PREPARING ROW
|
STA
|
17.120
|
$3,000.000
|
$5,000.000
|
$23,780.000
|
$10,625.000
|
$4,000.000
|
$13,923.000
|
$5,500.000
|
$5,000.000
|
$20,210.000
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-20")
|
SY
|
4,220.000
|
$12.000
|
$6.500
|
$8.000
|
$10.000
|
$10.000
|
$11.800
|
$10.200
|
$18.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,763.000
|
$12.000
|
$9.500
|
$7.000
|
$15.000
|
$38.000
|
$15.400
|
$20.000
|
$36.000
|
$23.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
12,171.000
|
$11.000
|
$14.250
|
$15.000
|
$20.000
|
$50.000
|
$19.600
|
$14.000
|
$35.000
|
$39.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
386.000
|
$20.000
|
$22.500
|
$50.000
|
$50.000
|
$44.000
|
$32.800
|
$32.000
|
$38.000
|
$150.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
17,725.000
|
$2.000
|
$0.850
|
$2.200
|
$0.840
|
$1.000
|
$2.260
|
$1.600
|
$1.400
|
$2.750
|
|
|
BLOCK SODDING
|
SY
|
17,725.000
|
$3.750
|
$3.000
|
$3.500
|
$3.150
|
$4.000
|
$2.830
|
$4.000
|
$3.000
|
$2.830
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
19,747.000
|
$0.120
|
$0.150
|
$0.200
|
$0.060
|
$0.250
|
$0.140
|
$0.240
|
$0.180
|
$0.140
|
|
|
VEGETATIVE WATERING
|
MG
|
5,573.000
|
$10.000
|
$18.000
|
$12.500
|
$1.050
|
$0.010
|
$22.770
|
$14.000
|
$14.000
|
$0.100
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(15")
|
SY
|
6,590.000
|
$28.000
|
$36.000
|
$26.000
|
$42.000
|
$40.000
|
$42.000
|
$40.000
|
$48.000
|
$55.500
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
1,318.000
|
$5.000
|
$14.600
|
$3.700
|
$18.000
|
$15.000
|
$13.500
|
$9.000
|
$4.000
|
$13.500
|
|
|
ASPH (CRS-2P)
|
GAL
|
1,648.000
|
$4.000
|
$8.000
|
$8.300
|
$7.350
|
$8.000
|
$7.000
|
$11.500
|
$10.000
|
$7.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
1,386.000
|
$4.000
|
$10.000
|
$10.400
|
$9.450
|
$10.000
|
$9.000
|
$14.850
|
$12.000
|
$9.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
63.000
|
$145.000
|
$645.000
|
$692.000
|
$630.000
|
$660.000
|
$600.000
|
$957.000
|
$770.000
|
$600.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,422.000
|
$30.000
|
$15.000
|
$45.000
|
$31.500
|
$20.000
|
$17.800
|
$50.000
|
$18.000
|
$40.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
488.000
|
$180.000
|
$166.000
|
$160.000
|
$185.000
|
$200.000
|
$153.760
|
$240.000
|
$250.000
|
$150.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
520.000
|
$200.000
|
$237.000
|
$225.000
|
$275.000
|
$250.000
|
$228.170
|
$340.000
|
$300.000
|
$250.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
82.400
|
$1,000.000
|
$1,250.000
|
$1,000.000
|
$2,430.000
|
$1,500.000
|
$1,600.000
|
$2,000.000
|
$1,100.000
|
$2,775.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
63.600
|
$1,000.000
|
$1,445.000
|
$1,300.000
|
$2,190.000
|
$1,500.000
|
$1,800.000
|
$3,000.000
|
$1,700.000
|
$2,775.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
10.200
|
$1,000.000
|
$1,250.000
|
$1,900.000
|
$4,235.000
|
$2,500.000
|
$2,330.000
|
$2,800.000
|
$2,600.000
|
$3,700.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
15,243.000
|
$20.000
|
$24.000
|
$19.000
|
$30.000
|
$21.000
|
$28.600
|
$28.000
|
$18.000
|
$29.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
145.000
|
$450.000
|
$550.000
|
$625.000
|
$735.000
|
$900.000
|
$682.000
|
$1,100.000
|
$800.000
|
$650.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
267.000
|
$191.000
|
$342.000
|
$250.000
|
$250.000
|
$210.000
|
$283.000
|
$340.000
|
$400.000
|
$280.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
1,068.000
|
$180.000
|
$226.000
|
$225.000
|
$250.000
|
$210.000
|
$270.000
|
$340.000
|
$400.000
|
$260.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,131.000
|
$180.000
|
$226.000
|
$230.000
|
$260.000
|
$185.000
|
$340.000
|
$360.000
|
$200.000
|
