
$3.000
|
$2.450
|
$6.000
|
$3.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
17.000
|
$400.000
|
$765.000
|
$800.000
|
$750.000
|
$800.000
|
$420.000
|
$400.000
|
$350.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
44.000
|
$230.000
|
$82.000
|
$85.000
|
$100.000
|
$86.000
|
$150.000
|
$300.000
|
$350.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
18.000
|
$150.000
|
$100.000
|
$100.000
|
$122.000
|
$110.000
|
$250.000
|
$325.000
|
$500.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
2,103.000
|
$110.000
|
$20.000
|
$100.000
|
$24.000
|
$21.000
|
$50.000
|
$400.000
|
$400.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
561.000
|
$280.000
|
$50.000
|
$50.000
|
$60.000
|
$53.000
|
$100.000
|
$400.000
|
$350.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
245.000
|
$260.000
|
$250.000
|
$250.000
|
$310.000
|
$260.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
14.000
|
$257.000
|
$300.000
|
$300.000
|
$370.000
|
$320.000
|
$250.000
|
$250.000
|
$500.000
|
|
|
RIPRAP (CONC) (CL B) (4 IN)
|
CY
|
6.000
|
$568.000
|
$2,228.040
|
$950.000
|
$1,200.000
|
$1,900.000
|
$650.000
|
$850.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
87.000
|
$650.000
|
$708.580
|
$750.000
|
$1,000.000
|
$1,800.000
|
$1,000.000
|
$700.000
|
$550.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,220.000
|
$36.000
|
$40.000
|
$29.000
|
$35.000
|
$42.000
|
$29.000
|
$30.000
|
$80.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL3)
|
LF
|
508.000
|
$40.000
|
$36.000
|
$19.000
|
$22.000
|
$38.000
|
$19.000
|
$55.000
|
$80.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
446.000
|
$50.000
|
$48.000
|
$29.000
|
$35.000
|
$50.000
|
$29.000
|
$55.000
|
$80.000
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
212.000
|
$100.000
|
$95.000
|
$105.000
|
$125.000
|
$100.000
|
$105.000
|
$155.000
|
$110.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (3/4")
|
SY
|
3,257.000
|
$150.000
|
$171.950
|
$150.000
|
$200.000
|
$200.000
|
$103.000
|
$120.000
|
$130.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
826.000
|
$200.000
|
$246.000
|
$200.000
|
$220.000
|
$240.000
|
$227.000
|
$300.000
|
$225.000
|
|
|
RETROFIT RAIL (TY C221)
|
LF
|
427.000
|
$240.000
|
$277.460
|
$200.000
|
$240.000
|
$270.000
|
$305.000
|
$300.000
|
$250.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$3,500.000
|
$46,000.000
|
$21,000.000
|
$19,500.000
|
$50,000.000
|
$2,700.000
|
$10,000.000
|
$5,000.000
|
|
|
ADJUST STL SHOES
|
EA
|
5.000
|
$4,000.000
|
$8,500.000
|
$8,500.000
|
$10,000.000
|
$9,000.000
|
$50,000.000
|
$15,000.000
|
$8,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$832,972.310
|
$740,000.000
|
$780,672.000
|
$910,000.000
|
$1,092,000.000
|
$880,000.000
|
$890,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$30,000.000
|
$100,460.000
|
$75,000.000
|
$41,000.000
|
$40,000.000
|
$162,800.000
|
$3,500.000
|
$12,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$18,000.000
|
$30,000.000
|
$13,000.000
|
$25,000.000
|
$25,000.000
|
$5,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
276.000
|
$250.000
|
$200.000
|
$1.000
|
$1.000
|
$200.000
|
$346.000
|
$300.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
138.000
|
$250.000
|
$14.500
|
$1.000
|
$1.000
|
$250.000
|
$689.000
|
$300.000
|
$550.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
268.000
|
$20.000
|
$45.000
|
$20.000
|
$47.000
|
$25.000
|
$34.000
|
$42.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
268.000
|
$8.000
|
$15.000
|
$5.000
|
$16.000
|
$5.000
|
$14.000
|
$20.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,100.000
|
$3.500
|
$4.000
|
$3.000
|
$4.150
|
$4.000
|
$3.500
|
$5.000
|
$4.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
2,200.000
|
$8.250
|
$11.000
|
$7.000
|
$12.000
|
$12.000
|
$9.000
|
$15.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,200.000
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.450
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,200.000
|
$4.250
|
