PREPARING ROW
|
STA
|
61.700
|
$6,300.000
|
$376.000
|
$3,333.330
|
$7,400.000
|
$7,300.000
|
$750.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
43.000
|
$12.000
|
$20.000
|
$58.000
|
$21.000
|
$50.000
|
$100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
13,949.000
|
$18.000
|
$20.000
|
$31.500
|
$30.000
|
$20.000
|
$40.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
10,731.000
|
$28.000
|
$44.000
|
$52.500
|
$35.000
|
$35.000
|
$60.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
17,522.000
|
$1.500
|
$1.000
|
$1.500
|
$3.000
|
$10.000
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
17,522.000
|
$5.000
|
$4.500
|
$5.000
|
$5.000
|
$10.000
|
$8.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
17,522.000
|
$0.140
|
$0.250
|
$0.180
|
$0.180
|
$2.000
|
$0.450
|
|
|
VEGETATIVE WATERING
|
MG
|
5,213.100
|
$10.000
|
$58.000
|
$3.150
|
$40.000
|
$20.000
|
$65.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,390.000
|
$88.000
|
$92.000
|
$95.000
|
$125.000
|
$85.000
|
$100.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,002.000
|
$40.000
|
$31.000
|
$3.150
|
$8.000
|
$55.000
|
$65.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
158.000
|
$150.000
|
$170.000
|
$200.000
|
$153.000
|
$350.000
|
$400.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
172.000
|
$180.000
|
$194.000
|
$225.000
|
$156.000
|
$400.000
|
$600.000
|
|
|
CL C CONC (ABUT)(HPC)(SRC)
|
CY
|
27.000
|
$1,100.000
|
$1,509.000
|
$2,000.000
|
$1,450.000
|
$3,000.000
|
$2,500.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
2,180.000
|
$85.000
|
$187.000
|
$150.000
|
$120.000
|
$85.000
|
$150.000
|
|
|
RETAINING WALL (SPECIAL)
|
SF
|
2,642.000
|
$115.000
|
$103.000
|
$110.000
|
$85.000
|
$95.000
|
$135.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
32.000
|
$255.000
|
$407.000
|
$420.000
|
$397.000
|
$185.000
|
$375.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
260.000
|
$185.000
|
$342.000
|
$210.000
|
$123.000
|
$185.000
|
$200.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
31.000
|
$700.000
|
$768.000
|
$900.000
|
$581.000
|
$650.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
8.000
|
$450.000
|
$893.000
|
$1,000.000
|
$631.000
|
$550.000
|
$1,200.000
|
|
|
RAIL(PEDESTRIAN)(SPL)
|
LF
|
346.900
|
$300.000
|
$197.000
|
$250.000
|
$203.000
|
$220.000
|
$225.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
64.000
|
$65.000
|
$139.000
|
$150.000
|
$67.000
|
$120.000
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
74.000
|
$117.000
|
$194.000
|
$175.000
|
$83.000
|
$150.000
|
$180.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
47.000
|
$105.000
|
$238.000
|
$200.000
|
$114.000
|
$200.000
|
$320.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
84.000
|
$145.000
|
$362.000
|
$300.000
|
$137.000
|
$250.000
|
$360.000
|
|
|
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
|
EA
|
1.000
|
$6,000.000
|
$7,222.000
|
$7,500.000
|
$4,850.000
|
$12,500.000
|
$4,200.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$8,500.000
|
$27,497.000
|
$12,000.000
|
$19,600.000
|
$9,500.000
|
$4,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,150.000
|
$1,564.000
|
$1,000.000
|
$1,900.000
|
$1,850.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,700.000
|
$1,943.000
|
$2,000.000
|
$2,600.000
|
$2,250.000
|
$2,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,500.000
|
$3,036.000
|
$3,000.000
|
$2,900.000
|
$3,500.000
|
$4,000.000
|
|
|
PIPE (PVC) (SCH 40) (4 IN)
|
LF
|
60.000
|
$57.000
|
$69.000
|
$50.000
|
$69.000
|
$50.000
|
$100.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$2,000.000
|
$625.000
|
$4,000.000
|
$1,321.000
|
$2,500.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$393,761.000
|
$386,677.950
|
$400,000.000
|
$450,000.000
|
$450,000.000
|
