PREPARING ROW
|
STA
|
51.000
|
$4,900.000
|
$11,479.000
|
$12,000.000
|
$8,500.000
|
$7,500.000
|
$6,300.000
|
$3,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,681.000
|
$9.000
|
$8.500
|
$4.500
|
$20.000
|
$10.000
|
$15.000
|
$13.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
6,609.000
|
$4.000
|
$4.000
|
$3.500
|
$12.500
|
$6.000
|
$10.000
|
$12.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
10.000
|
$41.000
|
$30.000
|
$65.000
|
$30.000
|
$40.000
|
$250.000
|
$255.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
993.000
|
$9.000
|
$9.500
|
$7.000
|
$30.000
|
$22.000
|
$15.000
|
$18.000
|
|
|
REMOVING CONC (MISC)
|
CY
|
164.000
|
$49.000
|
$50.000
|
$45.000
|
$20.000
|
$100.000
|
$111.000
|
$71.000
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
14,300.000
|
$8.000
|
$14.500
|
$10.000
|
$20.000
|
$16.000
|
$28.500
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,416.000
|
$8.000
|
$20.000
|
$26.000
|
$20.000
|
$24.000
|
$31.500
|
$65.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
15,814.000
|
$3.000
|
$27.000
|
$18.000
|
$25.000
|
$42.000
|
$25.200
|
$65.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
2,147.000
|
$1.000
|
$2.250
|
$2.400
|
$5.500
|
$4.000
|
$8.400
|
$7.000
|
|
|
BLOCK SODDING
|
SY
|
2,147.000
|
$3.000
|
$4.000
|
$5.000
|
$5.500
|
$5.000
|
$12.600
|
$4.300
|
|
|
VEGETATIVE WATERING
|
MG
|
53.000
|
$8.000
|
$109.000
|
$25.000
|
$100.000
|
$3.000
|
$210.000
|
$106.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
9,191.000
|
$75.000
|
$85.000
|
$95.000
|
$87.500
|
$78.000
|
$99.000
|
$95.000
|
|
|
CEM STABIL BKFL
|
CY
|
53.000
|
$71.000
|
$140.000
|
$110.000
|
$250.000
|
$300.000
|
$168.000
|
$375.000
|
|
|
CUT & RESTORING PAV
|
SY
|
22.000
|
$95.000
|
$115.000
|
$40.000
|
$125.000
|
$150.000
|
$630.000
|
$350.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
117.000
|
$140.000
|
$185.000
|
$175.000
|
$350.000
|
$300.000
|
$210.000
|
$205.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
40.000
|
$2.000
|
$12.000
|
$1.000
|
$3.500
|
$5.000
|
$52.500
|
$100.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,798.000
|
$60.000
|
$29.000
|
$21.000
|
$25.000
|
$22.000
|
$21.000
|
$23.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,423.000
|
$100.000
|
$150.000
|
$130.000
|
$125.000
|
$200.000
|
$144.000
|
$115.000
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
2,237.000
|
$34.000
|
$22.000
|
$40.000
|
$40.000
|
$55.000
|
$31.500
|
$32.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
8,966.000
|
$15.000
|
$42.000
|
$55.000
|
$50.000
|
$65.000
|
$73.500
|
$102.000
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
2,487.000
|
$55.000
|
$37.000
|
$30.000
|
$60.000
|
$75.000
|
$144.000
|
$102.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,463.000
|
$380.000
|
$330.000
|
$435.000
|
$350.000
|
$400.000
|
$420.000
|
$357.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
247.000
|
$455.000
|
$440.000
|
$420.000
|
$400.000
|
$420.000
|
$525.000
|
$394.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
250.000
|
$445.000
|
$440.000
|
$450.000
|
$350.000
|
$430.000
|
$525.000
|
$412.000
|
|
|
RETROFIT RAIL (TY C221)
|
LF
|
190.000
|
$160.000
|
$160.000
|
$205.000
|
$185.000
|
$75.000
|
$315.000
|
$362.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
39.000
|
$75.000
|
$115.000
|
$80.000
|
$65.000
|
$100.000
|
$210.000
|
$265.000
|
|
|
INLET (COMPL)(RWI)(TY II)
|
EA
|
1.000
|
$5,000.000
|
$4,800.000
|
$4,300.000
|
$5,000.000
|
$6,500.000
|
$8,400.000
|
$9,500.000
|
|
|
ADJUSTING INLETS
|
EA
|
14.000
|
$1,200.000
