|
|
PREPARING ROW
|
STA
|
11.000
|
$2,500.000
|
$1,490.000
|
$3,000.000
|
$8,333.490
|
$5,250.000
|
$7,500.000
|
$17,000.000
|
$5,500.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
700.000
|
$10.000
|
$8.000
|
$10.000
|
$16.210
|
$10.000
|
$20.000
|
$8.500
|
$10.000
|
|
|
REMOVE STAB BASE & ASPH PAV (24")
|
SY
|
1,127.000
|
$15.500
|
$12.000
|
$15.000
|
$17.530
|
$14.000
|
$16.250
|
$13.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,507.000
|
$18.000
|
$12.500
|
$15.000
|
$19.700
|
$15.750
|
$22.000
|
$26.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
270.000
|
$23.000
|
$19.000
|
$20.000
|
$18.970
|
$21.000
|
$26.000
|
$28.000
|
$30.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
283.000
|
$27.000
|
$34.500
|
$30.000
|
$21.650
|
$25.200
|
$19.000
|
$28.000
|
$30.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
132.000
|
$34.000
|
$54.000
|
$45.000
|
$27.370
|
$42.000
|
$63.000
|
$28.000
|
$30.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,500.000
|
$2.500
|
$3.630
|
$8.000
|
$3.180
|
$3.150
|
$5.000
|
$15.000
|
$8.000
|
|
|
BLOCK SODDING
|
SY
|
684.000
|
$6.250
|
$4.500
|
$6.000
|
$5.220
|
$6.300
|
$4.750
|
$7.000
|
$10.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
816.000
|
$1.000
|
$1.150
|
$4.000
|
$1.330
|
$2.000
|
$1.210
|
$4.000
|
$5.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
1,500.000
|
$1.000
|
$0.600
|
$1.300
|
$0.700
|
$0.250
|
$0.630
|
$1.500
|
$1.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
1,500.000
|
$1.000
|
$0.600
|
$1.300
|
$0.700
|
$0.250
|
$0.630
|
$1.500
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
249.000
|
$25.000
|
$25.000
|
$55.000
|
$40.600
|
$3.500
|
$36.000
|
$65.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
2,025.000
|
$25.000
|
$33.000
|
$45.000
|
$23.300
|
$25.000
|
$18.750
|
$21.000
|
$40.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2)(18 )
|
SY
|
538.000
|
$31.500
|
$56.000
|
$60.000
|
$37.380
|
$39.000
|
$24.000
|
$34.000
|
$60.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
12.420
|
$178.000
|
$250.000
|
$220.000
|
$174.000
|
$189.000
|
$165.000
|
$165.000
|
$200.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
920.000
|
$10.000
|
$12.000
|
$12.000
|
$10.630
|
$10.500
|
$9.500
|
$10.000
|
$16.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
379.000
|
$7.000
|
$10.000
|
$13.000
|
$12.760
|
$12.100
|
$4.000
|
$15.000
|
$10.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
90.000
|
$4.000
|
$50.000
|
$8.000
|
$6.960
|
$6.600
|
$9.000
|
$6.600
|
$10.000
|
|
|
ASPH (RC-250)
|
GAL
|
50.000
|
$3.500
|
$135.000
|
$10.000
|
$9.280
|
$8.800
|
$12.000
|
$8.800
|
$10.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
1.000
|
$175.000
|
$9,000.000
|
$1,500.000
|
$1,102.000
|
$1,045.000
|
$1,000.000
|
$1,045.000
|
$1,000.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
269.000
|
$10.000
|
$26.000
|
$8.000
|
$6.960
|
$6.600
|
$10.000
|
$6.600
|
$12.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
4.000
|
$185.000
|
$2,600.000
|
$900.000
|
$870.000
|
$825.000
|
$810.000
|
$825.000
|
$800.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
3.000
|
$145.000
|
$870.000
|
$800.000
|
$754.000
|
$715.000
|
$810.000
|
$715.000
|
$800.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
|
TON
|
260.000
|
$90.000
|
$158.000
|
$200.000
|
$177.480
|
$168.300
|
$160.000
|
$160.000
|
$250.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
110.000
|
$30.000
|
$21.000
|
$25.000
|
$13.410
|
$11.000
|
$20.000
|
$26.000
|
$100.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
44.000
|
$85.000
|
$99.000
|
$70.000
|
$97.480
|
$73.500
|
$80.000
|
$136.000
|
$140.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
333.000
|
$163.000
|
$105.000
|
$130.000
|
$131.890
|
$144.000
|
$115.000
|
$178.000
|
$120.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
291.000
|
$180.000
|
$191.000
|
$230.000
|
$187.900
|
$168.000
|
$162.000
|
$254.000
|
$165.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
64.300
|
$950.000
|
$1,000.000
|
$1,000.000
|
$1,175.080
|
$1,500.000
|
$930.000
|
$950.000
|
$1,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
43.200
|
$950.000
|
$1,000.000
|
$1,000.000
|
$1,314.780
|
$1,500.000
|
$1,006.000
|
$1,330.000
|
$1,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
30.000
|
$950.000
|
$1,200.000
|
$900.000
|
$1,235.420
|
$1,800.000
|
$1,325.000
|
$1,330.000
|
$1,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
6,120.000
|
$24.000
|
$18.700
|
$24.000
|
$22.300
|
$40.000
|
$27.000
|
$22.000
|
$20.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
2,340.000
|
$16.000
|
$21.000
|
$20.000
|
$24.140
|
$40.000
|
$24.000
|
$17.000
|
$18.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
51.400
|
$500.000
|
$500.000
|
$650.000
|
$630.690
|
$525.000
|
$600.000
|
$720.000
|
$500.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
442.500
|
$170.000
|
$181.000
|
$160.000
|
$185.660
|
$150.000
|
$330.000
|
$201.000
|
$150.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
714.000
|
$165.000
