REMOVING CONC (RIPRAP)
|
SY
|
503.000
|
$25.000
|
$50.000
|
$42.000
|
$25.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,550.000
|
$2.300
|
$10.000
|
$2.700
|
$4.180
|
|
|
BLOCK SODDING
|
SY
|
1,550.000
|
$7.000
|
$10.000
|
$6.850
|
$7.390
|
|
|
VEGETATIVE WATERING
|
MG
|
231.000
|
$13.750
|
$50.000
|
$45.000
|
$65.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
|
SY
|
1,766.000
|
$85.000
|
$90.000
|
$91.000
|
$105.440
|
|
|
PLAN ASPH CONC PAV(0" TO 2.25")
|
SY
|
489,540.000
|
$2.000
|
$3.000
|
$2.900
|
$4.000
|
|
|
FULL - DEPTH REPAIR CRCP (9")
|
SY
|
3,134.000
|
$310.000
|
$300.000
|
$388.000
|
$351.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
49.000
|
$400.000
|
$350.000
|
$525.000
|
$350.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
588.000
|
$190.000
|
$200.000
|
$182.000
|
$220.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
10.000
|
$500.000
|
$500.000
|
$222.000
|
$254.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
99.000
|
$624.000
|
$650.000
|
$740.000
|
$823.040
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
84.000
|
$184.000
|
$185.000
|
$345.000
|
$338.800
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,113.000
|
$525.000
|
$500.000
|
$700.000
|
$904.180
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
1,511.000
|
$35.000
|
$90.000
|
$51.000
|
$30.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
2,218.000
|
$205.000
|
$125.000
|
$185.000
|
$347.500
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
460.000
|
$400.000
|
$650.000
|
$475.000
|
$429.590
|
|
|
JOINT SEALANT
|
LF
|
2,740.000
|
$40.000
|
$60.000
|
$39.000
|
$19.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$85,000.000
|
$35,000.000
|
$33,000.000
|
$108,675.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,569,405.170
|
$1,800,000.000
|
$919,804.000
|
$2,121,810.920
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$40,000.000
|
$8,500.000
|
$38,918.000
|
$75,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
330.000
|
$69.000
|
$50.000
|
$69.000
|
$98.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
330.000
|
$16.000
|
$15.000
|
$21.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
468.000
|
$35.000
|
$40.000
|
$37.570
|
$42.560
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
468.000
|
$14.000
|
$20.000
|
$16.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,000.000
|
$5.500
|
$4.000
|
$3.750
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,000.000
|
$2.100
|
$2.000
|
$0.950
|
$0.790
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,000.000
|
$5.780
|
$18.000
|
$4.200
|
$4.150
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$2.100
|
$9.000
|
$1.600
|
$0.790
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
500.000
|
$50.000
|
$100.000
|
$31.000
|
$28.860
|
|
|
PTB (MOVE)(STEEL)
|
LF
|
1,800.000
|
$25.000
|
$20.000
|
$26.000
|
$1.000
|
|
|
PTB (REMOVE)(STEEL)
|
LF
|
500.000
|
$12.000
|
$20.000
|
$26.000
|
$5.490
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
200.000
|
$50.000
|
$80.000
|
$44.000
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
120,124.000
|
$0.200
|
$0.500
|
$0.160
|
$0.110
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
20,718.000
|
$22.000
|
$23.000
|
$22.000
|
$20.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
47.000
|
$1,925.000
|
$2,000.000
|
$2,200.000
|
$1,775.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
35.000
|
$1,320.000
|
$2,000.000
|
$1,100.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
22,149.000
|
$2.000
|
$5.000
|
$2.200
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$125.000
|
$850.000
|
$133.000
|
$125.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
19.000
|
$125.000
|
$850.000
|
$80.000
|
$75.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$245.000
|
$850.000
|
$215.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
39.000
|
$3,000.000
|
$3,250.000
|
$2,900.000
|
$2,775.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
41.000
|
$225.000
|
$850.000
|
$210.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$2,100.000
|
$3,500.000
|
$1,050.000
|
$25.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,300.000
|
$2,500.000
|
$777.000
|
$953.650
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$45,000.000
|
$50,000.000
|
$38,000.000
|
$27,960.070
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$9,300.000
|
$21,000.000
|
$8,000.000
|
$7,597.230
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
100.000
|
$20.000
|
$100.000
|
$21.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
100.000
|
$20.000
|
$100.000
|
$21.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
452.000
|
$30.000
|
$100.000
|
$26.500
|
$25.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
26,892.000
|
$1.200
|
$3.000
|
$1.050
|
$1.250
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
12.000
|
$850.000
|
$1,250.000
|
$600.000
|
$550.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
13.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
$925.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
52,020.000
|
$0.850
|
$1.250
|
$0.660
|
$0.630
|
|
|
PAVEMENT SEALER 6"
|
LF
|
31,760.000
|
$0.200
|
$0.500
|
$0.260
|
$0.240
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
52,020.000
|
$0.650
|
$1.000
|
$0.640
|
$0.610
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
69,286.000
|
$0.750
|
$1.000
|
$0.640
|
$0.610
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
69,286.000
|
$0.750
|
$1.000
|
$0.640
|
$0.610
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
9.000
|
$6,000.000
|
$5,000.000
|
$2,200.000
|
$2,065.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,598.000
|
$5.400
|
$6.000
|
$4.000
|
$3.700
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
18,080.000
|
$0.660
|
$1.000
|
$0.620
|
$0.590
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
13,680.000
|
$0.730
|
$1.000
|
$0.730
|
$0.690
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
31,760.000
|
$0.230
|
$1.000
|
$0.140
|
$0.130
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
14,558.000
|
$4.500
|
$12.000
|
$13.500
|
$13.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
35.000
|
$98.000
|
$1,000.000
|
$80.000
|
$120.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
354.000
|
$500.000
|
$1,000.000
|
$475.000
|
$421.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
82.000
|
$615.000
|
$1,000.000
|
$800.000
|
$567.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
97,908.000
|
$4.000
|
$5.000
|
$3.850
|
$3.800
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
66,639.000
|
$135.000
|
$160.000
|
$178.000
|
$155.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$410.000
|
$1,500.000
|
$310.000
|
$2,116.960
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$16,500.000
|
$14,000.000
|
$16,250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
438.000
|
$350.000
|
$250.000
|
$370.000
|
$160.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
219.000
|
$350.000
|
$350.000
|
$0.010
|
$5.120
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
LS
|
1.000
|
$15,000.000
|
$85,000.000
|
$24,500.000
|
$35,000.000
|
|
Totals: |
$17,263,456.820
|
$20,222,498.000
|
$20,304,430.570
|
$21,218,109.200
|