REMOVING CONC (FOUNDATIONS)
|
CY
|
5.000
|
$342.000
|
$1,050.000
|
$250.000
|
$794.230
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
150.000
|
$174.000
|
$164.350
|
$140.000
|
$152.090
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
50.000
|
$299.000
|
$245.130
|
$180.000
|
$304.520
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
25.000
|
$513.000
|
$312.000
|
$350.000
|
$388.300
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
20.000
|
$339.000
|
$337.850
|
$400.000
|
$422.500
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
25.000
|
$424.000
|
$395.700
|
$450.000
|
$444.120
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
50.000
|
$480.750
|
$486.930
|
$500.000
|
$542.080
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
15.000
|
$559.000
|
$487.500
|
$600.000
|
$985.750
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
15.000
|
$4,170.000
|
$3,437.500
|
$5,500.000
|
$1,530.400
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$24.000
|
$28.030
|
$35.000
|
$39.190
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$859.500
|
$877.500
|
$800.000
|
$2,393.040
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$1,963.000
|
$2,417.500
|
$2,000.000
|
$3,615.520
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
155.000
|
$17.250
|
$11.530
|
$25.000
|
$38.650
|
|
|
MTL THRIE-BEAM GD FEN ADJUSTMENT
|
LF
|
10.000
|
$18.000
|
$33.530
|
$25.000
|
$156.700
|
|
|
TERMINAL ANCHOR SECTION ADJUSTMENT
|
EA
|
2.000
|
$360.000
|
$272.500
|
$140.000
|
$1,196.520
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,217.750
|
$1,262.500
|
$2,000.000
|
$2,907.520
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
26.000
|
$2.900
|
$330.530
|
$10.000
|
$83.720
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$235.000
|
$327.500
|
$450.000
|
$792.490
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
18.000
|
$126.500
|
$327.500
|
$50.000
|
$681.120
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,747.250
|
$3,627.500
|
$3,500.000
|
$4,695.220
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$306.200
|
$602.500
|
$420.000
|
$1,334.820
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
150.000
|
$31.750
|
$38.840
|
$28.000
|
$21.410
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
2,500.000
|
$27.000
|
$25.400
|
$28.000
|
$27.580
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,250.000
|
$25.200
|
$25.930
|
$28.000
|
$43.200
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
100.000
|
$23.750
|
$38.840
|
$28.000
|
$45.160
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
1,000.000
|
$29.000
|
$25.400
|
$28.000
|
$30.430
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
1,550.000
|
$28.000
|
$25.930
|
$28.000
|
$39.970
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$792.250
|
$835.870
|
$810.000
|
$1,203.130
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$707.750
|
$1,097.140
|
$1,200.000
|
$1,222.010
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$924.500
|
$1,159.360
|
$1,300.000
|
$1,348.270
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
8.000
|
$1,107.250
|
$1,227.700
|
$1,400.000
|
$1,390.870
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$2,325.000
|
$1,465.050
|
$1,700.000
|
$1,750.650
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$1,840.500
|
$1,716.750
|
$2,600.000
|
$2,235.510
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,431.750
|
$2,018.750
|
$2,700.000
|
$2,412.510
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$101.750
|
$210.000
|
$120.000
|
$212.650
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
7,502.000
|
$7.000
|
$5.910
|
$6.000
|
$6.210
|
|
|
REMOVE LRSA
|
EA
|
12.000
|
$952.250
|
$840.000
|
$500.000
|
$1,683.860
|
|
|
INS OH SN SUP(15 FT BAL TEE)
|
EA
|
1.000
|
$14,372.000
|
$9,476.650
|
$15,800.000
|
$14,122.240
|
|
|
INS OH SN SUP(20 FT CANT)
|
EA
|
1.000
|
$12,666.750
|
$10,731.300
|
$16,500.000
|
$15,074.260
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$17,523.000
|
$13,371.700
|
$19,500.000
|
$22,557.150
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
1.000
|
$23,043.750
|
$18,754.900
|
$22,500.000
|
$23,574.980
|
|
|
INS OH SN SUP(70 FT BRDG)
|
EA
|
1.000
|
$31,600.000
|
$27,018.100
|
$30,000.000
|
$32,367.400
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
1.000
|
$32,000.000
|
$30,149.600
|
$32,000.000
|
$36,117.440
|
|
|
INS OH SN SUP(90 FT BRDG)
|
EA
|
1.000
|
$34,500.000
|
$35,958.850
|
$34,000.000
|
$40,837.440
|
|
|
INS OH SN SUP(100 FT BRDG)
|
EA
|
1.000
|
$29,700.000
|
$39,572.750
|
$36,000.000
|
$46,807.060
|
|
|
INS OH SN SUP(110 FT BRDG)
|
EA
|
1.000
|
$48,000.000
|
$43,274.050
|
$42,000.000
|
$50,972.460
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$9,740.500
|
$7,320.000
|
$5,000.000
|
$10,399.100
|
|
|
REMOVE SIGN WALKWAY
|
EA
|
3.000
|
$1,119.900
|
$3,150.000
|
$2,000.000
|
$1,957.310
|
|
|
SHIFT OVERHEAD SIGN PANELS
|
EA
|
5.000
|
$1,248.250
|
$1,680.000
|
$1,700.000
|
$1,157.580
|
|
|
REMOVE OVERHEAD SIGN PANELS
|
EA
|
2.000
|
$1,777.500
|
$1,260.000
|
$1,400.000
|
$1,192.390
|
|
|
INST LRG GRND MNT AND OVRHD SIGN(STATE)
|
SF
|
325.000
|
$14.000
|
$20.000
|
$35.000
|
$39.620
|
|
Totals: |
$727,852.050
|
$698,347.640
|
$747,017.000
|
$830,027.760
|