REMOV CONC (MEDIANS)
|
SY
|
311.000
|
$57.000
|
$45.000
|
$101.600
|
$50.000
|
$110.000
|
$406.440
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
329.000
|
$35.000
|
$39.000
|
$82.600
|
$50.000
|
$90.000
|
$203.220
|
|
|
REMOV CONC (CURB)
|
LF
|
39.000
|
$20.000
|
$22.000
|
$76.200
|
$50.000
|
$80.000
|
$101.610
|
|
|
EXCAV (ROADWAY)
|
CY
|
75.000
|
$90.000
|
$200.000
|
$254.000
|
$100.000
|
$110.000
|
$152.410
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
28.000
|
$300.000
|
$400.000
|
$983.900
|
$200.000
|
$70.000
|
$812.870
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
132.000
|
$230.000
|
$400.000
|
$857.000
|
$250.000
|
$80.000
|
$812.870
|
|
|
TACK COAT
|
GAL
|
49.000
|
$4.000
|
$20.000
|
$9.300
|
$10.000
|
$55.000
|
$304.820
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
44.000
|
$615.000
|
$360.000
|
$495.000
|
$450.000
|
$915.000
|
$602.500
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
91.000
|
$650.000
|
$475.000
|
$780.000
|
$550.000
|
$1,020.000
|
$844.360
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
264.000
|
$900.000
|
$560.000
|
$1,100.000
|
$650.000
|
$1,290.000
|
$1,067.070
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$775.000
|
$2,500.000
|
$2,539.100
|
$650.000
|
$2,650.000
|
$1,422.530
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
8.000
|
$800.000
|
$2,500.000
|
$2,539.100
|
$850.000
|
$2,800.000
|
$1,625.730
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$319,836.140
|
$310,000.000
|
$325,939.500
|
$300,000.000
|
$375,000.000
|
$220,792.650
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$25,000.000
|
$29,500.000
|
$14,007.200
|
$8,500.000
|
$15,000.000
|
$3,809.650
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
50.000
|
$150.000
|
$75.000
|
$127.000
|
$150.000
|
$80.000
|
$175.000
|
|
|
TMA (STATIONARY)
|
DAY
|
205.000
|
$315.000
|
$140.000
|
$300.000
|
$250.000
|
$750.000
|
$675.070
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
250.000
|
$14.000
|
$6.000
|
$9.000
|
$18.000
|
$2.000
|
$25.050
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
250.000
|
$7.000
|
$1.000
|
$4.000
|
$9.000
|
$1.000
|
$10.110
|
|
|
CONC CURB (TY II)
|
LF
|
604.000
|
$40.000
|
$26.000
|
$101.600
|
$60.000
|
$110.000
|
$121.930
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
179.000
|
$8.000
|
$26.000
|
$50.800
|
$15.000
|
$55.000
|
$203.220
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
36.000
|
$75.000
|
$70.000
|
$127.000
|
$65.000
|
$135.000
|
$875.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
269.000
|
$75.000
|
$105.000
|
$190.500
|
$65.000
|
$200.000
|
$304.820
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$3,125.000
|
$2,500.000
|
$6,220.800
|
$3,850.000
|
$6,500.000
|
$8,128.760
|
|
|
CURB RAMPS (TY 2)
|
EA
|
3.000
|
$3,800.000
|
$2,500.000
|
$6,347.700
|
$3,850.000
|
$6,800.000
|
$8,128.760
|
|
|
CURB RAMPS (TY 5)
|
EA
|
10.000
|
$5,000.000
|
$2,800.000
|
$7,363.300
|
$3,850.000
|
$7,900.000
|
$8,128.760
|
|
|
CURB RAMPS (TY 7)
|
EA
|
12.000
|
$3,250.000
|
$3,000.000
|
$6,347.700
|
$3,850.000
|
$6,800.000
|
$8,128.760
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$3,250.000
|
$3,200.000
|
$6,220.800
|
$3,850.000
|
$6,500.000
|
$10,160.950
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$3,500.000
|
$4,000.000
|
$7,617.200
|
$3,850.000
|
$8,100.000
|
$10,160.950
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
496.000
|
$29.000
|
$21.000
|
$22.800
|
$30.000
|
$37.000
|
$35.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
932.000
|
$36.000
|
$21.000
|
$26.000
|
$40.000
|
$41.000
|
$45.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
1,968.000
|
$60.000
|
$45.000
|
$34.000
|
$70.000
|
$74.000
|
$58.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
581.000
|
$69.000
|
$22.000
|
$30.000
|
$60.000
|
$43.000
|
$51.510
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
1,968.000
|
$70.000
|
$45.000
|
$40.000
|
$80.000
|
$77.000
|
$92.510
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
1,840.000
|
$2.750
|
$1.500
|
$2.000
|
$3.000
|
$3.000
|
$2.920
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,095.000
|
$3.000
|
$2.000
|
$3.000
|
$3.000
|
$4.000
|
$9.850
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
