|
|
BACKFILL (TY A OR B)
|
STA
|
304.320
|
$170.000
|
$180.000
|
$205.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
2,414.000
|
$0.300
|
$1.050
|
$2.310
|
|
|
VEGETATIVE WATERING
|
MG
|
210.000
|
$2.900
|
$28.550
|
$93.300
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
7,582.000
|
$4.100
|
$2.850
|
$3.890
|
|
|
ASPH (CRS-2P)
|
GAL
|
18,955.000
|
$4.100
|
$5.100
|
$3.450
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
15,922.000
|
$4.100
|
$5.950
|
$3.450
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
361.000
|
$3.900
|
$840.000
|
$185.510
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
8,237.000
|
$135.000
|
$145.000
|
$103.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
|
SY
|
37,910.000
|
$60.000
|
$42.450
|
$91.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(15")
|
SY
|
200.000
|
$210.000
|
$360.000
|
$144.000
|
|
|
PLAN & TEXT ASPH CONC PAV (2")
|
SY
|
164,664.000
|
$1.250
|
$2.080
|
$2.350
|
|
|
FULL-DEPTH REPAIR CPCD (9") HES
|
SY
|
200.000
|
$160.000
|
$400.000
|
$440.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,118.700
|
$578,500.000
|
$412,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$13,500.000
|
$1,500.000
|
$5,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
250.000
|
$7.000
|
$5.300
|
$7.920
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
250.000
|
$2.000
|
$1.150
|
$3.080
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
60,054.000
|
$1.200
|
$0.200
|
$0.130
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
12,880.000
|
$0.200
|
$0.200
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,690.000
|
$0.600
|
$0.500
|
$0.660
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
23,514.000
|
$0.300
|
$0.450
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,200.000
|
$0.500
|
$1.150
|
$0.890
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
|
LF
|
535.000
|
$2.500
|
$4.850
|
$1.860
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
911.000
|
$4.000
|
$4.300
|
$3.980
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,290.000
|
$0.400
|
$0.500
|
$0.660
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
23,356.000
|
$0.350
|
$0.450
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,450.000
|
$1.000
|
$2.100
|
$0.930
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,603.000
|
$0.500
|
$1.250
|
$0.940
|
|
REFL PAV MRKR TY I-C
|
EA
|
87.000
|
$3.500
|
$5.150
|
$5.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
279.000
|
$2.750
|
$5.150
|
$4.240
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
445.000
|
$5.100
|
$5.150
|
$4.240
|
|
|
SPOT MOWING
|
AC
|
20.000
|
$100.000
|
$115.000
|
$106.010
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
14,256.000
|
$1.200
|
$3.250
|
$3.360
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
9,876.000
|
$95.000
|
$113.750
|
$81.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$11,300.000
|
$11,500.000
|
$9,250.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
48,564.000
|
$0.600
|
$0.680
|
$0.530
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
3,690.000
|
$1.300
|
$0.990
|
$0.690
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
3,721.000
|
$1.050
|
$1.450
|
$1.050
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
911.000
|
$3.650
|
$4.600
|
$4.240
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
535.000
|
$1.700
|
$4.000
|
$4.240
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
23,356.000
|
$0.550
|
$0.700
|
$0.530
|
|
MULTIPOLYMER PAV MRK (Y)(4")(BRK)
|
LF
|
3,290.000
|
$0.550
|
$0.850
|
$0.530
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
437.000
|
$5.600
|
$4.600
|
$4.240
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
8.000
|
$185.000
|
$165.000
|
$190.810
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
8.000
|
$220.000
|
$200.000
|
$259.710
|
|
|
TMA (STATIONARY)
|
DAY
|
307.000
|
$90.000
|
$220.000
|
$262.790
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$45.000
|
$15.000
|
$221.870
|
|
Totals: |
$5,811,601.750
|
$5,910,402.340
|
$6,696,810.580
|