$430,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$10,000.000
|
$2,182.000
|
$10,500.000
|
$20,000.000
|
$8,500.000
|
$7,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
110.000
|
$35.000
|
$23.000
|
$55.000
|
$32.890
|
$30.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
110.000
|
$13.000
|
$11.000
|
$27.500
|
$10.650
|
$15.000
|
$24.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
983.000
|
$25.000
|
$27.000
|
$26.400
|
$32.750
|
$40.000
|
$39.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
983.000
|
$10.000
|
$9.000
|
$13.200
|
$9.540
|
$20.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,006.000
|
$3.000
|
$2.500
|
$4.000
|
$3.620
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,006.000
|
$0.700
|
$0.750
|
$1.000
|
$0.590
|
$2.000
|
$1.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
718.000
|
$3.750
|
$3.500
|
$8.000
|
$0.360
|
$18.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
718.000
|
$1.200
|
$0.750
|
$2.000
|
$0.320
|
$9.000
|
$1.800
|
|
|
CONC SIDEWALKS (6")
|
SY
|
7,009.000
|
$150.000
|
$87.000
|
$82.000
|
$55.000
|
$80.000
|
$200.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
1,287.000
|
$175.000
|
$105.000
|
$110.000
|
$71.000
|
$85.000
|
$225.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
2.250
|
$40.000
|
$76.000
|
$126.000
|
$25.500
|
$100.000
|
$75.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
14.000
|
$745.000
|
$706.000
|
$1,000.000
|
$673.500
|
$1,500.000
|
$795.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$650.000
|
$695.000
|
$1,000.000
|
$587.500
|
$1,100.000
|
$500.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
129.000
|
$7.290
|
$16.000
|
$8.800
|
$8.000
|
$20.000
|
$12.500
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
1,117.000
|
$0.500
|
$2.000
|
$0.840
|
$0.760
|
$4.000
|
$5.000
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
18.000
|
$1.750
|
$23.000
|
$4.130
|
$3.750
|
$6.000
|
$2.500
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
129.000
|
$4.050
|
$14.000
|
$4.950
|
$4.500
|
$20.000
|
$10.000
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
1,518.000
|
$0.200
|
$3.000
|
$0.870
|
$0.790
|
$4.000
|
$1.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
40.000
|
$0.500
|
$2.500
|
$1.100
|
$1.000
|
$4.000
|
$1.000
|
|
TRAFFIC BUTTON TY I-A
|
EA
|
2.000
|
$10.000
|
$103.000
|
$11.000
|
$10.000
|
$6.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,675.000
|
$0.100
|
$1.000
|
$0.330
|
$0.300
|
$4.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
18.000
|
$0.500
|
$11.000
|
$0.550
|
$0.500
|
$6.000
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
129.000
|
$1.500
|
$16.000
|
$0.550
|
$0.750
|
$20.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
2.000
|
$0.190
|
$46.000
|
$1.100
|
$1.000
|
$250.000
|
$15.000
|
|
|
TREE PROTECTION
|
EA
|
5.000
|
$700.000
|
$179.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$500.000
|
|
|
PREFAB PED STL TRUSS BRG SPAN (130 FT)
|
EA
|
1.000
|
$300,000.000
|
$552,552.000
|
$450,000.000
|
$625,000.000
|
$750,000.000
|
$335,000.000
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
|
LF
|
551.000
|
$5.000
|
$3.000
|
$4.000
|
$4.910
|
$10.000
|
$15.000
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
|
LF
|
551.000
|
$2.000
|
$0.750
|
$1.000
|
$1.230
|
$2.000
|
$5.000
|
|
|
FOLDING BOLLARD
|
EA
|
1.000
|
$3,000.000
|
$447.000
|
$3,000.000
|
$2,800.000
|
$2,500.000
|
$1,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
1.000
|
$10,000.000
|
$525.000
|
$10,000.000
|
$30,000.000
|
$20,000.000
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
203.000
|
$135.000
|
$145.000
|
$150.000
|
$250.000
|
$250.000
|
$250.000
|
|
Totals: |
$4,296,372.220
|
$4,250,000.000
|
$4,338,488.116
|
$4,535,091.035
|
$4,857,411.000
|
$5,974,276.350
|