|
|
PREPARING ROW
|
AC
|
13.180
|
$1,000.000
|
$163.560
|
$155.000
|
$200.000
|
$223.360
|
$280.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
45.000
|
$30.000
|
$52.500
|
$54.000
|
$100.000
|
$55.840
|
$62.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
693.000
|
$25.000
|
$38.070
|
$66.500
|
$40.000
|
$47.940
|
$46.500
|
|
|
BACKFILL (TY A)
|
STA
|
574.000
|
$180.000
|
$195.290
|
$200.000
|
$140.000
|
$129.330
|
$300.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
0.180
|
$750.000
|
$10,500.000
|
$1,000.000
|
$1,000.000
|
$11,167.780
|
$11,100.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
13.360
|
$750.000
|
$393.750
|
$410.000
|
$400.000
|
$418.790
|
$425.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
6,492.000
|
$4.000
|
$3.330
|
$4.100
|
$4.000
|
$4.500
|
$4.100
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
|
SY
|
16,342.000
|
$23.000
|
$17.970
|
$22.000
|
$23.000
|
$25.400
|
$20.350
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,600.000
|
$5.000
|
$3.780
|
$4.750
|
$15.000
|
$3.230
|
$5.750
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
18.000
|
$700.000
|
$708.750
|
$770.000
|
$600.000
|
$837.580
|
$670.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
2.000
|
$600.000
|
$1,575.000
|
$1,500.000
|
$2,500.000
|
$1,675.170
|
$4,200.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
190.000
|
$200.000
|
$157.500
|
$155.000
|
$200.000
|
$167.520
|
$160.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$12,600.000
|
$12,500.000
|
$25,000.000
|
$13,401.340
|
$11,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (8: 1) (P)
|
EA
|
18.000
|
$2,500.000
|
$3,255.000
|
$3,200.000
|
$3,500.000
|
$4,076.240
|
$3,750.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$3,000.000
|
$2,377.650
|
$3,100.000
|
$1,500.000
|
$3,401.760
|
$3,700.000
|
|
|
REMOV STR (SET)
|
EA
|
18.000
|
$600.000
|
$525.000
|
$510.000
|
$1,500.000
|
$558.390
|
$550.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,000.000
|
$2,100.000
|
$1,000.000
|
$1,500.000
|
$1,116.780
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
36.000
|
$15.000
|
$21.000
|
$20.500
|
$100.000
|
$22.340
|
$125.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$440,000.000
|
$344,337.760
|
$500,000.000
|
$640,000.000
|
$582,201.620
|
$623,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$15,000.000
|
$8,080.860
|
$18,000.000
|
$14,000.000
|
$25,000.000
|
$20,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
275.000
|
$5.000
|
$4.990
|
$5.100
|
$10.000
|
$5.300
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
275.000
|
$1.500
|
$2.100
|
$2.050
|
$3.000
|
$2.230
|
$5.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
360.000
|
$125.000
|
$150.150
|
$200.000
|
$150.000
|
$558.390
|
$160.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,245.000
|
$35.000
|
$23.580
|
$47.000
|
$50.000
|
$50.840
|
$33.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
39.000
|
$100.000
|
$176.540
|
$155.000
|
$150.000
|
$168.230
|
$200.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
755.000
|
$35.000
|
$31.670
|
$44.000
|
$50.000
|
$27.230
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
114,825.000
|
$0.200
|
$0.160
|
$0.090
|
$0.250
|
$0.170
|
$0.200
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
225.000
|
$40.000
|
$39.380
|
$44.000
|
$44.000
|
$48.020
|
$43.300
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,625.000
|
$3,000.000
|
$2,800.000
|
$3,238.660
|
$3,100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,400.000
|
$1,706.250
|
$1,600.000
|
$1,650.000
|
$1,775.680
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
125.000
|
$5.000
|
$12.600
|
$1.600
|
$3.500
|
$1.730
|
$4.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$300.000
|
$525.000
|
$200.000
|
$350.000
|
$217.770
|
$400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,500.000
|
$3,675.000
|
$3,400.000
|
$3,500.000
|
$3,674.200
|
$3,885.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$330.000
|
$525.000
|
$210.000
|
$350.000
|
