REMOV CONC (RIPRAP)
|
SY
|
520.000
|
$20.000
|
$35.200
|
$26.990
|
$100.000
|
$22.000
|
|
|
REMOV CONC (CURB)
|
LF
|
101.000
|
$30.000
|
$13.200
|
$49.510
|
$100.000
|
$16.000
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
630.000
|
$20.000
|
$30.000
|
$250.000
|
$150.000
|
$23.000
|
|
|
EMBANK (FNL)(DC)(TY C2)
|
CY
|
384.000
|
$50.000
|
$82.500
|
$58.410
|
$100.000
|
$100.000
|
|
|
BLOCK SODDING
|
SY
|
1,520.000
|
$4.500
|
$6.600
|
$5.000
|
$10.000
|
$14.900
|
|
|
VEGETATIVE WATERING
|
TGL
|
227.000
|
$25.000
|
$72.600
|
$60.750
|
$50.000
|
$60.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
33,678.000
|
$145.000
|
$181.100
|
$151.340
|
$185.000
|
$157.480
|
|
|
TACK COAT
|
GAL
|
33,678.000
|
$6.000
|
$4.600
|
$0.250
|
$6.000
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
950.000
|
$125.000
|
$172.500
|
$145.000
|
$85.000
|
$150.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
306,153.000
|
$2.500
|
$1.840
|
$1.900
|
$4.000
|
$1.670
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
CY
|
968.000
|
$1,000.000
|
$1,432.200
|
$1,302.000
|
$1,000.000
|
$1,302.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
107.000
|
$412.000
|
$590.000
|
$844.440
|
$350.000
|
$357.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
8.000
|
$3,000.000
|
$5,500.000
|
$5,500.000
|
$6,500.000
|
$2,900.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
1,123.000
|
$150.000
|
$91.000
|
$126.000
|
$175.000
|
$100.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
1,265.000
|
$300.000
|
$250.000
|
$250.000
|
$265.000
|
$150.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
3,791.000
|
$240.000
|
$245.000
|
$245.000
|
$265.000
|
$150.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
560.000
|
$568.000
|
$687.500
|
$897.820
|
$550.000
|
$776.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
976.000
|
$650.000
|
$687.500
|
$765.630
|
$550.000
|
$764.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
233.000
|
$162.000
|
$200.200
|
$253.310
|
$185.000
|
$215.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL3)
|
LF
|
32.000
|
$50.000
|
$100.000
|
$100.000
|
$110.000
|
$58.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
1,460.000
|
$25.000
|
$40.000
|
$40.000
|
$80.000
|
$32.000
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
219.000
|
$28.000
|
$20.000
|
$5.000
|
$100.000
|
$53.200
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
2,052.000
|
$200.000
|
$159.500
|
$498.000
|
$200.000
|
$238.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$368,500.000
|
$250,000.000
|
$250,000.000
|
$400,000.000
|
$373,000.000
|
|
|
ADJUST STL SHOES
|
EA
|
53.000
|
$3,500.000
|
$5,200.000
|
$5,200.000
|
$5,500.000
|
$15,820.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,000,000.000
|
$2,150,000.000
|
$2,582,851.380
|
$2,400,000.000
|
$3,150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$30,000.000
|
$110,000.000
|
$160,715.870
|
$15,000.000
|
$124,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$24,200.000
|
$22,000.000
|
$25,000.000
|
$16,500.000
|
$50,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
344.000
|
$250.000
|
$300.000
|
$500.000
|
$250.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
45.000
|
$250.000
|
$400.000
|
$900.000
|
$550.000
|
$802.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
268.000
|
$20.000
|
$22.000
|
$34.000
|
$40.000
|
$34.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
268.000
|
$8.000
|
$11.000
|
$14.000
|
$20.000
|
$14.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$3.500
|
$2.610
|
$3.250
|
$4.000
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$1.000
|
$1.320
|
$1.050
|
$2.000
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.250
|
$6.600
|
$4.750
|
$18.000
|
$4.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$1.250
|
$2.200
|
$1.050
|
$9.000
|
$1.050
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
1,516.000
|
$75.000
|
$38.000
|
$95.000
|
$85.000
|
$89.000
|
|
|
PTB (REMOVE)(STEEL)
|
LF
|
1,516.000
|
$20.000
|
$10.000
|
$25.000
|
$30.000
|
$3.700
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
45,480.000
|
$15.000
|
$8.000
|
$5.130
|
$20.000
|
$5.800
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
630.000
|
$235.000
|
$159.500
|
$492.000
|
$250.000
|
$164.000
|
|
|
CONC CURB (TY II)
|
LF
|
101.000
|
$30.000
|
$46.200
|
$45.000
|
$65.000
|
$22.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
30,000.000
|
$0.400
|
$0.140
|
$0.220
|
$0.500
|
$0.290
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
20,136.000
|
$25.000
|
$23.820
|
$23.000
|
$30.000
|
$23.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
28.000
|
$3,000.000
|
$2,139.500
|
$2,675.590
|
$1,850.000
|
$2,883.510
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
18.000
|
$1,400.000
|
$1,648.900
|
$1,125.000
|
$1,850.000
|
$1,125.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$2,250.000
