REMOVING CONC (RIPRAP)
|
SY
|
6.000
|
$80.000
|
$40.000
|
$525.000
|
$100.000
|
$300.000
|
$100.000
|
$100.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
5,670.000
|
$25.000
|
$15.000
|
$14.000
|
$14.000
|
$11.000
|
$10.000
|
$10.000
|
|
|
REMOVING CONC (SAWCUT)
|
LF
|
80.000
|
$71.330
|
$50.000
|
$78.000
|
$40.000
|
$60.000
|
$75.000
|
$100.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,231.000
|
$32.000
|
$60.000
|
$46.000
|
$35.000
|
$50.000
|
$30.000
|
$32.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
119.000
|
$0.600
|
$1.000
|
$3.000
|
$0.650
|
$5.500
|
$10.000
|
$6.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
119.000
|
$0.600
|
$1.000
|
$3.000
|
$0.650
|
$5.500
|
$10.000
|
$6.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
237.000
|
$1.800
|
$1.000
|
$3.000
|
$0.650
|
$4.400
|
$10.000
|
$10.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2.000
|
$250.000
|
$1,000.000
|
$300.000
|
$0.010
|
$250.000
|
$1,000.000
|
$1,000.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 6")
|
SY
|
29,344.000
|
$7.000
|
$6.000
|
$8.250
|
$7.000
|
$6.000
|
$5.500
|
$8.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
48.000
|
$350.000
|
$300.000
|
$200.000
|
$350.000
|
$450.000
|
$350.000
|
$500.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
1,881.000
|
$148.330
|
$150.000
|
$150.000
|
$158.520
|
$195.000
|
$300.000
|
$125.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
330.000
|
$368.330
|
$50.000
|
$60.000
|
$150.000
|
$170.000
|
$45.000
|
$50.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
420.000
|
$443.000
|
$500.000
|
$325.000
|
$450.000
|
$295.000
|
$250.000
|
$400.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
11.200
|
$750.000
|
$1,000.000
|
$1,600.000
|
$1,530.000
|
$1,000.000
|
$1,200.000
|
$1,500.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
16.000
|
$250.000
|
$300.000
|
$385.000
|
$236.000
|
$500.000
|
$750.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
3.000
|
$640.000
|
$600.000
|
$2,500.000
|
$850.000
|
$2,000.000
|
$1,000.000
|
$2,500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
10.000
|
$500.000
|
$300.000
|
$750.000
|
$550.000
|
$400.000
|
$200.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
333.000
|
$560.000
|
$600.000
|
$635.000
|
$450.000
|
$800.000
|
$550.000
|
$800.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
3,294.000
|
$55.000
|
$50.000
|
$48.000
|
$52.000
|
$46.000
|
$55.000
|
$50.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
1,070.000
|
$55.000
|
$50.000
|
$48.000
|
$57.000
|
$66.000
|
$75.000
|
$70.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
720.000
|
$260.000
|
$140.000
|
$156.000
|
$190.000
|
$165.000
|
$250.000
|
$250.000
|
|
|
RETROFIT RAIL (ADD HSS)
|
LF
|
3,187.000
|
$170.000
|
$130.000
|
$130.000
|
$152.500
|
$170.000
|
$180.000
|
$145.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
20.000
|
$400.000
|
$500.000
|
$740.000
|
$918.000
|
$950.000
|
$750.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
306.000
|
$48.000
|
$70.000
|
$59.000
|
$76.000
|
$65.000
|
$55.000
|
$60.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
2,933.000
|
$47.000
|
$80.000
|
$65.000
|
$79.000
|
$75.000
|
$55.000
|
$65.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,214.000
|
$53.000
|
$100.000
|
$70.000
|
$109.880
|
$75.000
|
$55.000
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,207.000
|
$82.500
|
$100.000
|
$90.000
|
$142.360
|
$100.000
|
$75.000
|
$100.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
50.000
|
$180.000
|
$230.000
|
$185.000
|
$227.380
|
$200.000
|
$150.000
|
$200.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 3)
|
EA
|
1.000
|
$6,000.000
|
$5,000.000
|
$10,000.000
|
$4,000.000
|
$8,000.000
|
$9,000.000
|
$10,000.000
|
|
|
WINGWALL (FW - S) (HW=3 FT)
|
EA
|
2.000
|
$6,000.000
|
$5,000.000
|
$8,500.000
|
$9,163.620
|
$10,000.000
|
$8,000.000
|
$12,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
1.000
|
$7,000.000
|
$5,000.000
|
$10,000.000
|
$9,017.200
|
$10,000.000
|
$18,000.000
|
$7,500.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$400.000
|
$800.000
|
$700.000
|
$845.000
|
$1,100.000
|
$750.000
|
$1,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
196.000
|
$550.000
|
$1,000.000
|
$730.000
|
$1,091.440
|
$1,200.000
|
$800.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
83.000
|
$800.000
|
$1,000.000
|
$925.000
|
$1,618.440
|
