PREPARING ROW
|
STA
|
22.000
|
$7,000.000
|
$2,000.000
|
$5,250.000
|
$4,500.000
|
$6,000.000
|
$29,430.000
|
$9,500.000
|
$8,606.580
|
$5,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
119.000
|
$12.000
|
$20.000
|
$63.000
|
$15.000
|
$60.000
|
$9.500
|
$19.000
|
$29.470
|
$30.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
420.000
|
$9.000
|
$15.000
|
$6.300
|
$8.000
|
$25.000
|
$2.200
|
$18.000
|
$6.910
|
$10.000
|
|
|
REMOV STAB BASE & ASPH PAV (8"-20")
|
SY
|
3,585.000
|
$7.000
|
$15.000
|
$7.350
|
$15.000
|
$14.000
|
$8.500
|
$16.000
|
$17.280
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
207.000
|
$15.000
|
$17.000
|
$7.350
|
$15.000
|
$38.000
|
$8.500
|
$19.000
|
$9.600
|
$15.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
1,997.000
|
$6.500
|
$12.500
|
$7.350
|
$20.000
|
$12.000
|
$8.500
|
$8.500
|
$17.280
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,889.000
|
$18.000
|
$14.000
|
$21.000
|
$15.000
|
$28.000
|
$7.000
|
$28.000
|
$32.250
|
$20.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
21,679.000
|
$15.000
|
$13.500
|
$21.000
|
$15.000
|
$38.000
|
$24.000
|
$30.000
|
$18.000
|
$25.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
761.000
|
$22.500
|
$18.000
|
$31.500
|
$15.000
|
$57.000
|
$48.000
|
$33.000
|
$37.930
|
$25.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
20,373.000
|
$2.200
|
$2.000
|
$1.500
|
$2.000
|
$3.000
|
$3.300
|
$4.500
|
$6.940
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
20,373.000
|
$3.500
|
$4.000
|
$4.000
|
$6.000
|
$4.000
|
$5.500
|
$5.500
|
$5.880
|
$6.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
20,373.000
|
$0.200
|
$0.750
|
$0.100
|
$0.600
|
$0.200
|
$0.150
|
$0.650
|
$0.370
|
$0.750
|
|
|
VEGETATIVE WATERING
|
MG
|
3,789.000
|
$20.000
|
$5.000
|
$1.000
|
$1.000
|
$15.000
|
$5.000
|
$25.000
|
$30.000
|
$16.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
4,981.000
|
$20.000
|
$35.000
|
$18.000
|
$20.000
|
$17.000
|
$12.000
|
$16.000
|
$19.860
|
$12.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
2,937.000
|
$16.000
|
$35.000
|
$24.000
|
$25.000
|
$23.000
|
$15.000
|
$18.000
|
$26.060
|
$12.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
49.000
|
$200.000
|
$380.000
|
$250.000
|
$225.000
|
$250.000
|
$215.000
|
$526.000
|
$288.000
|
$600.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
2,937.000
|
$5.000
|
$16.500
|
$10.000
|
$15.000
|
$8.000
|
$7.500
|
$76.000
|
$11.700
|
$30.000
|
|
|
CEMENT
|
TON
|
29.000
|
$170.000
|
$400.000
|
$550.000
|
$250.000
|
$225.000
|
$255.000
|
$503.000
|
$281.680
|
$500.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
5,094.000
|
$4.000
|
$8.000
|
$3.000
|
$15.000
|
$6.000
|
$4.800
|
$34.000
|
$28.270
|
$25.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
1,584.000
|
$12.500
|
$11.000
|
$8.860
|
$8.000
|
$8.000
|
$7.000
|
$10.000
|
$7.440
|
$12.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
3,960.000
|
$8.500
|
$14.000
|
$7.090
|
$8.000
|
$7.000
|
$7.200
|
$10.650
|
$8.100
|
$10.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
3,326.000
|
$10.000
|
$14.000
|
$8.930
|
$10.000
|
$9.000
|
$9.000
|
$10.500
|
$10.200
|
$10.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
75.000
|
$630.000
|
$280.000
|
$682.500
|
$700.000
|
$750.000
|
$687.000
|
$865.000
|
$780.000
|
$900.000
|
|
|
CEM STABIL BKFL
|
CY
|
305.600
|
$175.000
|
$225.000
|
$300.000
|
$200.000
|
$200.000
|
$160.000
|
$280.000
|
$206.200
|
$350.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,153.000
|
$35.000
|
$42.000
|
$25.000
|
$30.000
|
$20.000
|
$35.000
|
$37.000
|
$42.000
|
$50.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
220.000
|
$130.000
|
$150.000
|
$125.000
|
$90.000
|
$157.000
|
$90.000
|
$218.000
|
$172.410
|
$400.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,236.000
|
$240.000
|
$250.000
|
$225.000
|
$215.000
|
$282.000
|
$240.000
|
$308.000
|
$355.270
|