|
$1,500.000
|
$1,000.000
|
$1,500.000
|
$2,000.000
|
$2,100.000
|
$2,800.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$912.000
|
$750.000
|
$450.000
|
$500.000
|
$1,500.000
|
$945.000
|
$1,900.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
508.000
|
$39.000
|
$6.000
|
$15.000
|
$20.000
|
$26.000
|
$42.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$343,967.770
|
$635,000.000
|
$640,000.000
|
$600,000.000
|
$730,000.000
|
$792,000.000
|
$760,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$8,000.000
|
$45,001.000
|
$57,000.000
|
$8,500.000
|
$15,000.000
|
$52,500.000
|
$22,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,310.000
|
$2.500
|
$2.000
|
$1.750
|
$4.000
|
$2.000
|
$1.420
|
$2.880
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,310.000
|
$1.000
|
$0.500
|
$0.450
|
$2.000
|
$1.000
|
$0.110
|
$0.400
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
480.000
|
$4.500
|
$3.700
|
$3.650
|
$12.000
|
$4.000
|
$2.630
|
$4.300
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
180.000
|
$5.500
|
$5.300
|
$5.750
|
$16.000
|
$6.000
|
$3.680
|
$5.300
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
660.000
|
$1.000
|
$1.000
|
$2.250
|
$8.000
|
$2.000
|
$1.050
|
$1.500
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
6,240.000
|
$18.500
|
$25.000
|
$33.000
|
$50.000
|
$35.000
|
$11.550
|
$7.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
5,730.000
|
$8.000
|
$7.500
|
$7.000
|
$20.000
|
$6.000
|
$9.450
|
$11.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
6,240.000
|
$6.000
|
$7.500
|
$7.250
|
$20.000
|
$8.000
|
$8.400
|
$6.000
|
|
|
CONC CURB (TY II)
|
LF
|
210.000
|
$20.000
|
$22.000
|
$12.000
|
$25.000
|
$25.000
|
$15.750
|
$16.550
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,207.000
|
$20.000
|
$19.000
|
$18.500
|
$18.500
|
$25.000
|
$19.430
|
$18.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
14.000
|
$1,500.000
|
$1,300.000
|
$1,825.000
|
$850.000
|
$1,800.000
|
$2,177.650
|
$1,825.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$1,100.000
|
$900.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
$1,050.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,207.000
|
$3.000
|
$3.200
|
$2.850
|
$3.000
|
$5.000
|
$2.990
|
$2.850
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$300.000
|
$220.000
|
$150.000
|
$500.000
|
$500.000
|
$157.500
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$270.000
|
$240.000
|
$325.000
|
$500.000
|
$500.000
|
$341.250
|
$325.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
7.000
|
$2,300.000
|
$2,200.000
|
$2,205.000
|
$2,500.000
|
$2,500.000
|
$236.250
|
$2,205.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
4.000
|
$9,000.000
|
$8,500.000
|
$8,000.000
|
$12,500.000
|
$10,000.000
|
$11,550.000
|
$8,375.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,500.000
|
$1,100.000
|
$2,500.000
|
$5,000.000
|
$1,200.000
|
$3,150.000
|
$1,375.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$900.000
|
$600.000
|
$1,000.000
|
$2,500.000
|
$1,500.000
|
$2,100.000
|
$775.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
35.000
|
$300.000
|
$400.000
|
$650.000
|
$650.000
|
$400.000
|
$341.250
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
28.000
|
$50.000
|
$40.000
|
$32.000
|
$100.000
|
$55.000
|
$47.250
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
3.000
|
$54.000
|
$45.000
|
$40.000
|
$100.000
|
$55.000
|
$50.930
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
61.000
|
$18.000
|
$34.000
|
$33.000
|
$100.000
|
$24.000
|
$34.650
|