$1,300.000
|
$950.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$1,400.000
|
$2,000.000
|
$1,385.000
|
$2,106.440
|
$1,700.000
|
$1,250.000
|
$1,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$6,400.000
|
$6,000.000
|
$5,800.000
|
$6,000.000
|
$6,000.000
|
$4,500.000
|
$8,000.000
|
|
|
SET (TY II) (42 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$6,500.000
|
$5,000.000
|
$9,500.000
|
$6,000.000
|
$8,500.000
|
$12,000.000
|
$12,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,000.000
|
$5,000.000
|
$3,200.000
|
$3,689.800
|
$5,000.000
|
$2,000.000
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
367.000
|
$200.000
|
$100.000
|
$420.000
|
$200.000
|
$725.000
|
$500.000
|
$600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$2,125.000
|
$2,061.260
|
$2,000.000
|
$500.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
5,710.000
|
$12.000
|
$20.000
|
$16.000
|
$16.000
|
$30.000
|
$50.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$432,682.350
|
$400,000.000
|
$288,000.000
|
$200,000.000
|
$400,000.000
|
$400,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$7,500.000
|
$4,000.000
|
$7,500.000
|
$5,000.000
|
$6,500.000
|
$5,000.000
|
$20,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,900.000
|
$4.000
|
$4.000
|
$5.000
|
$3.500
|
$5.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,900.000
|
$1.000
|
$2.000
|
$0.350
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
1,000.000
|
$23.000
|
$15.000
|
$30.000
|
$23.210
|
$20.000
|
$100.000
|
$25.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,000.000
|
$15.000
|
$15.000
|
$22.000
|
$14.090
|
$9.000
|
$25.000
|
$12.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,000.000
|
$23.000
|
$15.000
|
$26.000
|
$17.870
|
$17.000
|
$25.000
|
$20.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
4,675.000
|
$29.000
|
$40.000
|
$27.500
|
$27.000
|
$29.000
|
$31.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
26.000
|
$2,200.000
|
$2,500.000
|
$2,100.000
|
$2,328.660
|
$2,200.000
|
$3,100.000
|
$2,300.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
26.000
|
$850.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$250.000
|
$1,050.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,695.000
|
$5.000
|
$2.000
|
$2.250
|
$1.000
|
$2.200
|
$2.000
|
$2.500
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
6.000
|
$200.000
|
$500.000
|
$180.000
|
$150.000
|
$165.000
|
$250.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
25.000
|
$3,100.000
|
$3,000.000
|
$2,900.000
|
$2,750.000
|
$3,025.000
|
$2,950.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
32.000
|
$300.000
|
$500.000
|
$240.000
|
$150.000
|
$220.000
|
$350.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$2,400.000
|
$2,206.810
|
$2,200.000
|
$1,500.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$550.000
|
$1,000.000
|
$960.000
|
$1,385.800
|
$900.000
|
$1,500.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$3,000.000
|
$10,000.000
|
$12,000.000
|
$10,188.580
|
$9,600.000
|
$8,500.000
|
$10,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
113.000
|
$36.350
|
$50.000
|
$30.000
|
$42.100
|
$28.000
|
$35.000
|
$35.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
1,727.000
|
$2.000
|
$2.000
|
$1.800
|
$1.500
|
$1.650
|
$1.500
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
6,500.000
|
$2.000
|
$2.000
|
$1.440
|
$1.500
|
$1.321
|
$1.200
|
$1.650
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
6,900.000
|
$2.000
|
$2.000
|
$1.440
|
$1.500
|
$1.320
|
$1.200
|
$1.650
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
87.000
|
$10.000
|
$10.000
|
$12.000
|
$30.000
|
$11.000
|
$10.000
|
$12.000
|
|
|
D-GR HMA TY-C SAC-A PG64-22(EXEMPT)
|
TON
|
3,233.000
|
$220.000
|
$150.000
|
$198.000
|
$250.000
|
$135.000
|
$189.000
|
$195.000
|
|
|
BONDING COURSE
|
GAL
|
2,353.000
|
$10.000
|
$10.000
|
$8.500
|
$25.000
|
$6.500
|
$7.900
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$16,500.000
|
$1,000.000
|
$18,000.000
|
$8,000.000
|
$20,000.000
|
$15,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
77.000
|
$150.000
|
$300.000
|
$350.000
|
$75.000
|
$250.000
|
$250.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
38.000
|
$80.000
|
$300.000
|
$350.000
|
$75.000
|
$300.000
|
$1,000.000
|
$300.000
|
|
Totals: |
$4,767,505.830
|
$4,447,953.000
|
$4,493,154.350
|
$4,808,250.140
|
$4,989,478.350
|
$5,176,818.200
|
$5,255,552.500
|