$230.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
1,215.000
|
$130.000
|
$124.000
|
$115.000
|
$95.000
|
$145.000
|
$116.000
|
$94.000
|
$110.000
|
$105.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2,005.000
|
$120.000
|
$150.000
|
$115.000
|
$95.000
|
$145.000
|
$117.000
|
$120.000
|
$194.000
|
$105.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
76.400
|
$500.000
|
$565.000
|
$650.000
|
$735.000
|
$650.000
|
$668.000
|
$750.000
|
$700.000
|
$500.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
722.000
|
$115.000
|
$170.000
|
$125.000
|
$125.000
|
$130.000
|
$208.000
|
$250.000
|
$200.000
|
$250.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
186.000
|
$70.000
|
$126.000
|
$105.000
|
$110.000
|
$125.000
|
$160.000
|
$120.000
|
$164.000
|
$150.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$14,000.000
|
$35,000.000
|
$30,000.000
|
$33,000.000
|
$20,000.000
|
$29,000.000
|
$55,000.000
|
$60,000.000
|
$50,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$51,000.000
|
$45,000.000
|
$40,000.000
|
$66,000.000
|
$30,000.000
|
$22,000.000
|
$97,000.000
|
$96,000.000
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$307,807.000
|
$200,000.000
|
$443,100.000
|
$450,000.000
|
$490,000.000
|
$490,000.000
|
$330,000.000
|
$577,382.730
|
$620,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$4,000.000
|
$4,150.000
|
$4,500.000
|
$5,250.000
|
$3,500.000
|
$7,500.000
|
$6,397.000
|
$12,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
180.000
|
$30.000
|
$31.000
|
$37.000
|
$30.000
|
$30.000
|
$27.840
|
$45.000
|
$40.600
|
$36.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
180.000
|
$10.000
|
$11.000
|
$12.000
|
$15.000
|
$11.000
|
$9.180
|
$25.000
|
$10.000
|
$5.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
932.000
|
$22.000
|
$27.000
|
$18.000
|
$10.500
|
$26.000
|
$24.840
|
$19.000
|
$38.000
|
$17.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
932.000
|
$7.000
|
$7.000
|
$12.000
|
$5.500
|
$7.000
|
$6.190
|
$13.000
|
$7.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,555.000
|
$2.000
|
$3.000
|
$1.700
|
$2.000
|
$4.000
|
$3.620
|
$2.000
|
$3.000
|
$1.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,555.000
|
$0.650
|
$0.550
|
$0.450
|
$0.250
|
$1.000
|
$0.450
|
$0.500
|
$0.500
|
$0.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
168.000
|
$5.000
|
$6.000
|
$4.500
|
$5.250
|
$7.000
|
$4.800
|
$8.000
|
$8.000
|
$4.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
168.000
|
$1.500
|
$2.500
|
$1.000
|
$1.050
|
$3.000
|
$1.340
|
$4.000
|
$2.000
|
$0.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,168.000
|
$50.000
|
$65.000
|
$50.000
|
$75.000
|
$40.000
|
$93.000
|
$80.000
|
$140.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
16.000
|
$3,400.000
|
$3,350.000
|
$2,500.000
|
$2,500.000
|
$3,000.000
|
$2,085.000
|
$5,000.000
|
$3,094.460
|
$15,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,190.000
|
$35.000
|
$83.000
|
$28.000
|
$21.000
|
$50.000
|
$22.000
|
$35.000
|
$56.000
|
$75.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,920.000
|
$10.000
|
$5.000
|
$3.000
|
$6.000
|
$8.000
|
$5.000
|
$12.000
|
$10.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,190.000
|
$7.500
|
$8.000
|
$7.500
|
$9.000
|
$22.000
|
$11.000
|
$16.000
|
$16.000
|
$5.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,200.000
|
$17.000
|
$26.000
|
$25.000
|
$25.300
|
$27.000
|
$24.000
|
$31.000
|
$40.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,360.000
|
$2,100.000
|
$2,000.000
|
$3,000.000
|
$2,100.000
|
$1,900.000
|
$2,150.000
|
$2,900.000
|
$1,900.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,113.000
|
$3.000
|
$3.500
|
$2.000
|
$2.000
|
$4.000
|
$3.000
|
$3.300
|
$5.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,140.000
|
$3,610.000
|
