|
|
REMOVING CONC (CURB)
|
LF
|
3,000.000
|
$4.500
|
$5.500
|
$8.000
|
$8.600
|
$7.000
|
$12.500
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,000.000
|
$8.000
|
$5.500
|
$8.000
|
$8.600
|
$7.000
|
$20.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
8,899.000
|
$87.000
|
$108.450
|
$104.000
|
$100.000
|
$135.000
|
$100.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,010.000
|
$40.000
|
$49.000
|
$77.000
|
$45.000
|
$97.000
|
$55.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
1,596.000
|
$27.000
|
$75.000
|
$78.000
|
$74.750
|
$75.000
|
$50.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
80,900.000
|
$2.000
|
$1.950
|
$2.200
|
$2.250
|
$2.600
|
$5.000
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
168.000
|
$30.000
|
$91.000
|
$63.000
|
$39.250
|
$32.000
|
$100.000
|
|
|
FULL-DEPTH REPAIR CPCD (9") HES
|
SY
|
5,323.000
|
$180.000
|
$143.000
|
$155.000
|
$180.350
|
$147.000
|
$300.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
168.000
|
$20.000
|
$23.000
|
$57.000
|
$34.000
|
$28.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$248,237.000
|
$300,000.000
|
$300,000.000
|
$350,000.000
|
$355,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$8,700.000
|
$6,500.000
|
$12,500.000
|
$49,116.000
|
$15,000.000
|
$8,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,600.000
|
$2.000
|
$1.550
|
$1.500
|
$2.100
|
$1.450
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,600.000
|
$0.500
|
$0.450
|
$0.500
|
$0.650
|
$0.420
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
3,600.000
|
$3.500
|
$4.500
|
$4.500
|
$3.500
|
$4.250
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,600.000
|
$1.000
|
$0.550
|
$0.500
|
$0.650
|
$0.500
|
$6.000
|
|
|
CONC CURB (TY I)
|
LF
|
1,000.000
|
$20.000
|
$28.000
|
$33.000
|
$35.000
|
$30.000
|
$28.000
|
|
|
CONC CURB (TY II)
|
LF
|
2,000.000
|
$22.000
|
$41.000
|
$47.000
|
$50.000
|
$45.000
|
$30.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
1,000.000
|
$25.000
|
$50.000
|
$60.000
|
$60.000
|
$55.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
5.000
|
$60.000
|
$100.000
|
$17.000
|
$100.000
|
$112.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,620.000
|
$0.400
|
$5.000
|
$4.500
|
$4.450
|
$4.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,086.000
|
$0.900
|
$2.000
|
$1.700
|
$1.300
|
$1.000
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,297.000
|
$0.900
|
$1.150
|
$1.100
|
$1.150
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,133.000
|
$3.500
|
$4.000
|
$4.000
|
$3.900
|
$3.500
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
646.000
|
$5.500
|
$6.500
|
$6.000
|
$6.200
|
$5.600
|
$69.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
16.000
|
$117.000
|
$160.000
|
$150.000
|
$154.250
|
$140.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
3.000
|
$190.000
|
$343.000
|
$330.000
|
$330.500
|
$300.000
|
$400.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
16.000
|
$160.000
|
$183.000
|
$180.000
|
$176.300
|
$160.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
18.000
|
$850.000
|
$686.000
|
$660.000
|
$661.000
|
$600.000
|
$700.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
17.000
|
$900.000
|
$686.000
|
$660.000
|
$661.000
|
$600.000
|
$700.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
13.000
|
$22.000
|
$68.000
|
$65.000
|
$66.100
|
$60.000
|
$100.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
149,803.000
|
$0.180
|
$0.150
|
$0.140
|
$0.150
|
$0.120
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,297.000
|
$0.300
|
$0.350
|
$0.340
|
$0.350
|
$0.300
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,077.000
|
$1.300
|
$1.750
|
$1.600
|
$1.660
|
$1.500
|
$2.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
520.000
|
$2.300
|
$2.850
|
$2.800
|
$2.800
|
$2.500
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
16.000
|
$30.000
|
$45.000
|
$45.000
|
$44.100
|
$40.000
|
$100.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
