REMOVING CONCRETE(MOW STRIP)
|
LF
|
19,375.000
|
$3.000
|
$7.150
|
$8.000
|
$7.000
|
$4.250
|
|
|
BACKFILL (TY A OR B)
|
STA
|
1,795.890
|
$150.000
|
$140.000
|
$275.000
|
$225.000
|
$345.000
|
|
|
BLADING
|
STA
|
1,795.890
|
$90.000
|
$0.100
|
$68.000
|
$75.000
|
$25.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
199,555.000
|
$1.000
|
$0.010
|
$1.050
|
$2.000
|
$0.820
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
131,222.000
|
$0.120
|
$0.110
|
$0.120
|
$0.120
|
$0.240
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
68,333.000
|
$0.120
|
$0.110
|
$0.120
|
$0.120
|
$0.210
|
|
|
VEGETATIVE WATERING
|
MG
|
17,126.000
|
$12.000
|
$0.100
|
$0.010
|
$24.000
|
$8.500
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
104,826.400
|
$100.000
|
$89.000
|
$118.000
|
$102.000
|
$130.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,000.000
|
$30.000
|
$119.000
|
$95.000
|
$42.000
|
$104.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
237,981.000
|
$3.000
|
$1.540
|
$2.000
|
$2.000
|
$1.250
|
|
|
PLAN & TEXT ASPH CONC PAV(4" TO 6")
|
SY
|
192,034.000
|
$7.000
|
$1.030
|
$1.220
|
$3.000
|
$2.000
|
|
|
PLAN & TEXT CONC PAV(0" TO 2")
|
SY
|
51,843.000
|
$2.500
|
$5.150
|
$4.000
|
$2.850
|
$2.250
|
|
|
FULL - DEPTH REPAIR CPCD (12")
|
SY
|
12,800.000
|
$160.000
|
$154.840
|
$174.000
|
$314.500
|
$154.000
|
|
|
FULL - DEPTH REPAIR CPCD (13")
|
SY
|
7,600.000
|
$180.000
|
$166.490
|
$187.000
|
$339.500
|
$167.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,145.000
|
$430.000
|
$525.000
|
$520.000
|
$412.000
|
$450.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,500,000.000
|
$2,435,000.000
|
$3,072,785.000
|
$3,500,000.000
|
$3,490,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$15,000.000
|
$23,000.000
|
$23,000.000
|
$5,000.000
|
$96,750.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$20.000
|
$27.430
|
$29.000
|
$28.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$7.000
|
$8.970
|
$9.250
|
$9.000
|
$6.250
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
30,460.000
|
$2.500
|
$1.620
|
$1.750
|
$1.750
|
$2.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
30,460.000
|
$0.500
|
$0.320
|
$0.350
|
$0.400
|
$0.440
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,751.000
|
$4.000
|
$3.170
|
$3.250
|
$4.000
|
$3.450
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,751.000
|
$1.000
|
$0.480
|
$0.550
|
$0.500
|
$0.440
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
285,340.000
|
$0.120
|
$0.130
|
$0.130
|
$0.140
|
$0.240
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
20,612.500
|
$20.000
|
$17.100
|
$18.000
|
$19.000
|
$19.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
62.000
|
$1,725.000
|
$1,325.000
|
$1,394.737
|
$1,400.000
|
$1,470.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
38.000
|
$1,250.000
|
$925.000
|
$973.684
|
$995.000
|
$1,040.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
18,750.000
|
$2.750
|
$1.450
|
$1.526
|
$1.750
|
$1.800
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
64.000
|
$260.000
|
$100.000
|
$105.263
|
$150.000
|
$158.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$260.000
|
$100.000
|
$105.263
|
$170.000
|
$176.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
88.000
|
$2,500.000
|
$2,475.000
|
$2,605.263
|
$2,400.000
|
$2,520.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
84.000
|
$240.000
|
$225.000
|
$236.842
|
$200.000
|
$210.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$600.000
|
$425.000
|
$894.737
|
$490.000
|
$615.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,000.000
|
$1,700.000
|
$2,342.105
|
$2,100.000
|
$2,050.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
6.000
|
$2,000.000
|
$1,700.000
|
$2,526.316
|
$2,000.000
|
$2,260.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$80.000