$3,100.000
|
$3,300.000
|
$3,750.000
|
$3,350.000
|
$3,400.000
|
$4,000.000
|
$3,350.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$262.000
|
$345.000
|
$230.000
|
$250.000
|
$330.000
|
$300.000
|
$275.000
|
$400.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,314.000
|
$1,650.000
|
$950.000
|
$2,100.000
|
$1,500.000
|
$865.000
|
$1,680.000
|
$1,700.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,145.000
|
$850.000
|
$750.000
|
$1,050.000
|
$1,000.000
|
$570.000
|
$1,200.000
|
$900.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,300.000
|
$12,500.000
|
$8,200.000
|
$9,450.000
|
$9,000.000
|
$8,150.000
|
$12,600.000
|
$12,000.000
|
$8,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$600.000
|
$820.000
|
$700.000
|
$800.000
|
$900.000
|
$725.000
|
$1,700.000
|
$150.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$735.000
|
$1,200.000
|
$880.000
|
$950.000
|
$1,200.000
|
$1,050.000
|
$1,900.000
|
$180.000
|
$1,050.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$23.000
|
$31.000
|
$20.000
|
$52.500
|
$20.000
|
$15.000
|
$30.000
|
$45.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
24.000
|
$34.000
|
$25.000
|
$21.000
|
$22.000
|
$20.000
|
$15.000
|
$33.000
|
$40.000
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
482.000
|
$4.000
|
$5.500
|
$5.100
|
$5.500
|
$5.500
|
$4.750
|
$5.500
|
$7.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,911.000
|
$0.900
|
$1.100
|
$1.100
|
$1.000
|
$1.500
|
$1.000
|
$1.380
|
$1.500
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
68.000
|
$8.000
|
$15.500
|
$12.900
|
$12.000
|
$13.000
|
$12.000
|
$8.910
|
$20.000
|
$8.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
19,200.000
|
$0.900
|
$1.100
|
$1.100
|
$1.000
|
$1.500
|
$1.000
|
$1.100
|
$1.500
|
$1.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,460.000
|
$0.350
|
$0.400
|
$0.300
|
$0.250
|
$1.000
|
$0.250
|
$1.100
|
$0.400
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
3,924.000
|
$1.300
|
$1.150
|
$1.100
|
$1.000
|
$1.500
|
$1.000
|
$1.650
|
$1.500
|
$1.500
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
326.000
|
$0.660
|
$2.700
|
$2.200
|
$2.000
|
$3.000
|
$2.000
|
$1.650
|
$3.000
|
$1.500
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
8,440.000
|
$1.300
|
$1.100
|
$1.100
|
$1.000
|
$1.500
|
$1.000
|
$1.650
|
$1.500
|
$1.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
123.000
|
$5.000
|
$6.800
|
$5.400
|
$5.000
|
$6.000
|
$5.000
|
$5.500
|
$8.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,271.000
|
$0.500
|
$0.600
|
$0.600
|
$0.550
|
$0.750
|
$0.550
|
$0.550
|
$0.800
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,460.000
|
$0.400
|
$1.500
|
$1.350
|
$1.250
|
$1.500
|
$1.250
|
$0.280
|
$2.000
|
$0.250
|
|
|
FULL - WIDTH MOWING
|
CYC
|
8.000
|
$2,825.000
|
$4,500.000
|
$550.000
|
$1,000.000
|
$1,200.000
|
$4,000.000
|
$440.000
|
$4,000.000
|
$250.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
1,080.000
|
$90.000
|
$160.000
|
$140.000
|
$160.000
|
$160.000
|
$145.000
|
$175.000
|
$200.000
|
$145.000
|
|
|
TACK COAT
|
GAL
|
399.000
|
$3.000
|
$4.200
|
$4.600
|
$3.600
|
$4.000
|
$3.500
|
$14.000
|
$6.000
|
$3.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,500.000
|
$11,000.000
|
$14,000.000
|
$10,000.000
|
$15,000.000
|
$8,320.000
|
$15,000.000
|
$50,000.000
|
$12,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
336.000
|
$150.000
|
$140.000
|
$200.000
|
$105.000
|
$75.000
|
$48.000
|
$165.000
|
$260.000
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$335.000
|
$145.000
|
$675.000
|
$735.000
|
$1,500.000
|
$500.000
|
$405.000
|
$1,300.000
|
$1,500.000
|
|
Totals: |
$3,581,501.900
|
$4,243,947.800
|
$4,431,099.950
|
$4,749,991.320
|
$4,916,743.230
|
$4,977,531.260
|
$5,427,295.690
|
$5,999,548.350
|
$6,270,605.430
|