|
|
PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
177.000
|
$500.000
|
$200.000
|
$625.000
|
$357.500
|
$350.000
|
|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
78.000
|
$850.000
|
$455.000
|
$1,600.000
|
$412.500
|
$1,400.000
|
|
|
REMOVING STAB BASE & ASPH PAV (18")
|
SY
|
19,877.000
|
$12.000
|
$11.000
|
$10.000
|
$11.050
|
$15.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
228.000
|
$800.000
|
$2,000.000
|
$1,500.000
|
$1,202.550
|
$1,090.000
|
|
|
BLADING
|
HR
|
4.000
|
$200.000
|
$300.000
|
$145.000
|
$194.670
|
$395.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
6.000
|
$1,000.000
|
$550.000
|
$575.000
|
$605.000
|
$580.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
6.000
|
$850.000
|
$500.000
|
$520.000
|
$550.000
|
$530.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(12")
|
SY
|
41,072.000
|
$18.000
|
$22.000
|
$20.500
|
$31.260
|
$21.700
|
|
|
CEMENT
|
TON
|
453.000
|
$220.000
|
$180.000
|
$210.000
|
$197.810
|
$211.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
41,072.000
|
$4.000
|
$4.000
|
$4.250
|
$4.380
|
$5.950
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,274.000
|
$5.000
|
$5.000
|
$4.050
|
$5.040
|
$5.550
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
2,666.000
|
$5.000
|
$5.000
|
$3.650
|
$4.210
|
$4.250
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
15,620.000
|
$5.000
|
$4.500
|
$3.800
|
$3.980
|
$5.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
390.000
|
$160.000
|
$205.000
|
$115.000
|
$410.630
|
$280.000
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
2,941.000
|
$10.000
|
$19.000
|
$13.500
|
$10.900
|
$19.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
6.000
|
$150.000
|
$320.000
|
$210.000
|
$442.120
|
$205.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
639.000
|
$150.000
|
$185.000
|
$365.000
|
$258.270
|
$250.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
1.000
|
$4,500.000
|
$9,400.000
|
$5,200.000
|
$11,673.410
|
$6,570.000
|
|
|
SET (TY II) (DES 3) (RCP) (8:1) (P)
|
EA
|
12.000
|
$4,500.000
|
$5,500.000
|
$3,100.000
|
$4,888.900
|
$4,600.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
1.000
|
$2,000.000
|
$3,200.000
|
$2,100.000
|
$4,678.320
|
$3,400.000
|
|
|
REMOV STR (SET)
|
EA
|
14.000
|
$1,000.000
|
$460.000
|
$415.000
|
$1,331.670
|
$700.000
|
|
|
REMOV STR (PIPE)
|
LF
|
419.000
|
$30.000
|
$16.000
|
$21.000
|
$23.560
|
$22.250
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$330,000.000
|
$500,000.000
|
$430,000.000
|
$443,126.820
|
$620,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$15,000.000
|
$12,500.000
|
$24,000.000
|
$5,532.120
|
$22,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
600.000
|
$6.000
|
$11.000
|
$3.150
|
$8.800
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
600.000
|
$2.000
|
$3.000
|
$1.050
|
$1.650
|
$4.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,675.000
|
$30.000
|
$31.000
|
$32.500
|
$36.760
|
$35.650
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$3,000.000
|
$1,650.000
|
$1,700.000
|
$1,956.690
|
$1,665.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
3.000
|
$1,000.000
|
$1,350.000
|
$1,400.000
|
$1,600.930
|
$1,750.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,450.000
|
$5.000
|
$4.000
|
$4.150
|
$4.740
|
$3.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$450.000
|
$300.000
|
$315.000
|
$355.760
|
$320.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$300.000
|
$300.000
|
$315.000
|
$355.760
|
$320.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,000.000
|
$2,995.000
|
$3,100.000
|
$3,551.680
|
$3,650.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$800.000
|
$500.000
|
$520.000
|
$592.940
|
$320.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$900.000
|
$580.000
|
$605.000
|
$757.900
|
$925.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
91.000
|
$1,000.000
|
$920.000
|
$960.000
|
$1,024.100
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
182.000
|
$1,000.000
|
$730.000
|
$760.000
|
$789.800
|
$975.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
32.000
|
$1,000.000
|
$980.000
|
$1,000.000
|
$1,257.300
|
$1,345.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
279.000
|
$100.000
|
$90.000
|
$94.000
|
$220.000
|
$105.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
31.000
|
$40.000
|
$34.000
|
$35.500
|
$40.320
|
$40.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
24.000
|
$120.000
|
$110.000
|
$115.000
|
$129.800
|
$165.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
240.000
|
$120.000
|
$110.000
|
$115.000
|
$129.800
|
$165.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
10.000
|
$125.000
|
$110.000
|
$115.000
|
$129.800
|
$165.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
22,800.000
|
$0.300
|
$0.650
|
$0.680
|
$0.240
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
19,920.000
|
$1.000
|
$0.660
|
$0.690
|
$0.500
|
$0.700
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
48.000
|
$160.000
|
$130.000
|
$135.000
|
$121.000
|
$137.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
48.000
|
$250.000
|
$175.000
|
$180.000
|
$137.500
|
$185.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
|
EA
|
480.000
|
$25.000
|
$25.000
|
$26.000
|
$38.500
|
$26.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,970.000
|
$3.500
|
$3.350
|
$3.500
|
$4.240
|
$3.550
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
13,690.000
|
$155.000
|
$135.000
|
$133.500
|
$140.550
|
$134.750
|
|
|
TACK COAT
|
GAL
|
5,403.000
|
$5.500
|
$4.000
|
$2.800
|
$10.060
|
$4.650
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$15,000.000
|
$10,500.000
|
$10,024.870
|
$19,500.000
|
|
|
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
|
LF
|
59,150.000
|
$0.400
|
$0.370
|
$0.390
|
$0.400
|
$0.390
|
|
|
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
|
LF
|
236,600.000
|
$0.400
|
$0.340
|
$0.350
|
$0.400
|
$0.360
|
|
|
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
|
LF
|
236,600.000
|
$0.400
|
$0.350
|
$0.360
|
$0.400
|
$0.370
|
|
|
TMA (STATIONARY)
|
DAY
|
161.000
|
$350.000
|
$150.000
|
$155.000
|
$408.890
|
$470.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
$85.000
|
$40.000
|
$94.000
|
$109.250
|
$85.000
|
|
Totals: |
$5,551,659.500
|
$5,647,434.200
|
$5,696,884.300
|
$6,135,468.640
|
$6,200,746.950
|