|
$75.000
|
$105.263
|
$75.000
|
$105.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
8.000
|
$500.000
|
$400.000
|
$684.211
|
$500.000
|
$525.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
227.000
|
$70.000
|
$55.000
|
$63.158
|
$55.000
|
$48.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
70.000
|
$25.000
|
$20.000
|
$24.211
|
$20.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
79.000
|
$70.000
|
$55.000
|
$63.158
|
$55.000
|
$51.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
70.000
|
$19.000
|
$20.000
|
$24.211
|
$20.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
251.000
|
$70.000
|
$55.000
|
$63.158
|
$58.000
|
$47.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
212.000
|
$27.000
|
$25.000
|
$27.368
|
$22.000
|
$23.100
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
185.000
|
$23.000
|
$25.000
|
$27.368
|
$22.000
|
$23.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
1,704.000
|
$0.480
|
$0.550
|
$0.310
|
$0.350
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
65,047.000
|
$0.290
|
$0.310
|
$0.310
|
$0.350
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
65,047.000
|
$0.310
|
$0.310
|
$0.310
|
$0.350
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,257.000
|
$0.730
|
$0.840
|
$1.000
|
$1.150
|
$1.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
20,462.000
|
$1.100
|
$1.000
|
$0.870
|
$1.000
|
$0.950
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,512.000
|
$3.000
|
$3.000
|
$3.400
|
$3.250
|
$3.450
|
|
|
PAVEMENT SEALER 4"
|
LF
|
21,000.000
|
$0.150
|
$0.180
|
$0.210
|
$0.210
|
$0.220
|
|
|
PAVEMENT SEALER 6"
|
LF
|
5,280.000
|
$0.200
|
$0.250
|
$0.310
|
$0.350
|
$0.330
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
164,660.000
|
$0.320
|
$0.380
|
$0.470
|
$0.460
|
$0.490
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
58,030.000
|
$0.480
|
$0.550
|
$0.580
|
$0.600
|
$0.590
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
162,480.000
|
$0.320
|
$0.380
|
$0.480
|
$0.460
|
$0.490
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
2,292.000
|
$2.860
|
$2.750
|
$3.400
|
$3.250
|
$3.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
6,519.000
|
$3.000
|
$3.250
|
$3.750
|
$3.550
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
26,280.000
|
$0.400
|
$0.450
|
$0.510
|
$0.500
|
$0.520
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
21,000.000
|
$0.100
|
$0.050
|
$0.085
|
$0.100
|
$0.090
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,280.000
|
$0.100
|
$0.050
|
$0.210
|
$0.250
|
$0.220
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$2,500.000
|
$1,900.000
|
$1,200.000
|
$1,200.000
|
$16,700.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
50.000
|
$2,300.000
|
$855.000
|
$4,000.000
|
$1,195.000
|
$9,600.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
10.000
|
$2,000.000
|
$1,800.000
|
$3,000.000
|
$1,775.000
|
$9,600.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
4,000.000
|
$310.000
|
$300.000
|
$310.000
|
$310.000
|
$300.000
|
|
|
CAM (ASPHALT) PG(76-22)
|
TON
|
3,868.800
|
$110.000
|
$97.750
|
$138.000
|
$140.500
|
$151.000
|
|
|
CAM (AGGREGATE)
|
TON
|
48,360.060
|
$110.000
|
$97.750
|
$138.000
|
$140.500
|
$151.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
166,302.780
|
$2.500
|
$2.600
|
$3.000
|
$6.000
|
$3.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$11,000.000
|
$17,750.000
|
$13,000.000
|
$13,250.000
|
$6,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
6.000
|
$14,000.000
|
$31,000.000
|
$22,000.000
|
$10,000.000
|
$0.010
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
144.000
|
$65.000
|
$110.000
|
$28.000
|
$50.000
|
$75.000
|
|
Totals: |
$29,314,198.800
|
$25,641,956.212
|
$32,750,171.002
|
$35,209,658.260
|
$36,129,708.700
|