$600.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
115.800
|
$1,200.000
|
$1,400.000
|
$1,500.000
|
$1,400.000
|
$1,000.000
|
$1,100.000
|
$583.000
|
$1,686.250
|
$1,500.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
61.600
|
$1,600.000
|
$1,800.000
|
$1,500.000
|
$1,400.000
|
$1,200.000
|
$1,300.000
|
$530.000
|
$2,077.530
|
$1,500.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
31.400
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
$1,400.000
|
$1,100.000
|
$1,300.000
|
$679.000
|
$2,596.170
|
$1,500.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
6.000
|
$700.000
|
$1,500.000
|
$1,300.000
|
$600.000
|
$600.000
|
$720.000
|
$727.000
|
$1,902.000
|
$700.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
17,890.000
|
$24.000
|
$23.250
|
$30.000
|
$24.000
|
$22.000
|
$23.000
|
$15.000
|
$43.640
|
$30.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
169.600
|
$600.000
|
$600.000
|
$800.000
|
$800.000
|
$790.000
|
$625.000
|
$1,255.000
|
$731.820
|
$650.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
972.900
|
$230.000
|
$260.000
|
$210.000
|
$250.000
|
$180.000
|
$190.000
|
$299.000
|
$242.350
|
$600.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,774.400
|
$190.000
|
$290.000
|
$210.000
|
$255.000
|
$220.000
|
$194.000
|
$280.000
|
$256.800
|
$275.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2,024.000
|
$165.000
|
$140.000
|
$120.030
|
$145.000
|
$125.000
|
$125.000
|
$117.000
|
$172.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
77.000
|
$650.000
|
$500.000
|
$600.000
|
$600.000
|
$650.000
|
$600.000
|
$115.000
|
$817.390
|
$600.000
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
46.000
|
$150.000
|
$300.000
|
$315.000
|
$130.000
|
$180.000
|
$160.000
|
$289.000
|
$126.090
|
$150.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
906.000
|
$150.000
|
$160.000
|
$150.000
|
$140.000
|
$180.000
|
$140.000
|
$315.000
|
$124.620
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
180.000
|
$150.000
|
$150.000
|
$200.000
|
$150.000
|
$130.000
|
$120.000
|
$39.000
|
$122.530
|
$500.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
50.000
|
$400.000
|
$400.000
|
$250.000
|
$350.000
|
$340.000
|
$260.000
|
$435.000
|
$371.610
|
$600.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
114.000
|
$100.000
|
$75.000
|
$85.000
|
$80.000
|
$167.000
|
$100.000
|
$151.000
|
$147.560
|
$150.000
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(P)
|
EA
|
2.000
|
$4,000.000
|
$14,600.000
|
$10,000.000
|
$2,000.000
|
$4,000.000
|
$7,900.000
|
$1,850.000
|
$8,727.180
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
40.000
|
$25.000
|
$25.000
|
$15.000
|
$15.000
|
$50.000
|
$29.000
|
$33.000
|
$18.380
|
$50.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$35,000.000
|
$25,000.000
|
$25,000.000
|
$100,000.000
|
$40,000.000
|
$296,000.000
|
$51,000.000
|
$30,089.070
|
$50,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$60,000.000
|
$85,000.000
|
$75,000.000
|
$150,000.000
|
$74,000.000
|
$328,100.000
|
$54,000.000
|
$54,420.110
|
$100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$491,932.290
|
$480,000.000
|
$580,000.000
|
$530,000.000
|
$625,736.960
|
$647,500.000
|
$510,000.000
|
$920,640.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$12,000.000
|
$2,500.000
|
$21,000.000
|
$7,000.000
|
$10,000.000
|
$7,000.000
|
$2,500.000
|
$3,829.490
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
156.000
|
$35.000
|
$40.000
|
$30.000
|
$1.000
|
$40.000
|
$38.000
|
$46.000
|
$54.180
|
$50.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
70.000
|
$45.000
|
$50.000
|
$36.000
|
$1.000
|
$110.000
|
$59.000
|
$73.000
|
$114.000
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
226.000
|
$10.000
|
$10.000
|
$15.000
|
$1.000
|
$14.000
|
$15.000
|
$28.000
|
$36.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
977.000
|
$27.000
|
$18.000
|
$22.500
