COMPOST MANUF TOPSOIL (4")
|
SY
|
300.000
|
$1.210
|
$2.200
|
$2.000
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
300.000
|
$4.500
|
$7.700
|
$10.000
|
$7.000
|
|
|
VEGETATIVE WATERING
|
MG
|
45.000
|
$3.190
|
$220.000
|
$75.000
|
$200.000
|
|
|
STRUCT EXCAV
|
CY
|
85.000
|
$10.000
|
$102.000
|
$35.000
|
$220.000
|
|
|
CEM STABIL BKFL
|
CY
|
85.000
|
$209.470
|
$100.000
|
$115.000
|
$220.000
|
|
|
CUT & RESTORING PAV
|
SY
|
8.000
|
$104.500
|
$1,180.000
|
$500.000
|
$500.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
2.000
|
$275.000
|
$1,000.000
|
$750.000
|
$500.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
23.100
|
$633.230
|
$1,450.000
|
$850.000
|
$2,000.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
17,683.000
|
$9.000
|
$6.550
|
$4.500
|
$7.250
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
59.000
|
$550.000
|
$162.000
|
$110.000
|
$500.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
1,872.000
|
$226.550
|
$158.000
|
$125.000
|
$200.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
268.100
|
$253.000
|
$154.000
|
$100.000
|
$300.000
|
|
|
CONC STR REPR(REMOV AND REPL BACKWALL)
|
CY
|
3.700
|
$2,800.000
|
$8,800.000
|
$4,500.000
|
$25,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.000
|
$459.040
|
$10,000.000
|
$1,500.000
|
$500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
94.000
|
$180.420
|
$400.000
|
$190.000
|
$300.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
1.000
|
$828.880
|
$10,000.000
|
$1,800.000
|
$500.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
810.000
|
$24.150
|
$35.200
|
$40.000
|
$30.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
400.000
|
$23.890
|
$16.000
|
$12.000
|
$26.000
|
|
|
CONCRETE OVERLAY (2.5 IN)
|
SY
|
9,984.000
|
$82.000
|
$69.750
|
$100.000
|
$100.000
|
|
|
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
|
LS
|
1.000
|
$132,000.000
|
$376,000.000
|
$250,000.000
|
$341,000.000
|
|
|
MILLING CONCRETE SLAB (1 IN)
|
SY
|
9,984.000
|
$4.040
|
$6.000
|
$6.500
|
$12.000
|
|
|
HYDRO-DEMOLITION (1 1/2 IN)
|
SY
|
9,984.000
|
$70.380
|
$77.000
|
$80.000
|
$65.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$407,000.000
|
$138,000.000
|
$90,000.000
|
$140,000.000
|
|
|
REMOVE STR (CONC)
|
EA
|
2.000
|
$6,451.610
|
$7,250.000
|
$1,300.000
|
$250.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
1.000
|
$5,500.000
|
$25,200.000
|
$3,000.000
|
$18,000.000
|
|
|
REMOV STR (DRAINAGE FLUME)
|
EA
|
1.000
|
$201.250
|
$7,250.000
|
$880.000
|
$200.000
|
|
|
ADJUST STL SHOES
|
EA
|
1.000
|
$5,000.000
|
$17,500.000
|
$15,000.000
|
$20,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$450,000.000
|
$196,000.000
|
$440,000.000
|
$514,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$40,000.000
|
$31,800.000
|
$40,000.000
|
$30,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
400.000
|
$5.190
|
$4.680
|
$4.250
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
400.000
|
$1.730
|
$1.100
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
4,024.000
|
$0.640
|
$2.200
|
$0.380
|
$0.380
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
794.000
|
$0.720
|
$2.200
|
$0.440
|
$0.440
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
4,024.000
|
$0.320
|
$2.200
|
$0.380
|
$0.380
|
|
|
PAVEMENT SEALER 4"
|
LF
|
14,588.000
|
$0.290
|
$0.280
|
$0.400
|
$0.400
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,622.000
|
$0.250
|
$0.550
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,294.000
|
$0.530
|
$0.940
|
$0.650
|
$0.650
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,622.000
|
$1.000
|
$1.380
|
$0.770
|
$0.770
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
7,294.000
|
$0.550
|
$0.880
|
$0.650
|
$0.650
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
161.000
|
$6.100
|
$5.500
|
$3.770
|
$3.770
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
16,210.000
|
$0.850
|
$0.720
|
$0.490
|
$0.490
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
14,588.000
|
$0.250
|
$0.220
|
$0.250
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,622.000
|
$0.250
|
$0.440
|
$0.370
|
$0.370
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
2.000
|
$75.000
|
$13,500.000
|
$4,611.210
|
$1,500.000
|
|
|
REPAIR (ALUMINUM RAIL)
|
LF
|
10.000
|
$150.000
|
$350.000
|
$400.000
|
$250.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
420.000
|
$76.160
|
$86.000
|
$120.000
|
$125.000
|
|
|
CONCRETE RAIL REPAIR (TYPE T502MOD)
|
LF
|
20.000
|
$1,000.000
|
$1,500.000
|
$500.000
|
$125.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
2,258.000
|
$154.000
|
$56.930
|
$35.000
|
$90.000
|
|
|
REP STL BRIDGE MEMBER (BEAM)
|
EA
|
1.000
|
$9,500.000
|
$26,500.000
|
$7,500.000
|
$26,500.000
|
|
|
BRIDGE JOINT REPAIR (CONCRETE)
|
LF
|
80.000
|
$550.000
|
$440.000
|
$350.000
|
$650.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
90.000
|
$586.500
|
$765.000
|
$350.000
|
$600.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
30.000
|
$615.250
|
$385.000
|
$475.000
|
$950.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
6,475.000
|
$62.100
|
$90.000
|
$50.000
|
$97.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
18.000
|
$3,418.720
|
$750.000
|
$15,000.000
|
$800.000
|
|
|
COMPACTION GROUTING
|
CF
|
3,000.000
|
$35.000
|
$6.600
|
$40.000
|
$10.000
|
|
|
DRILLED HOLES
|
LF
|
600.000
|
$75.000
|
$130.900
|
$60.000
|
$125.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,170.840
|
$13,600.000
|
$20,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$160.640
|
$325.000
|
$350.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
12.000
|
$36.500
|
$500.000
|
$150.000
|
$100.000
|
|
Totals: |
$4,817,194.543
|
$4,350,740.310
|
$4,483,873.870
|
$5,144,076.700
|