$33.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
15,860.000
|
$1.000
|
$1.050
|
$1.000
|
$0.500
|
$2.000
|
$1.050
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
16,567.000
|
$0.700
|
$0.840
|
$0.800
|
$0.500
|
$1.000
|
$0.840
|
$0.770
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
12,102.000
|
$0.700
|
$0.840
|
$0.800
|
$0.500
|
$1.000
|
$0.840
|
$0.770
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,087.000
|
$1.000
|
$0.920
|
$0.860
|
$0.500
|
$1.000
|
$0.900
|
$0.740
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
134.000
|
$3.500
|
$3.650
|
$3.500
|
$8.000
|
$5.000
|
$3.680
|
$2.930
|
|
|
PAVEMENT SEALER 4"
|
LF
|
36,871.000
|
$0.200
|
$0.150
|
$0.140
|
$0.500
|
$1.000
|
$0.150
|
$0.160
|
|
|
PAVEMENT SEALER 6"
|
LF
|
19,436.000
|
$0.300
|
$0.210
|
$0.200
|
$0.500
|
$1.000
|
$0.210
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
4,087.000
|
$1.000
|
$0.320
|
$0.300
|
$0.500
|
$1.000
|
$0.320
|
$0.300
|
|
|
PAVEMENT SEALER 12"
|
LF
|
134.000
|
$2.500
|
$2.100
|
$2.000
|
$0.500
|
$3.000
|
$2.100
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
17,016.000
|
$0.400
|
$0.470
|
$0.440
|
$0.500
|
$1.000
|
$0.460
|
$0.420
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
19,436.000
|
$0.600
|
$0.650
|
$0.620
|
$0.500
|
$1.000
|
$0.650
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
19,855.000
|
$0.400
|
$0.500
|
$0.480
|
$0.500
|
$1.000
|
$0.500
|
$0.420
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,137.000
|
$4.000
|
$3.950
|
$3.800
|
$15.000
|
$5.000
|
$3.990
|
$3.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
44,529.000
|
$0.400
|
$0.460
|
$0.440
|
$0.500
|
$1.000
|
$0.460
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
36,871.000
|
$0.100
|
$0.050
|
$0.040
|
$0.500
|
$1.000
|
$0.040
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
19,436.000
|
$0.100
|
$0.090
|
$0.080
|
$0.500
|
$1.000
|
$0.080
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,087.000
|
$0.100
|
$0.110
|
$0.100
|
$0.500
|
$1.000
|
$0.110
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
134.000
|
$0.500
|
$1.050
|
$1.000
|
$8.000
|
$2.000
|
$1.050
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
1,137.000
|
$0.300
|
$0.260
|
$0.250
|
$15.000
|
$1.000
|
$0.260
|
$0.750
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
41.000
|
$200.000
|
$210.000
|
$200.000
|
$500.000
|
$400.000
|
$262.500
|
$200.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
54.000
|
$600.000
|
$330.000
|
$250.000
|
$650.000
|
$440.000
|
$514.500
|
$250.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
55.000
|
$900.000
|
$370.000
|
$350.000
|
$850.000
|
$500.000
|
$887.250
|
$250.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
15.000
|
$1,400.000
|
$525.000
|
$1,000.000
|
$1,000.000
|
$550.000
|
$1,182.300
|
$250.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
2.000
|
$5,000.000
|
$540.000
|
$1,350.000
|
$5,000.000
|
$600.000
|
$2,608.200
|
$500.000
|
|
|
INTRLCK ART CONC BLKS (4" MIN)
|
SF
|
70,132.000
|
$5.000
|
$10.000
|
$8.000
|
$10.500
|
$14.000
|
$9.450
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,000.000
|
$14,000.000
|
$1,000.000
|
$16,500.000
|
$15,000.000
|
$21,000.000
|
$20,000.000
|
|
|
COVER (ADJUST)
|
EA
|
27.000
|
$1,000.000
|
$250.000
|
$250.000
|
$750.000
|
$1,250.000
|
$1,260.000
|
$1,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$5,000.000
|
$37,500.000
|
$500.000
|
$8,500.000
|
$10,000.000
|
$18,000.000
|
$45,000.000
|
|
Totals: |
$4,323,787.170
|
$6,356,006.290
|
$6,451,599.300
|
$6,676,669.500
|
$7,353,815.000
|
$7,549,367.850
|
$7,637,988.280
|