16.000
|
$30.000
|
$45.000
|
$45.000
|
$44.100
|
$40.000
|
$100.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
3.000
|
$40.000
|
$68.000
|
$65.000
|
$66.100
|
$60.000
|
$100.000
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
15.000
|
$240.000
|
$285.000
|
$280.000
|
$275.400
|
$250.000
|
$300.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
15.000
|
$300.000
|
$285.000
|
$280.000
|
$275.400
|
$250.000
|
$300.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
8.000
|
$20.000
|
$57.000
|
$55.000
|
$55.100
|
$50.000
|
$100.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
19,060.000
|
$0.500
|
$0.550
|
$0.500
|
$0.550
|
$0.480
|
$0.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
80,577.000
|
$0.400
|
$0.450
|
$0.450
|
$0.450
|
$0.400
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
82,825.000
|
$0.400
|
$0.450
|
$0.450
|
$0.450
|
$0.400
|
$0.750
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
975.000
|
$3.500
|
$4.500
|
$4.500
|
$4.450
|
$4.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
149,803.000
|
$0.350
|
$0.550
|
$0.500
|
$0.550
|
$0.480
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,297.000
|
$0.700
|
$0.600
|
$0.600
|
$0.650
|
$0.550
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,077.000
|
$1.500
|
$2.300
|
$2.200
|
$2.250
|
$2.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
520.000
|
$2.500
|
$3.500
|
$3.400
|
$3.350
|
$3.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
16.000
|
$60.000
|
$57.000
|
$57.000
|
$55.100
|
$50.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
3.000
|
$100.000
|
$114.000
|
$112.000
|
$110.200
|
$100.000
|
$150.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
16.000
|
$100.000
|
$85.000
|
$80.000
|
$82.650
|
$75.000
|
$125.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
15.000
|
$600.000
|
$285.000
|
$280.000
|
$275.400
|
$250.000
|
$300.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
14.000
|
$600.000
|
$285.000
|
$280.000
|
$275.400
|
$250.000
|
$300.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
8.000
|
$40.000
|
$45.000
|
$45.000
|
$44.100
|
$40.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
149,803.000
|
$0.100
|
$0.060
|
$0.050
|
$0.070
|
$0.050
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,297.000
|
$0.200
|
$0.110
|
$0.110
|
$0.120
|
$0.100
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,077.000
|
$0.700
|
$0.550
|
$0.550
|
$0.600
|
$0.500
|
$0.850
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
520.000
|
$1.400
|
$0.800
|
$0.800
|
$0.800
|
$0.700
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
16.000
|
$20.000
|
$28.000
|
$28.000
|
$27.550
|
$25.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
3.000
|
$30.000
|
$57.000
|
$55.000
|
$55.100
|
$50.000
|
$75.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
16.000
|
$30.000
|
$57.000
|
$55.000
|
$55.100
|
$50.000
|
$75.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
15.000
|
$211.000
|
$228.000
|
$220.000
|
$220.350
|
$200.000
|
$300.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
15.000
|
$316.000
|
$228.000
|
$220.000
|
$220.350
|
$200.000
|
$300.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
8.000
|
$12.000
|
$22.000
|
$22.500
|
$22.050
|
$20.000
|
$50.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
695.000
|
$12.500
|
$31.000
|
$25.000
|
$31.200
|
$22.000
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,300.000
|
$20,000.000
|
$15,000.000
|
$9,000.000
|
$17,000.000
|
$16,000.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
4.000
|
$300.000
|
$475.000
|
$500.000
|
$625.000
|
$440.000
|
$350.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$10,300.000
|
$23,750.000
|
$50,000.000
|
$16,100.000
|
$16,500.000
|
$15,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$250.000
|
$60.000
|
$600.000
|
$55.100
|
$750.000
|
$850.000
|
|
Totals: |
$2,782,808.790
|
$3,063,097.800
|
$3,265,060.170
|
$3,515,256.670
|
$3,559,589.800
|
$4,435,510.150
|