5,914.000
|
$3.250
|
$2.200
|
$3.000
|
$3.000
|
$5.000
|
$9.580
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
508.000
|
$3.500
|
$2.500
|
$4.000
|
$3.000
|
$5.000
|
$9.580
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
328.000
|
$5.000
|
$3.200
|
$5.000
|
$3.000
|
$6.000
|
$10.250
|
|
|
ITS GND BOX (POLY) TY 1 (243624)W/APRN
|
EA
|
5.000
|
$4,000.000
|
$3,000.000
|
$4,359.600
|
$3,000.000
|
$6,000.000
|
$6,600.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
10.000
|
$1,700.000
|
$2,000.000
|
$1,767.200
|
$1,150.000
|
$1,900.000
|
$1,800.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
23.000
|
$2,000.000
|
$3,000.000
|
$2,188.700
|
$1,150.000
|
$2,815.000
|
$3,000.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(E)PS(U)
|
EA
|
5.000
|
$12,000.000
|
$30,000.000
|
$9,121.600
|
$12,500.000
|
$12,250.000
|
$11,194.170
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
338.000
|
$36.000
|
$60.000
|
$35.000
|
$40.000
|
$90.000
|
$75.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$450.000
|
$60.000
|
$167.600
|
$250.000
|
$250.000
|
$540.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,225.000
|
$3.750
|
$1.500
|
$3.900
|
$6.000
|
$2.000
|
$5.080
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,599.000
|
$16.000
|
$6.500
|
$19.100
|
$20.000
|
$10.000
|
$16.260
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
13.000
|
$185.000
|
$200.000
|
$1,951.300
|
$250.000
|
$225.000
|
$406.440
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
2.000
|
$350.000
|
$350.000
|
$457.100
|
$550.000
|
$415.000
|
$609.660
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
8.000
|
$275.000
|
$250.000
|
$380.900
|
$500.000
|
$230.000
|
$406.440
|
|
|
PAVEMENT SLER 6"
|
LF
|
1,664.000
|
$0.650
|
$0.200
|
$1.300
|
$3.000
|
$0.250
|
$0.100
|
|
|
PAVEMENT SLER 8"
|
LF
|
341.000
|
$2.000
|
$0.200
|
$2.600
|
$6.000
|
$0.250
|
$0.120
|
|
|
PAVEMENT SLER 24"
|
LF
|
2,557.000
|
$4.250
|
$0.600
|
$2.600
|
$20.000
|
$3.000
|
$0.240
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
13.000
|
$150.000
|
$25.000
|
$95.300
|
$250.000
|
$20.000
|
$40.640
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
8.000
|
$150.000
|
$25.000
|
$120.700
|
$250.000
|
$25.000
|
$40.640
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
2.000
|
$60.000
|
$35.000
|
$152.400
|
$500.000
|
$40.000
|
$60.960
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
1,703.000
|
$1.000
|
$1.200
|
$3.900
|
$3.000
|
$1.500
|
$4.060
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
2,186.000
|
$1.000
|
$0.850
|
$3.900
|
$3.000
|
$1.500
|
$4.060
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,129.000
|
$1.000
|
$0.850
|
$3.900
|
$3.000
|
$1.000
|
$4.060
|
|
REFL PAV MRKR TY I-C
|
EA
|
16.000
|
$4.000
|
$5.000
|
$7.700
|
$6.000
|
$5.000
|
$12.190
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
49.000
|
$4.250
|
$5.000
|
$7.700
|
$6.000
|
$5.000
|
$12.190
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
155.000
|
$6.500
|
$5.000
|
$7.700
|
$6.000
|
$5.000
|
$16.260
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
717.000
|
$0.700
|
$0.600
|
$3.900
|
$2.000
|
$1.000
|
$3.050
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
6.000
|
$1.500
|
$1.000
|
$5.100
|
$6.000
|
$2.000
|
$6.100
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
275.000
|
$2.000
|
$2.000
|
$6.400
|
$20.000
|
$2.500
|
$10.160
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
312.000
|
$6.000
|
$4.000
|
$12.700
|
$20.000
|
$5.000
|
$20.320
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
1.000
|
$135.000
|
$65.000
|
$146.000
|
$250.000
|
$60.000
|
$304.820
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
1.000
|
$200.000
|
$100.000
|
$241.300
|
$500.000
|
$110.000
|
$406.440
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,858.000
|
$0.200
|
$0.070
|
$1.300
|
$3.000
|
$0.100
|
$1.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
387.000
|
$0.500
|
$0.100
|
$1.300
|
$6.000
|
$0.150
|
$1.520
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,629.000
|
$2.000
|
$0.300
|
$3.900
|
$20.000
|
$1.000
|
$2.020
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
9.000
|
$50.000
|
$10.000
|
$95.300
|
$250.000
|
$14.000
|
$91.450