|
$1.000
|
$35.000
|
$32.000
|
$30.000
|
$53.100
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
977.000
|
$8.000
|
$1.000
|
$12.000
|
$1.000
|
$8.000
|
$12.000
|
$18.000
|
$36.000
|
$30.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,130.000
|
$3.000
|
$4.000
|
$2.000
|
$1.000
|
$4.000
|
$3.200
|
$5.300
|
$3.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,130.000
|
$0.550
|
$1.500
|
$0.200
|
$1.000
|
$0.900
|
$1.000
|
$1.750
|
$1.380
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
99.000
|
$6.000
|
$22.000
|
$5.000
|
$5.000
|
$8.000
|
$5.500
|
$6.650
|
$9.900
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
99.000
|
$2.500
|
$10.000
|
$1.000
|
$1.000
|
$3.000
|
$1.000
|
$2.000
|
$5.400
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,939.000
|
$90.000
|
$55.000
|
$75.000
|
$75.000
|
$94.000
|
$51.000
|
$69.000
|
$133.610
|
$150.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
14.000
|
$5,000.000
|
$5,000.000
|
$3,500.000
|
$3,000.000
|
$6,000.000
|
$3,400.000
|
$5,450.000
|
$4,089.600
|
$4,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,100.000
|
$60.000
|
$75.000
|
$25.000
|
$80.000
|
$57.000
|
$28.000
|
$114.000
|
$55.830
|
$75.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,710.000
|
$10.000
|
$21.000
|
$10.000
|
$10.000
|
$9.000
|
$4.000
|
$6.000
|
$7.410
|
$5.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,100.000
|
$15.000
|
$25.000
|
$15.000
|
$20.000
|
$13.000
|
$11.000
|
$9.000
|
$13.210
|
$75.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
262.000
|
$60.000
|
$38.000
|
$55.000
|
$80.000
|
$130.000
|
$28.000
|
$47.000
|
$45.190
|
$65.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
95.000
|
$30.000
|
$70.000
|
$40.000
|
$50.000
|
$120.000
|
$17.000
|
$21.000
|
$34.620
|
$25.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
2,144.000
|
$0.750
|
$1.750
|
$1.310
|
$4.000
|
$1.000
|
$2.200
|
$4.200
|
$1.500
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
1,101.000
|
$0.750
|
$1.750
|
$1.310
|
$5.000
|
$1.000
|
$2.200
|
$4.200
|
$1.500
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
737.500
|
$30.000
|
$31.000
|
$24.150
|
$26.000
|
$25.000
|
$26.000
|
$27.000
|
$30.960
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$2,200.000
|
$2,500.000
|
$2,833.550
|
$1,800.000
|
$2,200.000
|
$1,700.000
|
$2,300.000
|
$2,678.400
|
$2,500.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
1.000
|
$1,200.000
|
$2,000.000
|
$971.250
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$1,800.000
|
$1,140.000
|
$1,600.000
|
|
|
SHORT RADIUS
|
LF
|
37.000
|
$40.000
|
$75.000
|
$36.750
|
$30.000
|
$40.000
|
$36.000
|
$83.000
|
$72.000
|
$90.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,230.000
|
$2,200.000
|
$1,433.250
|
$1,400.000
|
$1,500.000
|
$1,400.000
|
$2,240.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,312.500
|
$3.500
|
$8.000
|
$1.840
|
$2.000
|
$2.000
|
$2.100
|
$11.000
|
$3.600
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,400.000
|
$3,800.000
|
$3,148.950
|
$3,200.000
|
$3,200.000
|
$3,100.000
|
$4,250.000
|
$3,900.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$300.000
|
$250.000
|
$236.250
|
$500.000
|
$300.000
|
$255.000
|
$795.000
|
$360.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
7.000
|
$1,500.000
|
$3,500.000
|
$1,500.000
|
$3,000.000
|
$1,300.000
|
$1,100.000
|
$3,420.000
|
$1,200.000
|
$9,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$900.000
|
$1,800.000
|
$750.000
|
$1,000.000
|
$600.000
|
$910.000
|
$1,500.000
|
$960.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
9.000
|
$9,500.000
|
$12,000.000
|
$9,000.000
|
$10,000.000
|
$10,000.000
|
$8,300.000
|
$13,610.000
|
$11,160.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$300.000
|
$500.000
|
$343.350
|
$500.000
|
$400.000
|
$440.000
|
$650.000
|
$360.000
|
$600.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$400.000
|
