PREPARING ROW
|
STA
|
11.000
|
$5,000.000
|
$52,467.010
|
$40,070.000
|
$6,600.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
110.000
|
$20.000
|
$31.904
|
$25.000
|
$27.500
|
|
|
REMOV CONC (CURB)
|
LF
|
155.000
|
$20.000
|
$5.812
|
$15.000
|
$11.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
1,912.000
|
$15.000
|
$7.395
|
$35.000
|
$33.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
119.000
|
$27.000
|
$13.505
|
$40.000
|
$55.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,771.000
|
$5.000
|
$1.439
|
$3.000
|
$8.800
|
|
|
BLOCK SODDING
|
SY
|
1,771.000
|
$4.000
|
$3.995
|
$13.750
|
$7.150
|
|
|
HYDRO MULCH SEED (PERM_URBAN_CLAY)
|
SY
|
637.000
|
$5.000
|
$0.063
|
$2.500
|
$9.010
|
|
|
VEGETATIVE WATERING
|
TGL
|
358.000
|
$35.000
|
$5.520
|
$40.000
|
$291.500
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
|
SY
|
637.000
|
$3.250
|
$1.506
|
$3.000
|
$9.010
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
5,965.000
|
$125.000
|
$217.612
|
$180.000
|
$204.120
|
|
|
TACK COAT
|
GAL
|
5,965.000
|
$5.000
|
$1.615
|
$6.000
|
$0.010
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,000.000
|
$100.000
|
$134.661
|
$90.000
|
$123.120
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
8,927.000
|
$2.500
|
$21.511
|
$8.500
|
$8.780
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
54,193.000
|
$2.500
|
$3.143
|
$2.500
|
$2.960
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
1,400.000
|
$250.000
|
$204.685
|
$245.000
|
$205.200
|
|
|
FULL - DEPTH REPAIR CRCP (13")
|
SY
|
700.000
|
$425.000
|
$323.186
|
$350.000
|
$324.000
|
|
|
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
|
SY
|
3.000
|
$600.000
|
$276.963
|
$1,400.000
|
$1,500.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
144.000
|
$250.000
|
$300.423
|
$270.000
|
$660.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
14.800
|
$600.000
|
$5,273.425
|
$1,500.000
|
$4,500.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
8.000
|
$200.000
|
$148.651
|
$400.000
|
$594.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
315.000
|
$120.000
|
$55.897
|
$50.000
|
$165.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
1,056.000
|
$125.000
|
$226.230
|
$90.000
|
$80.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
8,708.000
|
$100.000
|
$109.691
|
$125.000
|
$183.600
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
12.000
|
$350.000
|
$140.711
|
$250.000
|
$405.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
58.000
|
$500.000
|
$530.897
|
$630.000
|
$693.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
40.000
|
$600.000
|
$585.365
|
$680.000
|
$693.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
164.000
|
$600.000
|
$439.535
|
$580.000
|
$693.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2,018.000
|
$125.000
|
$132.987
|
$145.000
|
$172.800
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
7,541.000
|
$150.000
|
$118.663
|
$145.000
|
$178.200
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL3)
|
LF
|
1,324.000
|
$40.000
|
$9.434
|
$18.000
|
$27.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
3,929.000
|
$50.000
|
$29.631
|
$23.000
|
$31.320
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
504.000
|
$40.000
|
$14.867
|
$20.000
|
$27.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (2")
|
SY
|
10,659.000
|
$220.000
|
$213.413
|
$210.000
|
$220.000
|
|
|
RETROFIT RAIL (TY SSTR)(HPC)
|
LF
|
1,568.100
|
$175.000
|
$147.675
|
$170.000
|
$161.700
|
|
|
RAISING EXIST STRUCT
|
EA
|
3.000
|
$25,000.000
|
$32,825.447
|
$45,000.000
|
$36,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,238,743.422
|
$1,148,502.852
|
$1,100,000.000
|
$801,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$25,000.000
|
$30,375.637
|
$32,340.000
|
$35,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$15,000.000
|
$7,002.382
|
$25,000.000
|
$14,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
620.000
|
$225.000
|
$119.358
|
$300.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
25.000
|
$400.000
|
$161.412
|
$680.000
|
$350.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
2,345.000
|
$35.000
|
$48.798
|
$70.000
|
$35.200
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,345.000
|
$14.000
|
$6.821
|
$14.000
|
$16.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
848.000
|
$35.000
|
$23.866
|
$38.000
|
$22.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
848.000
|
$11.000
|
$8.150
|
$12.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,725.000
|
$4.500
|
$1.820
|
$3.990
|
$3.630
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
1,000.000
|
$25.000
|
$1.763
|
$10.000
|
$5.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,725.000
|
$1.400
|
$0.909
|
$1.000
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,000.000
|
$15.000
|
$4.192
|
