|
|
PREPARING ROW
|
STA
|
30.000
|
$500.000
|
$955.000
|
$1,500.000
|
$4,200.000
|
$750.000
|
$800.000
|
|
|
RMV (11"-15") TRT/UNTRT BASE & ASPH PAV
|
SY
|
666.000
|
$14.000
|
$17.290
|
$20.000
|
$10.000
|
$35.000
|
$15.500
|
|
|
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
530.000
|
$11.000
|
$17.290
|
$20.000
|
$10.000
|
$16.000
|
$15.500
|
|
|
EXCAV (ROADWAY)
|
CY
|
1,222.000
|
$18.000
|
$12.500
|
$20.000
|
$15.900
|
$40.000
|
$25.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
2,259.000
|
$25.000
|
$20.500
|
$30.000
|
$53.000
|
$70.000
|
$35.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
30.000
|
$300.000
|
$266.000
|
$450.000
|
$848.000
|
$500.000
|
$725.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
23,808.000
|
$2.000
|
$1.150
|
$3.000
|
$4.500
|
$0.500
|
$1.030
|
|
|
BLOCK SODDING
|
SY
|
664.000
|
$5.000
|
$6.550
|
$10.000
|
$6.500
|
$7.000
|
$5.870
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
23,144.000
|
$0.200
|
$0.230
|
$0.300
|
$0.300
|
$0.250
|
$0.210
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
11,572.000
|
$0.200
|
$0.120
|
$0.300
|
$0.200
|
$0.250
|
$0.110
|
|
|
VEGETATIVE WATERING
|
TGL
|
5,264.000
|
$5.000
|
$6.500
|
$1.000
|
$1.060
|
$1.000
|
$0.010
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
|
SY
|
4,896.000
|
$25.000
|
$24.000
|
$25.000
|
$40.000
|
$40.000
|
$64.300
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,468.000
|
$5.000
|
$6.410
|
$6.000
|
$5.300
|
$1.000
|
$15.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
807.000
|
$107.000
|
$159.680
|
$125.000
|
$135.680
|
$130.000
|
$180.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
1,586.000
|
$115.000
|
$138.320
|
$140.000
|
$137.800
|
$140.000
|
$170.000
|
|
|
TACK COAT
|
GAL
|
1,340.000
|
$3.000
|
$2.900
|
$4.000
|
$2.120
|
$1.000
|
$20.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
200.000
|
$120.000
|
$273.850
|
$120.000
|
$192.000
|
$175.000
|
$220.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
9,519.000
|
$2.000
|
$3.870
|
$4.000
|
$3.710
|
$3.750
|
$3.470
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
77.000
|
$750.000
|
$520.930
|
$385.000
|
$495.020
|
$460.000
|
$721.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
5.000
|
$400.000
|
$325.000
|
$185.000
|
$1,050.000
|
$800.000
|
$300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
176.000
|
$75.000
|
$91.000
|
$85.000
|
$160.000
|
$125.000
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
134.000
|
$90.000
|
$120.000
|
$105.000
|
$275.000
|
$150.000
|
$130.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
76.000
|
$135.000
|
$126.000
|
$135.000
|
$445.000
|
$200.000
|
$250.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,300.000
|
$1,057.000
|
$1,250.000
|
$1,200.000
|
$2,100.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,400.000
|
$1,050.000
|
$2,000.000
|
$1,490.000
|
$2,500.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,800.000
|
$1,322.000
|
$2,000.000
|
$1,990.000
|
$2,900.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$2,136.000
|
$3,000.000
|
$2,365.000
|
$3,900.000
|
$3,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$5,000.000
|
$2,200.000
|
$2,500.000
|
$1,590.000
|
$6,000.000
|
$2,000.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$200.000
|
$250.000
|
$500.000
|
$355.000
|
$500.000
|
$850.000
|
|
|
REMOVE STR (DRIVEWAY CULVERT)
|
EA
|
10.000
|
$200.000
|
$435.000
|
$500.000
|
$566.000
|
$2,500.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$143,000.000
|
$153,000.000
|
$140,000.000
|
$183,000.000
|
$222,000.000
|
$280,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$18,000.000
|
$2,000.000
|
$12,500.000
|
$25,000.000
|
$35,000.000
|
$45,250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$17,000.000
|
$13,600.000
|
$10,000.000
|
$9,450.000
|
$15,000.000
|
$12,600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$230.000
|
$271.000
|
$250.000
|
$75.000
|
$150.000
|
$650.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
$40.000
|
$95.000
|
$85.000
|
$37.500
|
$25.000
|
$160.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
125.000
|
$45.000
|
$40.010
|
$30.000
|
$75.000
|
$39.000
|
$35.870
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
125.000
|
$15.000
|
$13.160
|
$15.000
|
$45.000
|
$16.000
|
$11.800
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
86.000
|
$32.000
|
$47.160
|
$50.000
|
$35.000
|
$20.000
|
$42.280
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
86.000
|
$9.000
|
$12.100
|
$20.000
|
$20.000
|
$5.000
|
$10.850
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,100.000
|
$4.000
|
$3.770
|
$4.000
|
$4.000
|
$3.750
|
$3.380
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,100.000
|
$1.000
|
$0.960
|
$2.000
|
$1.750
|
$1.000
|
$0.860
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
275.000
|
$7.000
|
$8.440
|
$18.000
|
$6.000
|
$6.000
|
$7.570
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
275.000
|
$1.500
|
$0.960
|
$9.000
|
$3.000
|
$1.250
|
$0.860
|
|
|
DRIVEWAYS (ACP)
|
SY
|
690.000
|
$60.000
|
$100.000
|
$40.000
|
$93.000
|
$80.000
|
$125.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
4,342.000
|
$0.200
|
$0.560
|
$1.000
|
$1.250
|
$0.300
|
$0.300
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
215.000
|
$0.250
|
$0.560
|
$1.000
