REMOVING CONC (CURB)
|
LF
|
450.000
|
$7.000
|
$10.000
|
$10.000
|
$12.500
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
|
TON
|
132.000
|
$115.000
|
$120.000
|
$200.000
|
$200.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,200.000
|
$4.000
|
$5.000
|
$11.000
|
$20.000
|
|
|
PLANE CONC PAV(0" TO 2")
|
SY
|
225.000
|
$4.500
|
$5.000
|
$8.500
|
$20.000
|
|
|
FULL - DEPTH REPAIR CPJR (8")
|
SY
|
1,740.000
|
$150.000
|
$150.000
|
$234.300
|
$200.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
19,200.000
|
$2.750
|
$3.000
|
$2.300
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$58,328.000
|
$50,000.000
|
$85,000.000
|
$120,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$12,000.000
|
$10,000.000
|
$9,000.000
|
$12,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
400.000
|
$20.000
|
$18.000
|
$24.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
400.000
|
$8.000
|
$10.000
|
$9.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$2.500
|
$5.000
|
$2.700
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$5.000
|
$0.500
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
500.000
|
$5.000
|
$5.000
|
$4.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$1.000
|
$5.000
|
$0.750
|
$8.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
500.000
|
$3.000
|
$8.000
|
$3.500
|
$4.000
|
|
|
CONC CURB (TY II)
|
LF
|
450.000
|
$25.000
|
$10.000
|
$36.000
|
$25.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
14.000
|
$100.000
|
$100.000
|
$275.000
|
$85.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
3.000
|
$2,000.000
|
$2,000.000
|
$3,100.000
|
$1,850.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
20.000
|
$14.000
|
$20.000
|
$21.000
|
$100.000
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
40.000
|
$25.000
|
$30.000
|
$31.000
|
$100.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
2.000
|
$1,000.000
|
$1,200.000
|
$1,300.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$410.000
|
$500.000
|
$1,600.000
|
$650.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
350.000
|
$2.000
|
$1.000
|
$1.250
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
100.000
|
$1.500
|
$1.000
|
$1.500
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,170.000
|
$0.750
|
$1.000
|
$0.850
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,591.000
|
$3.000
|
$3.000
|
$3.150
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
602.000
|
$6.000
|
$5.000
|
$6.500
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
90.000
|
$115.000
|
$100.000
|
$108.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
62.000
|
$130.000
|
$125.000
|
$130.000
|
$150.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
33,500.000
|
$0.150
|
$0.105
|
$0.210
|
$1.000
|
|
|
PAVEMENT SEALER 8"
|
LF
|
3,170.000
|
$0.250
|
$0.210
|
$0.310
|
$1.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,591.000
|
$0.750
|
$1.500
|
$0.600
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
602.000
|
$2.350
|
$1.838
|
$1.150
|
$10.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
90.000
|
$26.000
|
$32.000
|
$21.000
|
$150.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
62.000
|
$30.000
|
$45.000
|
$25.000
|
$150.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
9,500.000
|
$0.350
|
$0.450
|
$0.400
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,000.000
|
$0.300
|
$0.400
|
$0.400
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
12,000.000
|
$0.300
|
$0.400
|
$0.400
|
$0.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
600.000
|
$3.000
|
$4.000
|
$3.000
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
33,500.000
|
$0.500
|
$0.450
|
$0.310
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
3,170.000
|
$0.600
|
$0.500
|
$0.650
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
2,591.000
|
$1.500
|
$1.250
|
$1.250
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
602.000
|
$4.000
|
$3.100
|
$2.500
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
90.000
|
$77.000
|
$32.000
|
$78.000
|
$150.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
62.000
|
$77.000
|
$42.000
|
$92.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
33,500.000
|
$0.100
|
$0.060
|
$0.210
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,170.000
|
$0.200
|
$0.200
|
$0.370
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,591.000
|
$0.800
|
$0.550
|
$0.550
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
602.000
|
$1.000
|
$0.750
|
$1.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
90.000
|
$20.000
|
$21.000
|
$16.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
62.000
|
$20.000
|
$32.000
|
$20.000
|
$150.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
100.000
|
$4.000
|
$10.000
|
$3.750
|
$2.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
1.000
|
$250.000
|
$1,000.000
|
$850.000
|
$1,000.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
1.000
|
$50.000
|
$150.000
|
$150.000
|
$500.000
|
|
|
CRACK CLEANING AND SEALING (JCP)
|
LF
|
9,600.000
|
$2.500
|
$2.900
|
$2.450
|
$10.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
250.000
|
$50.000
|
$40.000
|
$65.000
|
$100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$5,000.000
|
$7,200.000
|
$16,500.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
2,364.000
|
$3.000
|
$3.000
|
$2.500
|
$10.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
23.000
|
$360.000
|
$300.000
|
$300.000
|
$450.000
|
|
|
RADAR DETECTOR
|
EA
|
16.000
|
$1,300.000
|
$1,300.000
|
$1,475.000
|
$1,500.000
|
|
|
RADAR COMMUNICATION CABLE
|
LF
|
4,303.000
|
$2.000
|
$5.000
|
$5.000
|
$3.000
|
|
Totals: |
$677,610.750
|
$674,379.676
|
$882,578.950
|
$1,273,949.000
|