|
|
PREPARING ROW
|
STA
|
15.500
|
$15,000.000
|
$17,250.000
|
$6,200.000
|
$3,447.570
|
$5,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
313.000
|
$7.000
|
$21.000
|
$42.000
|
$27.060
|
$29.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
3,245.000
|
$9.000
|
$9.900
|
$16.000
|
$11.780
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,604.000
|
$13.000
|
$10.000
|
$35.000
|
$30.760
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
14,625.000
|
$20.000
|
$25.000
|
$34.000
|
$30.730
|
$37.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
19,411.000
|
$2.000
|
$2.250
|
$1.800
|
$2.250
|
$2.500
|
|
|
BLOCK SODDING
|
SY
|
19,411.000
|
$4.000
|
$4.010
|
$4.000
|
$5.490
|
$6.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
19,411.000
|
$0.350
|
$0.270
|
$0.300
|
$0.400
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
5,776.000
|
$10.000
|
$3.060
|
$18.000
|
$25.000
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
4,580.000
|
$20.000
|
$36.000
|
$29.000
|
$27.790
|
$40.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
916.000
|
$5.000
|
$13.380
|
$14.000
|
$14.750
|
$2.500
|
|
|
ASPH (CRS-2P)
|
GAL
|
2,290.000
|
$9.000
|
$7.010
|
$7.000
|
$7.730
|
$7.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
2,290.000
|
$10.000
|
$8.610
|
$9.000
|
$9.500
|
$8.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
88.000
|
$300.000
|
$502.900
|
$500.000
|
$554.600
|
$600.000
|
|
|
CEM STABIL BKFL
|
CY
|
196.000
|
$150.000
|
$325.000
|
$250.000
|
$196.190
|
$240.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
470.000
|
$35.000
|
$85.360
|
$25.000
|
$100.430
|
$52.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
166.000
|
$130.000
|
$175.000
|
$135.000
|
$230.700
|
$140.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
882.000
|
$260.000
|
$300.000
|
$245.000
|
$318.290
|
$260.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
64.900
|
$1,350.000
|
$2,500.000
|
$1,100.000
|
$1,566.990
|
$2,200.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
86.800
|
$1,300.000
|
$1,900.000
|
$1,400.000
|
$2,036.990
|
$2,700.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
79.600
|
$1,250.000
|
$1,600.000
|
$1,400.000
|
$2,404.100
|
$1,900.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
18,130.000
|
$25.000
|
$27.000
|
$27.000
|
$31.280
|
$40.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
75.400
|
$630.000
|
$800.000
|
$670.000
|
$855.630
|
$1,600.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
2,572.500
|
$225.000
|
$220.000
|
$180.000
|
$244.490
|
$330.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
1,412.000
|
$140.000
|
$175.000
|
$175.000
|
$179.010
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
25.000
|
$550.000
|
$600.000
|
$1,000.000
|
$792.510
|
$1,100.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
808.000
|
$150.000
|
$150.000
|
$180.000
|
$146.640
|
$210.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
144.000
|
$130.000
|
$125.000
|
$145.000
|
$152.440
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
84.000
|
$86.000
|
$111.000
|
$140.000
|
$151.330
|
$150.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$999.000
|
$3,000.000
|
$1,887.930
|
$2,300.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$125,000.000
|
$100,000.000
|
$150,780.000
|
$200,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$375,743.350
|
$468,000.000
|
$470,950.870
|
$517,115.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$15,750.000
|
$9,000.000
|
$3,905.990
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$30.000
|
$42.600
|
$34.000
|
$48.200
|
$47.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$13.000
|
$21.300
|
$12.000
|
$29.500
|
$15.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
164.000
|
$22.000
|
$27.690
|
$32.000
|
$51.090
|
$46.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
164.000
|
$8.000
|
$13.850
|
$9.000
|
$29.500
|
$11.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,230.000
|
$3.000
|
$2.400
|
$3.000
|
$3.480
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,230.000
|
$0.650
|
$0.530
|
$1.000
|
$1.480
|
$0.950