$700.000
|
$373.800
|
$500.000
|
$400.000
|
$490.000
|
$375.000
|
$396.000
|
$600.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$600.000
|
$1,000.000
|
$815.850
|
$500.000
|
$800.000
|
$920.000
|
$850.000
|
$900.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$750.000
|
$800.000
|
$856.800
|
$1,000.000
|
$1,100.000
|
$730.000
|
$870.000
|
$960.000
|
$1,200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$30.000
|
$25.000
|
$15.750
|
$20.000
|
$67.000
|
$20.000
|
$23.000
|
$78.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
8.000
|
$25.000
|
$25.000
|
$19.950
|
$20.000
|
$80.000
|
$20.000
|
$29.000
|
$36.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
9.000
|
$32.000
|
$35.000
|
$26.250
|
$30.000
|
$96.000
|
$28.000
|
$11.000
|
$36.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
6.000
|
$90.000
|
$55.000
|
$126.000
|
$50.000
|
$200.000
|
$122.000
|
$73.000
|
$144.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
78.000
|
$6.500
|
$10.000
|
$5.250
|
$10.000
|
$7.000
|
$6.500
|
$8.000
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,207.000
|
$1.200
|
$1.650
|
$1.420
|
$1.000
|
$1.500
|
$1.400
|
$2.000
|
$1.620
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
20.000
|
$12.500
|
$25.000
|
$18.900
|
$20.000
|
$9.000
|
$9.000
|
$11.000
|
$21.600
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
11,467.000
|
$1.200
|
$1.700
|
$1.420
|
$1.000
|
$1.500
|
$1.400
|
$1.750
|
$1.620
|
$1.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,528.000
|
$1.450
|
$0.800
|
$0.580
|
$0.800
|
$0.500
|
$0.500
|
$1.000
|
$0.660
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
510.000
|
$0.750
|
$1.500
|
$1.050
|
$1.200
|
$0.700
|
$0.700
|
$1.000
|
$1.200
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,115.000
|
$0.750
|
$1.000
|
$0.680
|
$0.750
|
$0.600
|
$0.550
|
$1.000
|
$0.780
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
4,887.000
|
$1.000
|
$0.900
|
$0.580
|
$0.750
|
$0.500
|
$0.500
|
$1.000
|
$0.660
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
160.000
|
$5.000
|
$10.000
|
$6.040
|
$5.000
|
$9.000
|
$9.000
|
$11.000
|
$6.900
|
$6.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,058.000
|
$0.650
|
$0.900
|
$0.820
|
$0.750
|
$0.600
|
$0.570
|
$1.000
|
$0.940
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
11,530.000
|
$0.500
|
$0.750
|
$0.050
|
$0.250
|
$0.030
|
$0.030
|
$1.000
|
$0.060
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
510.000
|
$0.250
|
$5.000
|
$0.110
|
$0.500
|
$0.030
|
$0.030
|
$1.000
|
$0.060
|
$0.100
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$2,000.000
|
$1,000.000
|
$1,200.000
|
$1,500.000
|
$3,600.000
|
$630.000
|
$4,500.000
|
$3,120.000
|
$38.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
1,273.000
|
$160.000
|
$175.000
|
$150.000
|
$175.000
|
$150.000
|
$150.000
|
$215.000
|
$165.900
|
$225.000
|
|
|
TACK COAT
|
GAL
|
475.000
|
$4.500
|
$4.000
|
$8.000
|
$8.000
|
$9.000
|
$8.500
|
$6.000
|
$9.600
|
$2.000
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
|
LF
|
876.000
|
$2.750
|
$8.250
|
$2.000
|
$1.000
|
$6.000
|
$5.500
|
$5.000
|
$4.580
|
$5.000
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
|
LF
|
876.000
|
$0.800
|
$3.500
|
$0.200
|
$1.000
|
$2.000
|
$1.500
|
$2.000
|
$1.380
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$8,000.000
|
$17,500.000
|
$60,000.000
|
$40,000.000
|
$12,000.000
|
$24,000.000
|
$15,600.000
|
$2,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
742.000
|
$160.000
|
$125.000
|
$157.500
|
$180.000
|
$185.000
|
$170.000
|
$180.000
|
$219.600
|
$220.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
14.000
|
$200.000
|
$500.000
|
$735.000
|
$180.000
|
$1,000.000
|
$550.000
|
$180.000
|
$1,200.000
|
$250.000
|
|
Totals: |
$5,694,055.140
|
$5,848,540.850
|
$6,023,347.505
|
$6,072,254.700
|
$6,462,323.560
|
$6,479,555.510
|
$6,951,604.150
|
$7,555,414.453
|
$7,735,831.000
|