|
$984.500
|
$600.000
|
$5,000.000
|
$600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
19,868.000
|
$3.500
|
$2.200
|
$2.250
|
$3.000
|
$2.250
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
15.000
|
$350.000
|
$220.000
|
$125.000
|
$500.000
|
$125.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
28.000
|
$245.000
|
$220.000
|
$225.000
|
$500.000
|
$225.000
|
|
|
RM MTL BM GD FENCE TRANS (TL-2)
|
EA
|
1.000
|
$300.000
|
$220.000
|
$225.000
|
$500.000
|
$225.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$3,200.000
|
$3,382.500
|
$2,877.500
|
$3,250.000
|
$2,877.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
18.000
|
$600.000
|
$220.000
|
$250.000
|
$1,500.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
30.000
|
$1,950.000
|
$1,182.500
|
$2,500.000
|
$6,500.000
|
$1,235.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$15,000.000
|
$874.500
|
$2,500.000
|
$3,000.000
|
$825.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$25,000.000
|
$8,332.500
|
$15,000.000
|
$30,000.000
|
$6,995.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$2,800.000
|
$4,000.000
|
$4,001.420
|
$10,000.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
205.000
|
$35.000
|
$38.500
|
$25.000
|
$100.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
31,386.000
|
$0.750
|
$0.610
|
$0.320
|
$1.500
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
31,386.000
|
$0.750
|
$0.610
|
$0.300
|
$1.500
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
31,386.000
|
$0.750
|
$0.610
|
$0.300
|
$1.500
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
31,378.000
|
$1.000
|
$3.000
|
$0.500
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
7.000
|
$500.000
|
$2,750.000
|
$900.000
|
$1,500.000
|
$900.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
7.000
|
$500.000
|
$2,750.000
|
$1,300.000
|
$1,500.000
|
$1,300.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
31,386.000
|
$0.750
|
$0.940
|
$0.620
|
$1.500
|
$0.620
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
31,386.000
|
$0.750
|
$0.940
|
$0.590
|
$1.500
|
$0.590
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
31,386.000
|
$0.750
|
$0.940
|
$0.590
|
$1.500
|
$0.590
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,140.000
|
$5.000
|
$8.640
|
$3.900
|
$6.000
|
$3.900
|
|
|
JT CLEANING AND SEALING (EXPANSION JTS)
|
LF
|
600.000
|
$30.000
|
$50.000
|
$80.000
|
$50.000
|
$26.000
|
|
|
LONGT CRACK CLEANING AND SEALING (CRCP)
|
LF
|
100.000
|
$30.000
|
$25.000
|
$19.000
|
$50.000
|
$19.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
1,000.000
|
$15.000
|
$13.000
|
$12.000
|
$30.000
|
$11.750
|
|
|
SPOT TREE TRIMMING / BRUSH REMOVAL
|
LF
|
30.000
|
$15.000
|
$110.000
|
$76.680
|
$500.000
|
$1,000.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
2.000
|
$500.000
|
$880.000
|
$1,150.270
|
$2,500.000
|
$1,000.000
|
|
|
DITCH CLEAN / RESHAPING(CU YD IN PLACE)
|
CY
|
245.000
|
$65.000
|
$66.000
|
$70.670
|
$100.000
|
$40.000
|
|
|
REPLACE RAIL ELEMENT (W-BEAM)
|
LF
|
30.000
|
$15.000
|
$22.000
|
$17.000
|
$500.000
|
$17.000
|
|
|
REPLACE TIMBER POST W/O CONC FND
|
EA
|
10.000
|
$100.000
|
$115.500
|
$25.000
|
$2,500.000
|
$25.000
|
|
|
REALIGN POSTS
|
EA
|
153.000
|
$25.000
|
$71.500
|
$10.000
|
$500.000
|
$10.000
|
|
|
REPAIR (T4 (A))
|
LF
|
310.000
|
$100.000
|
$320.000
|
$320.000
|
$400.000
|
$493.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
177.000
|
$200.000
|
$780.000
|
$780.000
|
$800.000
|
$331.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
937.000
|
$50.000
|
$43.000
|
$40.000
|
$60.000
|
$46.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
438.000
|
$35.000
|
$143.000
|
$143.000
|
$200.000
|
$99.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
9.000
|
$76.000
|
$50.000
|
$50.000
|
$75.000
|
$28.000
|
|
|
CNC CRACK REPAIR (FLOOD)(GRAVITY)
|
SF
|
279,367.000
|
$5.000
|
$2.400
|
$2.500
|
$3.500
|
$2.300
|
|
|
REP STL BRIDGE MEMBER (DIAPHRAGM)
|
EA
|
11.000
|
$3,800.000
|
$1,500.000
|
$1,500.000
|
$5,000.000
|
$2,500.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
2,872.000
|
$475.000
|
$925.000
|
$925.000
|
$1,000.000
|
$474.000
|
|
|
REPLACING ELASTOMERIC BEARING PADS
|
EA
|
8.000
|
$12,000.000
|
$9,500.000
|
$9,500.000
|
$11,000.000
|
$25,000.000
|
|
|
CONCRETE BEAM REPAIR
|
EA
|
2.000
|
$40,000.000
|
$2,500.000
|
$2,500.000
|
$5,000.000
|
$3,200.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
43.000
|
$30,000.000
|
$4,200.000
|
$4,200.000
|
$6,500.000
|
$2,300.000
|
|
|
STEEL BRIDGE ZONE PAINTING
|
LS
|
1.000
|
$170,000.000
|
$427,915.000
|
$372,100.000
|
$420,000.000
|
$3,500,000.000
|
|
|
BENT CAP/ABUTMENT CAP CLEANING
|
EA
|
11.000
|
$2,000.000
|
$1,400.000
|
$1,000.000
|
$2,500.000
|
$1,600.000
|
|
Totals: |
$20,026,678.500
|
$22,250,006.040
|
$23,480,467.130
|
$23,779,129.500
|
$24,607,779.250
|