PREPARING ROW
|
STA
|
76.610
|
$500.000
|
$2,500.000
|
$1,600.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
10,991.000
|
$12.000
|
$15.000
|
$17.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,052.000
|
$12.000
|
$20.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
5,945.000
|
$30.000
|
$30.000
|
$45.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
50.500
|
$265.000
|
$250.000
|
$500.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
8,147.000
|
$4.600
|
$10.000
|
$1.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
8,147.000
|
$0.250
|
$1.000
|
$0.330
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
8,147.000
|
$0.250
|
$1.000
|
$0.290
|
|
|
VEGETATIVE WATERING
|
MG
|
2,424.000
|
$2.000
|
$8.000
|
$2.100
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,842.000
|
$93.000
|
$80.000
|
$150.000
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
2,050.000
|
$65.000
|
$80.000
|
$165.000
|
|
|
CEMENT
|
TON
|
62.000
|
$300.000
|
$325.000
|
$400.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
12,296.000
|
$2.500
|
$8.000
|
$10.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
2,459.000
|
$5.500
|
$6.000
|
$14.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
7,345.000
|
$4.500
|
$6.000
|
$5.510
|
|
|
ASPH (RC-250)
|
GAL
|
1,130.000
|
$6.500
|
$6.000
|
$10.250
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
32.000
|
$210.000
|
$300.000
|
$450.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
1,696.000
|
$6.500
|
$6.000
|
$8.650
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
101.000
|
$203.000
|
$300.000
|
$248.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
77.000
|
$195.000
|
$300.000
|
$468.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
387.000
|
$100.000
|
$85.000
|
$97.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
150.000
|
$165.000
|
$125.000
|
$175.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
7,737.000
|
$5.000
|
$6.000
|
$4.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
9.000
|
$600.000
|
$550.000
|
$1,500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
18.000
|
$600.000
|
$550.000
|
$1,500.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
4.000
|
$200.000
|
$150.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$147,927.350
|
$200,000.000
|
$279,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$15,000.000
|
$8,500.000
|
$17,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$33.000
|
$40.000
|
$60.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$9.250
|
$15.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
84.000
|
$23.000
|
$40.000
|
$26.400
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
84.000
|
$8.500
|
$20.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,142.000
|
$3.000
|
$4.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,142.000
|
$0.600
|
$2.000
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
116.000
|
$4.500
|
$18.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
116.000
|
$1.000
|
$9.000
|
$1.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$23.000
|
$35.000
|
$22.220
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,200.000
|
$1,850.000
|
$1,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
660.000
|
$2.750
|
$3.000
|
$2.750
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$160.000
|
$500.000
|
$137.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,100.000
|
$3,250.000
|
$3,052.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$240.000
|
$1,500.000
|
$275.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
18.000
|
$45.000
|
$40.000
|
$93.500
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
17.000
|
$500.000
|
$650.000
|
$660.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
6.000
|
$40.000
|
$100.000
|
$71.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$35.000
|
$100.000
|
$27.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
15,168.000
|
$0.300
|
$1.100
|
$0.880
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
766.000
|
$1.000
|
$6.000
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
74.000
|
$8.000
|
$20.000
|
$20.900
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
14,618.000
|
$0.700
|
$1.100
|
$0.920
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
15,168.000
|
$0.700
|
$1.100
|
$0.920
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
190.000
|
$3.500
|
$5.000
|
$7.150
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
2,183.000
|
$125.000
|
$120.000
|
$145.000
|
|
|
TACK COAT
|
GAL
|
851.000
|
$3.500
|
$6.000
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,500.000
|
$10,000.000
|
$7,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
70.000
|
$250.000
|
$250.000
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$165.000
|
$550.000
|
$1,000.000
|
|
Totals: |
$1,732,200.850
|
$2,217,976.400
|
$2,802,533.550
|