$5.000
|
$6.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$5.000
|
$0.302
|
$1.250
|
$1.100
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
1,120.000
|
$150.000
|
$50.423
|
$150.000
|
$40.000
|
|
|
PTB (MOVE)(STEEL)
|
LF
|
1,840.000
|
$50.000
|
$9.935
|
$50.000
|
$9.410
|
|
|
PTB (REMOVE)(STEEL)
|
LF
|
1,120.000
|
$25.000
|
$21.791
|
$20.000
|
$10.740
|
|
|
CONC CURB (TY I)
|
LF
|
150.000
|
$50.000
|
$14.344
|
$22.000
|
$55.000
|
|
|
CONC CURB (TY II)
|
LF
|
5.000
|
$40.000
|
$24.130
|
$90.000
|
$88.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,162.500
|
$25.000
|
$20.841
|
$23.500
|
$27.280
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
17.000
|
$1,500.000
|
$1,892.664
|
$1,800.000
|
$2,194.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$3,000.000
|
$1,229.351
|
$1,200.000
|
$1,848.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,987.500
|
$3.000
|
$2.630
|
$2.500
|
$2.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$500.000
|
$255.353
|
$150.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,800.000
|
$3,447.860
|
$3,000.000
|
$3,729.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$700.000
|
$237.705
|
$250.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$3,000.000
|
$586.349
|
$1,800.000
|
$1,259.500
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$3,000.000
|
$703.133
|
$1,000.000
|
$907.500
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$6,747.916
|
$15,000.000
|
$8,563.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
55.000
|
$50.000
|
$16.344
|
$20.000
|
$16.500
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
50.000
|
$75.000
|
$22.000
|
$25.000
|
$27.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
968.000
|
$0.750
|
$0.747
|
$1.000
|
$7.000
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
450.000
|
$3.000
|
$0.807
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
6.000
|
$1,100.000
|
$1,373.544
|
$1,450.000
|
$1,595.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
7.000
|
$2,250.000
|
$1,912.189
|
$2,250.000
|
$2,475.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
90,078.000
|
$25.000
|
$0.150
|
$0.150
|
$0.170
|
|
|
PAVEMENT SLER (ENTR GORE)
|
EA
|
6.000
|
$500.000
|
$323.186
|
$400.000
|
$440.000
|
|
|
PAVEMENT SLER (EXIT GORE)
|
EA
|
7.000
|
$500.000
|
$538.644
|
$500.000
|
$550.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
18,016.000
|
$1.000
|
$0.570
|
$0.530
|
$0.580
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
36,031.000
|
$1.000
|
$0.538
|
$0.500
|
$0.550
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
36,031.000
|
$1.000
|
$0.538
|
$0.500
|
$0.550
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
901.000
|
$8.000
|
$4.093
|
$3.750
|
$4.130
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
90,078.000
|
$0.350
|
$0.635
|
$0.550
|
$0.610
|
|
|
ELIM EXT PM & MRKS (ENTR GORE)
|
EA
|
6.000
|
$500.000
|
$861.831
|
$300.000
|
$330.000
|
|
|
ELIM EXT PM & MRKS (EXIT GORE)
|
EA
|
7.000
|
$450.000
|
$1,292.747
|
$400.000
|
$440.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
6.000
|
$150.000
|
$538.644
|
$150.000
|
$165.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
7.000
|
$400.000
|
$861.831
|
$200.000
|
$220.000
|
|
|
LONGT CRACK CLEANING AND SEALING (CRCP)
|
LF
|
210.000
|
$50.000
|
$22.821
|
$25.000
|
$31.320
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
500.000
|
$65.000
|
$118.501
|
$95.000
|
$118.800
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
2,000.000
|
$6.000
|
$20.468
|
$10.000
|
$20.520
|
|
|
REPAIR (STEEL POST W/BASE PLATE)
|
EA
|
1.000
|
$300.000
|
$4,039.836
|
$1,500.000
|
$2,000.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
3.000
|
$200.000
|
$342.622
|
$900.000
|
$1,750.000
|
|
|
CONCRETE RAIL REPAIR (MISC)
|
LF
|
127.000
|
$200.000
|
$52.847
|
$30.000
|
$80.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
388.000
|
$40.000
|
$21.094
|
$25.000
|
$27.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
628.000
|
$25.000
|
$43.023
|
$25.000
|
$64.800
|
|
|
REP STL BRIDGE MBR (ANCHOR BOLT NUTS)
|
EA
|
3.000
|
$200.000
|
$296.170
|
$450.000
|
$250.000
|
|
|
BRIDGE JOINT REPLACEMENT (CONCRETE)
|
LF
|
409.000
|
$200.000
|
$420.095
|
$145.000
|
$520.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
963.000
|
$250.000
|
$379.990
|
$260.000
|
$615.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
114.000
|
$100.000
|
$38.831
|
$175.000
|
$105.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
11.000
|
$10,000.000
|
$6,497.973
|
$3,500.000
|
$1,000.000
|
|
|
DECK DRAIN SYSTEM DLE
|
LS
|
1.000
|
$15,000.000
|
$4,039.836
|
$75,000.000
|
$22,000.000
|
|
|
BENT CAP/ABUTMENT CAP CLEANING
|
EA
|
3.000
|
$700.000
|
$605.221
|
$880.000
|
$1,188.000
|
|
Totals: |
$13,090,782.972
|
$11,542,445.863
|
$11,682,456.830
|
$12,519,893.830
|