$228.940
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$800.000
|
$808.500
|
$670.000
|
$850.000
|
$732.610
|
$945.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
24.000
|
$900.000
|
$1,155.000
|
$1,100.000
|
$1,225.000
|
$1,213.940
|
$1,360.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
87.000
|
$900.000
|
$908.250
|
$765.000
|
$950.000
|
$835.350
|
$1,055.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$1,400.000
|
$997.500
|
$950.000
|
$1,075.000
|
$1,038.600
|
$1,195.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
10.000
|
$1,000.000
|
$1,312.500
|
$1,200.000
|
$1,350.000
|
$1,301.050
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
142.000
|
$130.000
|
$105.000
|
$100.000
|
$100.000
|
$120.030
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$30.000
|
$44.100
|
$13.500
|
$20.000
|
$14.800
|
$22.200
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
20.000
|
$36.000
|
$50.400
|
$33.500
|
$35.000
|
$36.570
|
$38.850
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
265.000
|
$150.000
|
$149.100
|
$84.000
|
$138.000
|
$91.580
|
$153.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
18.000
|
$150.000
|
$149.100
|
$84.000
|
$138.000
|
$91.580
|
$153.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
14,710.000
|
$0.500
|
$1.050
|
$1.000
|
$1.000
|
$1.120
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
385.000
|
$0.500
|
$1.050
|
$1.000
|
$1.000
|
$1.120
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
4,140.000
|
$0.500
|
$1.050
|
$1.000
|
$1.000
|
$1.120
|
$1.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,263.000
|
$1.000
|
$1.660
|
$1.000
|
$1.000
|
$2.230
|
$1.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
325.000
|
$1.000
|
$1.660
|
$1.000
|
$1.000
|
$2.230
|
$1.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
19,460.000
|
$0.750
|
$0.950
|
$0.920
|
$0.900
|
$1.010
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
243.000
|
$10.000
|
$15.750
|
$15.500
|
$15.000
|
$16.750
|
$16.650
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
72.000
|
$150.000
|
$157.500
|
$155.000
|
$150.000
|
$167.520
|
$166.500
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
72.000
|
$150.000
|
$210.000
|
$205.000
|
$200.000
|
$223.360
|
$222.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
215.000
|
$24.000
|
$42.000
|
$41.000
|
$40.000
|
$44.670
|
$44.400
|
|
REFL PAV MRKR TY I-A
|
EA
|
100.000
|
$3.000
|
$10.500
|
$10.000
|
$10.000
|
$11.170
|
$11.100
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,115.000
|
$3.000
|
$4.200
|
$4.100
|
$4.000
|
$4.470
|
$4.450
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
175.000
|
$3.000
|
$10.500
|
$10.000
|
$10.000
|
$11.170
|
$11.100
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
600.000
|
$6.000
|
$5.250
|
$5.100
|
$5.000
|
$5.580
|
$5.550
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
32,707.000
|
$115.000
|
$105.100
|
$111.700
|
$114.250
|
$115.230
|
$116.400
|
|
|
UNDERSEAL COURSE
|
GAL
|
74,336.000
|
$4.300
|
$2.800
|
$3.800
|
$4.000
|
$2.510
|
$2.850
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,000.000
|
$8,542.680
|
$7,700.000
|
$15,500.000
|
$18,000.000
|
$22,000.000
|
|
|
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
|
LF
|
15,915.000
|
$0.500
|
$0.480
|
$0.470
|
$0.460
|
$0.510
|
$0.500
|
|
|
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
|
LF
|
57,515.000
|
$0.400
|
$0.470
|
$0.460
|
$0.450
|
$0.500
|
$0.500
|
|
|
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
|
LF
|
385.000
|
$0.500
|
$1.050
|
$1.000
|
$1.000
|
$1.120
|
$1.100
|
|
|
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
|
LF
|
55,680.000
|
$0.400
|
$0.470
|
$0.460
|
$0.450
|
$0.500
|
$0.500
|
|
|
TMA (STATIONARY)
|
DAY
|
81.000
|
$300.000
|
$362.950
|
$255.000
|
$425.000
|
$296.840
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
240.000
|
$80.000
|
$96.970
|
$92.000
|
$95.000
|
$77.810
|
$95.000
|
|
Totals: |
$5,883,459.800
|
$5,275,866.951
|
$5,874,710.350
|
$6,220,396.150
|
$6,238,622.980
|
$6,250,418.350
|