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
8.000
|
$65.000
|
$10.000
|
$348.200
|
$250.000
|
$20.000
|
$101.610
|
|
|
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
|
EA
|
5.000
|
$50,000.000
|
$75,000.000
|
$65,000.000
|
$35,000.000
|
$35,000.000
|
$25,801.410
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
79.000
|
$360.000
|
$270.000
|
$421.500
|
$350.000
|
$750.000
|
$761.610
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
18.000
|
$363.000
|
$270.000
|
$421.500
|
$350.000
|
$750.000
|
$761.610
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
79.000
|
$360.000
|
$270.000
|
$421.500
|
$350.000
|
$750.000
|
$761.610
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
28.000
|
$363.000
|
$270.000
|
$421.500
|
$350.000
|
$750.000
|
$761.610
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
79.000
|
$360.000
|
$270.000
|
$421.500
|
$350.000
|
$750.000
|
$761.610
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
24.000
|
$363.000
|
$270.000
|
$421.500
|
$350.000
|
$750.000
|
$761.610
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
44.000
|
$1,500.000
|
$1,000.000
|
$421.500
|
$4,500.000
|
$1,400.000
|
$1,011.060
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
78.000
|
$325.000
|
$220.000
|
$198.100
|
$300.000
|
$285.000
|
$243.330
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
14.000
|
$500.000
|
$220.000
|
$279.300
|
$300.000
|
$300.000
|
$344.940
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
3,150.000
|
$3.500
|
$3.300
|
$3.000
|
$3.000
|
$4.000
|
$6.520
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
977.000
|
$3.500
|
$3.300
|
$4.000
|
$3.000
|
$4.000
|
$12.860
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
1,095.000
|
$4.000
|
$4.500
|
$5.000
|
$3.000
|
$7.000
|
$13.060
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
3,495.000
|
$7.000
|
$6.000
|
$9.000
|
$3.000
|
$9.000
|
$15.880
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
4,655.000
|
$4.000
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
$15.880
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$6,300.000
|
$1,000.000
|
$1,340.700
|
$2,500.000
|
$2,000.000
|
$12,153.430
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM
|
EA
|
1.000
|
$14,000.000
|
$20,000.000
|
$15,000.000
|
$16,500.000
|
$17,800.000
|
$19,259.930
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
3.000
|
$26,000.000
|
$22,000.000
|
$16,000.000
|
$18,500.000
|
$18,600.000
|
$21,901.780
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
6.000
|
$30,000.000
|
$23,000.000
|
$17,200.000
|
$21,000.000
|
$20,100.000
|
$22,308.220
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
2.000
|
$40,000.000
|
$27,000.000
|
$21,000.000
|
$23,000.000
|
$22,200.000
|
$31,453.070
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
6.000
|
$55,000.000
|
$40,000.000
|
$37,000.000
|
$62,000.000
|
$41,900.000
|
$52,259.310
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
1.000
|
$60,000.000
|
$41,000.000
|
$38,200.000
|
$63,000.000
|
$42,900.000
|
$55,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
3.000
|
$40,000.000
|
$42,000.000
|
$38,000.000
|
$64,000.000
|
$43,900.000
|
$58,000.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(60-40')LUM
|
EA
|
1.000
|
$75,000.000
|
$52,000.000
|
$45,000.000
|
$70,000.000
|
$52,500.000
|
$66,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
9.000
|
$5,500.000
|
$2,000.000
|
$3,610.600
|
$3,500.000
|
$7,000.000
|
$2,359.590
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
44.000
|
$1,700.000
|
$1,200.000
|
$1,302.600
|
$1,850.000
|
$1,250.000
|
$1,234.410
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
5.000
|
$5,750.000
|
$6,500.000
|
$5,327.000
|
$6,500.000
|
$5,500.000
|
$12,614.660
|
|
|
SPOT TREE TRIMMING / BRUSH REMOVAL
|
LF
|
20.000
|
$100.000
|
$250.000
|
$255.000
|
$500.000
|
$50.000
|
$952.880
|
|
|
RVDS (PRESENCE DET)(INSTALL ONLY)
|
EA
|
24.000
|
$2,000.000
|
$850.000
|
$1,900.000
|
$10,000.000
|
$3,050.000
|
$1,627.180
|
|
|
RVDS (PRES AND ADV)(INSTALL ONLY)
|
EA
|
10.000
|
$2,000.000
|
$850.000
|
$1,900.000
|
$15,000.000
|
$3,050.000
|
$1,627.180
|
|
Totals: |
$3,518,014.490
|
$3,099,433.210
|
$3,394,628.500
|
$3,773,319.000
|
$3,848,286.100
|
$4,193,635.780
|