|
$1.250
|
$0.300
|
$0.300
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
4.000
|
$240.000
|
$306.760
|
$850.000
|
$291.500
|
$290.000
|
$500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
5.000
|
$15.000
|
$16.730
|
$100.000
|
$16.000
|
$27.000
|
$35.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
92.000
|
$25.000
|
$34.430
|
$80.000
|
$33.000
|
$50.000
|
$72.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
72.000
|
$20.000
|
$20.080
|
$50.000
|
$20.000
|
$29.000
|
$37.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
10.000
|
$25.000
|
$27.890
|
$80.000
|
$27.000
|
$32.000
|
$39.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
28.000
|
$20.000
|
$18.960
|
$50.000
|
$18.000
|
$28.000
|
$36.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,616.000
|
$2.500
|
$2.230
|
$3.000
|
$2.500
|
$4.250
|
$4.400
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
138.000
|
$3.000
|
$2.790
|
$3.000
|
$3.000
|
$4.750
|
$4.400
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
194.000
|
$3.000
|
$2.790
|
$3.000
|
$3.000
|
$4.750
|
$4.400
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
84.000
|
$3.500
|
$4.230
|
$3.000
|
$4.500
|
$6.000
|
$5.500
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
3.000
|
$1,500.000
|
$1,522.630
|
$1,150.000
|
$1,500.000
|
$1,600.000
|
$2,600.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,600.000
|
$1,673.220
|
$12,500.000
|
$1,600.000
|
$1,700.000
|
$2,730.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/16")
|
LF
|
1,284.000
|
$5.000
|
$5.520
|
$3.000
|
$6.000
|
$4.250
|
$6.600
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
2,150.000
|
$5.000
|
$7.030
|
$3.000
|
$6.500
|
$5.000
|
$6.600
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
1.000
|
$12,000.000
|
$10,028.130
|
$12,500.000
|
$10,000.000
|
$15,000.000
|
$11,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
42.000
|
$50.000
|
$36.460
|
$30.000
|
$40.000
|
$34.000
|
$57.500
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
18.000
|
$500.000
|
$663.710
|
$1,150.000
|
$650.000
|
$600.000
|
$2,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
4.000
|
$550.000
|
$842.190
|
$1,150.000
|
$800.000
|
$800.000
|
$800.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GNDLL
|
EA
|
8.000
|
$50.000
|
$72.510
|
$100.000
|
$75.000
|
$70.000
|
$250.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
610.000
|
$1.000
|
$2.750
|
$4.000
|
$4.200
|
$2.750
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,080.000
|
$1.000
|
$1.120
|
$3.000
|
$1.060
|
$1.250
|
$1.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
126.000
|
$10.000
|
$8.090
|
$8.000
|
$7.690
|
$8.000
|
$7.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$180.000
|
$195.210
|
$250.000
|
$185.500
|
$150.000
|
$140.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
8.000
|
$230.000
|
$217.520
|
$250.000
|
$206.700
|
$180.000
|
$168.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
780.000
|
$3.000
|
$3.350
|
$6.000
|
$3.180
|
$4.250
|
$3.950
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
8,636.000
|
$0.800
|
$0.670
|
$0.650
|
$0.640
|
$0.700
|
$0.640
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
12,254.000
|
$0.800
|
$0.670
|
$0.650
|
$0.640
|
$0.700
|
$0.640
|
|
REFL PAV MRKR TY I-C
|
EA
|
58.000
|
$5.000
|
$7.530
|
$6.000
|
$7.160
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
307.000
|
$5.000
|
$7.530
|
$6.000
|
$7.160
|
$5.000
|
$5.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$60,000.000
|
$49,036.340
|
$40,000.000
|
$52,500.000
|
$50,000.000
|
$55,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
9.000
|
$375.000
|
$420.530
|
$350.000
|
$420.000
|
$480.000
|
$1,000.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$375.000
|
$429.460
|
$350.000
|
$420.000
|
$480.000
|
$1,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
9.000
|
$375.000
|
$420.530
|
$350.000
|
$420.000
|
$480.000
|
$1,000.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$375.000
|
$429.460
|
$350.000
|
$420.000
|
$480.000
|
$1,000.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
9.000
|
$375.000
|
$420.530
|
$350.000
|
$420.000
|
$480.000
|
$1,000.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$375.000
|
$429.460
|
$350.000
|
$420.000
|
$480.000
|
$1,000.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
9.000
|
$200.000
|
$210.820
|
$200.000
|
$210.000
|
$210.000
|
$285.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
4.000
|
$250.000
|
$250.980
|
$250.000
|
$252.000
|
$430.000
|
$320.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
2,703.000
|
$2.500
|
$3.960
|
$3.000
|
$4.000
|
$4.250
|
$6.600
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
269.000
|
$2.700
|
$3.780
|
$3.000
|
$4.000
|
$3.750
|
$3.300
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
4.000
|
$13,000.000
|
$13,100.150
|
$18,500.000
|
$15,000.000
|
$17,000.000
|
$15,180.000
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
1.000
|
$10,000.000
|
$10,407.390
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$9,900.000
|
|
|
RVDS (PRESENCE AND ADVANCE DETECTION)
|
EA
|
4.000
|
$11,000.000
|
$12,236.770
|
$12,500.000
|
$12,000.000
|
$25,000.000
|
$25,575.000
|
|
Totals: |
$1,495,317.650
|
$1,537,356.710
|
$1,599,789.300
|
$2,015,072.020
|
$2,060,656.100
|
$2,486,177.930
|