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,854.000
|
$5.000
|
$4.260
|
$5.000
|
$5.840
|
$5.900
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,854.000
|
$1.000
|
$1.070
|
$1.000
|
$1.360
|
$0.950
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,006.000
|
$65.000
|
$101.570
|
$140.000
|
$58.260
|
$150.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
10.000
|
$5,000.000
|
$3,150.000
|
$3,500.000
|
$5,900.000
|
$6,500.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,010.000
|
$50.000
|
$21.000
|
$50.000
|
$55.970
|
$24.250
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,950.000
|
$15.000
|
$4.200
|
$9.000
|
$11.380
|
$9.600
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,010.000
|
$14.000
|
$7.350
|
$18.000
|
$26.210
|
$21.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
290.000
|
$65.000
|
$86.760
|
$180.000
|
$89.680
|
$74.000
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
14.000
|
$160.000
|
$525.000
|
$250.000
|
$106.200
|
$680.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
275.000
|
$25.000
|
$22.370
|
$30.000
|
$23.300
|
$32.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,110.000
|
$2,875.370
|
$2,200.000
|
$2,094.500
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.000
|
$1.070
|
$5.000
|
$3.540
|
$4.800
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$2,955.380
|
$3,500.000
|
$3,186.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$270.000
|
$239.630
|
$300.000
|
$1,180.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$1,364.780
|
$1,200.000
|
$1,180.000
|
$1,700.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,200.000
|
$682.390
|
$1,000.000
|
$1,003.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$10,000.000
|
$11,195.820
|
$10,000.000
|
$8,555.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$700.000
|
$647.520
|
$700.000
|
$1,174.100
|
$740.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,100.000
|
$967.020
|
$1,000.000
|
$1,296.820
|
$980.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,500.000
|
$1,244.990
|
$1,200.000
|
$2,000.110
|
$1,400.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$15.980
|
$18.000
|
$40.120
|
$23.750
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
12.000
|
$28.000
|
$21.300
|
$24.000
|
$40.120
|
$29.750
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,374.000
|
$0.900
|
$1.640
|
$2.500
|
$2.360
|
$2.400
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
44.000
|
$10.000
|
$16.960
|
$25.000
|
$23.600
|
$23.750
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,640.000
|
$0.200
|
$0.570
|
$1.000
|
$1.180
|
$1.200
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
4,300.000
|
$1.000
|
$2.490
|
$1.800
|
$1.770
|
$1.800
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
4,300.000
|
$1.000
|
$2.490
|
$1.800
|
$1.770
|
$1.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
54.000
|
$4.000
|
$16.960
|
$23.000
|
$23.600
|
$23.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,400.000
|
$0.600
|
$2.540
|
$1.000
|
$1.180
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,640.000
|
$0.300
|
$1.130
|
$1.000
|
$1.180
|
$1.200
|
|
|
FULL - WIDTH MOWING
|
AC
|
12.000
|
$220.000
|
$375.000
|
$4,100.000
|
$3,068.000
|
$310.000
|
|
|
LITTER REMOVAL
|
AC
|
4.000
|
$75.000
|
$1,000.000
|
$1,800.000
|
$5,439.160
|
$320.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
756.000
|
$140.000
|
$162.640
|
$188.000
|
$179.360
|
$120.000
|
|
|
TACK COAT
|
GAL
|
275.000
|
$4.000
|
$3.210
|
$4.000
|
$3.540
|
$2.000
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
|
LF
|
800.000
|
$5.000
|
$2.410
|
$4.000
|
$4.600
|
$4.600
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
|
LF
|
800.000
|
$1.500
|
$0.540
|
$1.600
|
$1.200
|
$1.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$8,500.000
|
$43,000.000
|
$28,320.000
|
$13,300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
12.000
|
$130.000
|
$315.000
|
$235.000
|
$466.100
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
1.000
|
$225.000
|
$735.000
|
$1,200.000
|
$938.110
|
$1,500.000
|
|
Totals: |
$4,133,176.800
|
$4,788,222.290
|
$4,825,268.970
|
$5,254,514.185
|
$5,755,126.900
|