|
|
REMOVING CONC (CURB)
|
LF
|
406.000
|
$10.000
|
$15.000
|
$12.000
|
$20.000
|
$9.250
|
$10.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
484.000
|
$3.500
|
$8.310
|
$3.000
|
$10.000
|
$2.750
|
$2.650
|
|
|
BLOCK SODDING
|
SY
|
484.000
|
$4.500
|
$18.390
|
$1.000
|
$10.000
|
$7.000
|
$6.750
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
484.000
|
$0.350
|
$13.640
|
$0.010
|
$10.000
|
$2.050
|
$2.100
|
|
|
VEGETATIVE WATERING
|
MG
|
72.000
|
$10.000
|
$6.000
|
$0.010
|
$50.000
|
$260.000
|
$52.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
141,105.000
|
$2.500
|
$2.500
|
$0.750
|
$4.000
|
$2.300
|
$2.350
|
|
|
FULL - DEPTH REPAIR CPJR (10")
|
SY
|
550.000
|
$400.000
|
$601.000
|
$290.000
|
$300.000
|
$390.000
|
$408.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
22.000
|
$500.000
|
$575.000
|
$350.000
|
$350.000
|
$625.000
|
$610.000
|
|
|
APPROACH SLAB (EXTEND)
|
CY
|
10.000
|
$750.000
|
$1,580.000
|
$520.000
|
$7,000.000
|
$6,500.000
|
$1,800.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
428.000
|
$275.000
|
$200.000
|
$225.000
|
$250.000
|
$220.000
|
$225.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
38.000
|
$200.000
|
$363.460
|
$400.000
|
$185.000
|
$325.000
|
$330.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
5,352.000
|
$5.000
|
$3.000
|
$8.100
|
$30.000
|
$70.000
|
$70.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$75,000.000
|
$33,500.000
|
$100,000.000
|
$65,000.000
|
$36,000.000
|
$38,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$346,303.000
|
$344,000.000
|
$370,000.000
|
$350,000.000
|
$300,000.000
|
$295,678.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$18,000.000
|
$21,535.000
|
$26,000.000
|
$8,500.000
|
$10,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
125.000
|
$40.000
|
$102.000
|
$1.000
|
$30.000
|
$62.000
|
$62.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
125.000
|
$10.000
|
$14.000
|
$1.000
|
$15.000
|
$12.000
|
$11.300
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
164.000
|
$20.000
|
$41.240
|
$1.000
|
$40.000
|
$30.000
|
$29.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
164.000
|
$10.000
|
$14.000
|
$1.000
|
$20.000
|
$9.500
|
$9.250
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$2.500
|
$3.750
|
$1.000
|
$4.000
|
$2.950
|
$2.880
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$0.750
|
$0.850
|
$1.000
|
$2.000
|
$0.800
|
$0.790
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,000.000
|
$4.250
|
$4.180
|
$1.000
|
$18.000
|
$4.500
|
$4.450
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$1.250
|
$0.850
|
$1.000
|
$9.000
|
$1.000
|
$0.950
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
1,000.000
|
$8.250
|
$9.000
|
$1.000
|
$10.000
|
$8.250
|
$8.000
|
|
|
CONC CURB (TY II)
|
LF
|
406.000
|
$32.000
|
$75.000
|
$20.000
|
$55.000
|
$60.000
|
$60.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,910.000
|
$1.000
|
$1.250
|
$1.500
|
$6.000
|
$1.600
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,710.000
|
$1.200
|
$1.100
|
$1.150
|
$2.000
|
$1.250
|
$1.220
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,520.000
|
$4.400
|
$3.950
|
$4.000
|
$5.000
|
$4.250
|
$4.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,250.000
|
$7.000
|
$7.550
|
$7.000
|
$8.000
|
$8.250
|
$7.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
12.000
|
$140.000
|
$175.000
|
$153.000
|
$200.000
|
$195.000
|
$158.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$170.000
|
$210.000
|
$206.000
|
$200.000
|
$230.000
|
$214.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
14,501.000
|
$0.350
|
$0.200
|
$0.330
|
$1.000
|
$0.220
|
$0.350
|
|
|
PAVEMENT SEALER 12"
|
LF
|
310.000
|
$1.100
|
$1.000
|
$1.500
|
$6.000
|
$1.100
|
$1.550
|
|
|
PAVEMENT SEALER 24"
|
LF
|
200.000
|
$2.100
|
$2.000
|
$3.000
|
$6.000
|
$2.200
|
$3.110
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
12.000
|
$30.000
|
$35.000
|
$61.000
|
$150.000
|
$38.000
|