$5.000
|
$3.000
|
$5.550
|
$5.000
|
$5.250
|
$8.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,200.000
|
$1.250
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.500
|
$3.000
|
$9.000
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
1,693.000
|
$50.000
|
$34.370
|
$10.000
|
$41.000
|
$40.000
|
$32.000
|
$36.000
|
$100.000
|
|
|
PTB (MOVE)(STEEL)
|
LF
|
1,693.000
|
$20.000
|
$13.100
|
$10.000
|
$18.500
|
$18.000
|
$11.000
|
$15.000
|
$20.000
|
|
|
PTB (REMOVE)(STEEL)
|
LF
|
1,693.000
|
$20.000
|
$11.660
|
$10.000
|
$20.500
|
$20.000
|
$11.000
|
$15.000
|
$20.000
|
|
|
CONC CURB (TY II)
|
LF
|
924.000
|
$32.000
|
$68.000
|
$48.000
|
$53.000
|
$75.000
|
$68.000
|
$75.000
|
$55.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
22.000
|
$140.000
|
$196.960
|
$150.000
|
$135.000
|
$400.000
|
$93.000
|
$150.000
|
$85.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,875.500
|
$25.000
|
$18.450
|
$22.000
|
$27.000
|
$22.000
|
$21.100
|
$28.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,000.000
|
$1,773.000
|
$1,800.000
|
$2,700.000
|
$3,000.000
|
$2,587.110
|
$2,200.000
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$15,000.000
|
$1,098.000
|
$1,200.000
|
$1,400.000
|
$1,900.000
|
$1,850.000
|
$1,700.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,630.000
|
$3.500
|
$1.500
|
$2.500
|
$2.750
|
$2.000
|
$2.000
|
$5.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$350.000
|
$200.000
|
$125.000
|
$145.000
|
$210.000
|
$200.000
|
$350.000
|
$500.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$300.000
|
$350.000
|
$250.000
|
$275.000
|
$210.000
|
$200.000
|
$350.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,200.000
|
$2,800.000
|
$2,800.000
|
$3,400.000
|
$3,200.000
|
$3,069.000
|
$4,000.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$600.000
|
$350.000
|
$250.000
|
$275.000
|
$210.000
|
$200.000
|
$350.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,950.000
|
$1,204.610
|
$10,000.000
|
$2,500.000
|
$4,000.000
|
$1,125.000
|
$1,000.000
|
$6,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$15,000.000
|
$1,204.610
|
$1,000.000
|
$2,575.000
|
$2,000.000
|
$825.000
|
$2,500.000
|
$2,500.000
|
|
|
CCA (INSTL)(N)(TL3)(WORK ZONE)
|
EA
|
2.000
|
$25,000.000
|
$7,254.610
|
$5,000.000
|
$10,300.000
|
$10,000.000
|
$7,670.000
|
$15,000.000
|
$30,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
23.000
|
$35.000
|
$46.000
|
$25.000
|
$27.000
|
$26.000
|
$25.000
|
$35.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
9,160.000
|
$0.750
|
$0.250
|
$0.350
|
$0.370
|
$0.850
|
$0.350
|
$0.600
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
36,602.000
|
$0.500
|
$0.240
|
$0.320
|
$0.340
|
$0.850
|
$0.320
|
$0.600
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
36,602.000
|
$0.500
|
$0.250
|
$0.350
|
$0.370
|
$0.850
|
$0.350
|
$0.600
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
36,602.000
|
$0.500
|
$0.240
|
$0.320
|
$0.340
|
$0.850
|
$0.320
|
$0.600
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,496.000
|
$1.000
|
$0.500
|
$1.000
|
$1.150
|
$3.000
|
$1.340
|
$0.010
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
8,584.000
|
$1.250
|
$1.100
|
$0.870
|
$0.900
|
$1.250
|
$0.870
|
$1.200
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
3,098.000
|
$4.500
|
$5.950
|
$3.500
|
$3.700
|
$4.250
|
$3.500
|
$4.250
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,027.000
|
$6.000
|
$8.500
|
$6.750
|
$7.000
|
$7.500
|
$6.750
|
$10.000
|
$20.000
|
|
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
|
EA
|
110.000
|
$60.000
|
$225.000
|
$220.000
|
$230.000
|
$190.000
|
$220.000
|
$320.000
|
$500.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
74.000
|
$60.000
|
$205.000
|
$170.000
|
$180.000
|
$180.000
|
$170.000
|
$250.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
2.000
|
$450.000
|
$1,500.000
|
$900.000
|
$955.000
|
$1,800.000
|
$900.000
|
$1,200.000
|
$1,500.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
2.000
|
$450.000