$64.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
6.000
|
$42.000
|
$40.000
|
$67.000
|
$150.000
|
$45.000
|
$70.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
19,790.000
|
$1.000
|
$0.850
|
$0.740
|
$1.500
|
$0.950
|
$0.780
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
38,386.000
|
$1.150
|
$0.800
|
$0.680
|
$1.500
|
$0.900
|
$0.720
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
34,902.000
|
$1.150
|
$0.800
|
$0.680
|
$1.500
|
$0.900
|
$0.720
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,090.000
|
$4.660
|
$5.000
|
$5.000
|
$6.000
|
$5.500
|
$5.640
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,501.000
|
$0.350
|
$0.600
|
$0.560
|
$1.000
|
$0.650
|
$0.590
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
310.000
|
$1.750
|
$4.000
|
$2.300
|
$5.000
|
$4.500
|
$2.400
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
200.000
|
$3.500
|
$7.000
|
$4.450
|
$5.000
|
$7.500
|
$4.650
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
12.000
|
$53.000
|
$100.000
|
$65.000
|
$150.000
|
$110.000
|
$68.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$70.000
|
$100.000
|
$85.000
|
$150.000
|
$105.000
|
$89.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
14,501.000
|
$0.200
|
$0.100
|
$0.010
|
$0.500
|
$0.110
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
310.000
|
$0.390
|
$0.500
|
$0.010
|
$2.000
|
$0.550
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
200.000
|
$1.000
|
$1.000
|
$0.010
|
$3.000
|
$1.100
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
12.000
|
$37.000
|
$25.000
|
$3.000
|
$100.000
|
$26.000
|
$3.110
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$37.000
|
$25.000
|
$3.000
|
$100.000
|
$26.000
|
$3.110
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
1,064.000
|
$11.000
|
$40.000
|
$40.000
|
$15.000
|
$44.000
|
$46.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
350.000
|
$50.000
|
$80.000
|
$120.000
|
$100.000
|
$87.000
|
$92.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
1,000.000
|
$3.250
|
$32.000
|
$6.000
|
$50.000
|
$35.000
|
$37.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
2.000
|
$500.000
|
$2,000.000
|
$3,000.000
|
$2,500.000
|
$2,200.000
|
$1,400.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
18.000
|
$700.000
|
$825.000
|
$340.000
|
$1,000.000
|
$900.000
|
$950.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
27.000
|
$110.000
|
$100.000
|
$180.000
|
$500.000
|
$110.000
|
$115.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
57.000
|
$95.000
|
$160.000
|
$190.000
|
$500.000
|
$115.000
|
$46.000
|
|
|
BRIDGE JOINT REPAIR (HEADER)
|
LF
|
490.500
|
$250.000
|
$160.000
|
$205.000
|
$125.000
|
$170.000
|
$181.000
|
|
|
CONCRETE BEAM REP (STRAND SPLICE)
|
EA
|
1.000
|
$4,500.000
|
$20,000.000
|
$20,000.000
|
$35,000.000
|
$22,000.000
|
$23,100.000
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
8,363.000
|
$185.000
|
$163.000
|
$250.000
|
$150.000
|
$196.000
|
$204.000
|
|
|
BONDING COURSE
|
GAL
|
28,221.000
|
$4.500
|
$0.400
|
$0.010
|
$6.000
|
$3.400
|
$3.100
|
|
|
CONCRETE SCUPPER
|
EA
|
4.000
|
$2,500.000
|
$9,500.000
|
$10,000.000
|
$8,000.000
|
$5,500.000
|
$5,200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,000.000
|
$11,366.250
|
$9,500.000
|
$12,500.000
|
$13,000.000
|
$8,000.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
344.000
|
$2.740
|
$5.650
|
$6.000
|
$20.000
|
$6.250
|
$6.500
|
|
|
GROUND BOX (PREPARE)
|
EA
|
9.000
|
$350.000
|
$435.000
|
$500.000
|
$650.000
|
$475.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
207.000
|
$375.000
|
$394.700
|
$100.000
|
$250.000
|
$200.000
|
$0.010
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
103.000
|
$500.000
|
$3.000
|
$1.000
|
$550.000
|
$500.000
|
$0.010
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
4.000
|
$7,455.000
|
$21,100.000
|
$22,000.000
|
$30,000.000
|
$23,000.000
|
$24,300.000
|
|
Totals: |
$3,572,129.860
|
$3,443,569.100
|
$3,748,029.160
|
$3,928,943.000
|
$3,980,628.780
|
$3,983,208.340
|