|
$1,200.000
|
$1,100.000
|
$1,150.000
|
$1,800.000
|
$1,100.000
|
$1,500.000
|
$1,500.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
286.000
|
$1.250
|
$1.050
|
$0.950
|
$1.000
|
$1.250
|
$0.950
|
$1.300
|
$2.000
|
|
|
PAVEMENT SLER 12"
|
LF
|
1,272.000
|
$0.500
|
$2.000
|
$0.500
|
$0.520
|
$0.850
|
$0.500
|
$1.000
|
$1.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
585.000
|
$1.000
|
$3.000
|
$1.000
|
$1.050
|
$1.500
|
$1.000
|
$2.000
|
$20.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
18.000
|
$38.000
|
$60.000
|
$25.000
|
$26.000
|
$29.000
|
$25.000
|
$35.000
|
$250.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
10.000
|
$28.000
|
$60.000
|
$25.000
|
$26.000
|
$36.000
|
$25.000
|
$35.000
|
$250.000
|
|
|
PAVEMENT SLER (ENTR GORE)
|
EA
|
2.000
|
$500.000
|
$300.000
|
$50.000
|
$53.000
|
$230.000
|
$50.000
|
$65.000
|
$1,000.000
|
|
|
PAVEMENT SLER (EXIT GORE)
|
EA
|
2.000
|
$500.000
|
$300.000
|
$75.000
|
$79.000
|
$240.000
|
$75.000
|
$100.000
|
$1,000.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
12,760.000
|
$0.750
|
$0.700
|
$0.600
|
$0.700
|
$0.800
|
$0.600
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
46,378.000
|
$0.750
|
$0.690
|
$0.580
|
$0.600
|
$0.750
|
$0.580
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
46,378.000
|
$0.750
|
$0.690
|
$0.580
|
$0.600
|
$0.750
|
$0.580
|
$1.000
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,160.000
|
$5.000
|
$4.650
|
$3.880
|
$4.000
|
$4.500
|
$3.880
|
$5.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
1,272.000
|
$1.250
|
$2.250
|
$2.000
|
$2.150
|
$1.750
|
$2.000
|
$3.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
585.000
|
$3.000
|
$3.750
|
$3.500
|
$3.750
|
$3.000
|
$3.500
|
$4.250
|
$20.000
|
|
|
ELIM EXT PM & MRKS (ENTR GORE)
|
EA
|
2.000
|
$450.000
|
$400.000
|
$250.000
|
$265.000
|
$1,500.000
|
$250.000
|
$325.000
|
$500.000
|
|
|
ELIM EXT PM & MRKS (EXIT GORE)
|
EA
|
2.000
|
$450.000
|
$525.000
|
$300.000
|
$318.000
|
$1,500.000
|
$300.000
|
$350.000
|
$500.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,272.000
|
$0.500
|
$1.050
|
$0.350
|
$0.370
|
$0.300
|
$0.350
|
$0.550
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
585.000
|
$1.150
|
$2.000
|
$0.750
|
$0.800
|
$0.550
|
$0.750
|
$1.100
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
2.000
|
$150.000
|
$300.000
|
$500.000
|
$525.000
|
$180.000
|
$500.000
|
$700.000
|
$500.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
2.000
|
$300.000
|
$300.000
|
$500.000
|
$525.000
|
$180.000
|
$500.000
|
$700.000
|
$500.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
5,000.000
|
$6.000
|
$5.950
|
$5.950
|
$7.400
|
$6.500
|
$6.000
|
$8.000
|
$30.000
|
|
|
DRIFTWOOD REMOVAL
|
LS
|
1.000
|
$3,500.000
|
$10,000.000
|
$15,000.000
|
$12,000.000
|
$10,500.000
|
$25,000.000
|
$5,000.000
|
$50,000.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
0.100
|
$5,000.000
|
$7,500.000
|
$150,000.000
|
$9,000.000
|
$7,875.000
|
$10,000.000
|
$5,000.000
|
$200,000.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
40.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$1,000.000
|
$716.000
|
$250.000
|
$500.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
24.000
|
$55.000
|
$140.000
|
$40.000
|
$1,700.000
|
$150.000
|
$100.000
|
$35.000
|
$100.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
78.000
|
$35.000
|
$150.000
|
$35.000
|
$180.000
|
$160.000
|
$110.000
|
$125.000
|
$100.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
62.000
|
$145.000
|
$1,150.000
|
$550.000
|
$1,400.000
|
$1,200.000
|
$612.000
|
$800.000
|
$850.000
|
|
|
FULL - DEPTH REPAIR CRCP (9")
|
SY
|
900.000
|
$250.000
|
$310.500
|
$320.000
|
$380.000
|
$350.000
|
$330.000
|
$325.000
|
$365.000
|
|
|
FULL-DEPTH REPAIR CPCD (10")
|
SY
|
280.000
|
$300.000
|
$315.500
|
$330.000
|
$390.000
|
$375.000
|
$335.000
|
$325.000
|
$450.000
|
|
Totals: |
$7,112,439.850
|
$7,572,475.595
|
$7,611,093.540
|
$7,812,671.380
|
$8,221,829.150
|
$8,890,859.500
|
$8,897,473.610
|