|
$181.000
|
$140.000
|
$178.560
|
$150.000
|
$225.000
|
$211.000
|
$160.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
413.700
|
$125.000
|
$125.000
|
$100.000
|
$124.690
|
$111.000
|
$99.000
|
$110.000
|
$100.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
872.400
|
$135.000
|
$125.000
|
$100.000
|
$114.800
|
$111.000
|
$99.000
|
$90.000
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
63.000
|
$475.000
|
$500.000
|
$500.000
|
$473.980
|
$525.000
|
$500.000
|
$500.000
|
$500.000
|
|
|
RAIL (TY T223)
|
LF
|
764.000
|
$115.000
|
$124.000
|
$100.000
|
$97.140
|
$111.000
|
$110.000
|
$118.000
|
$110.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
67.000
|
$87.000
|
$110.000
|
$100.000
|
$91.130
|
$60.000
|
$100.000
|
$100.000
|
$75.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
128.000
|
$875.000
|
$830.000
|
$600.000
|
$569.840
|
$500.000
|
$550.000
|
$865.000
|
$1,100.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$27,000.000
|
$17,000.000
|
$28,000.000
|
$22,027.460
|
$30,000.000
|
$28,500.000
|
$30,000.000
|
$35,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$15,000.000
|
$1,311.970
|
$1,000.000
|
$975.000
|
$1,000.000
|
$5,000.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
25.000
|
$100.000
|
$400.000
|
$250.000
|
$230.790
|
$168.000
|
$220.000
|
$600.000
|
$20,000.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$9,500.000
|
$19,000.000
|
$30,000.000
|
$14,080.350
|
$25,000.000
|
$8,863.000
|
$15,000.000
|
$30,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$60,000.000
|
$30,000.000
|
$80,000.000
|
$46,765.040
|
$55,000.000
|
$50,000.000
|
$80,000.000
|
$50,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
250.000
|
$5.000
|
$7.000
|
$2.000
|
$5.800
|
$5.250
|
$35.000
|
$4.000
|
$3.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$152,464.000
|
$117,000.000
|
$200,000.000
|
$226,797.400
|
$132,000.000
|
$180,000.000
|
$53,000.000
|
$225,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$2,500.000
|
$1,200.000
|
$2,000.000
|
$1,980.280
|
$2,100.000
|
$3,500.000
|
$4,500.000
|
$4,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
32.000
|
$35.000
|
$23.500
|
$42.000
|
$27.260
|
$25.000
|
$24.750
|
$42.000
|
$40.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
48.000
|
$45.000
|
$24.500
|
$46.000
|
$28.420
|
$30.000
|
$25.750
|
$46.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$12.000
|
$15.000
|
$9.000
|
$17.400
|
$9.000
|
$15.750
|
$9.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
546.000
|
$24.000
|
$19.250
|
$16.000
|
$18.500
|
$7.500
|
$20.250
|
$15.000
|
$5.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
546.000
|
$10.500
|
$10.000
|
$9.000
|
$5.800
|
$3.000
|
$10.500
|
$9.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,128.000
|
$2.300
|
$1.650
|
$3.000
|
$1.910
|
$1.500
|
$1.850
|
$3.250
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,128.000
|
$1.500
|
$0.750
|
$0.600
|
$0.870
|
$0.120
|
$1.000
|
$0.550
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
625.000
|
$19.500
|
$17.500
|
$24.000
|
$24.940
|
$20.630
|
$18.500
|
$21.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
8.000
|
$875.000
|
$700.000
|
$900.000
|
$1,044.000
|
$880.000
|
$735.000
|
$880.000
|
$400.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,000.000
|
$900.000
|
$1,200.000
|
$1,450.000
|
$990.000
|
$945.000
|
$990.000
|
$800.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$550.000
|
$700.000
|
$800.000
|
$870.000
|
$550.000
|
$740.000
|
$550.000
|
$800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
735.000
|
$2.500
|
$3.000
|
$3.000
|
$4.640
|
$3.300
|
$3.150
|
$3.300
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,200.000
|
$2,200.000
|
$2,500.000
|
$2,407.000
|
$2,282.500
|
$2,325.000
|
$2,283.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$200.000
|
$350.000
|
$261.000
|
$357.500
|
$210.000
|
$358.000
|
$100.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
197.000
|
$10.000
|
$10.000
|
$8.000
|
$12.760
|
$13.650
|
$21.000
|
$33.000
|
$15.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$450.000
|
$475.000
|
$650.000
|
$538.240
|
$533.500
|
$500.000
|
$566.500
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$500.000
|
$550.000
|
$650.000
|
$626.400
|
$643.500
|
$580.000
|
$632.500
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
28.000
|
$24.000
|
$28.000
|
$10.000
|
$30.160
|
$27.500
|
$27.250
|
$28.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
16.000
|
$25.000
|
$20.000
|
$10.000
|
$30.160
|
$27.500
|
$21.000
|
$28.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
10.000
|
$55.000
|
$50.000
|
$45.000
|
$87.000
|
$50.330
|
$52.500
|
$50.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$38.000
|
$35.000
|
$15.000
|
$48.720
|
$33.000
|
$37.000
|
$33.000
|
$40.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,568.000
|
$1.500
|
$2.000
|
$1.400
|
$3.480
|
$2.200
|
$1.210
|
$2.200
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,568.000
|
$0.900
|
$2.000
|
$1.400
|
$3.480
|
$2.200
|
$1.210
|
$2.200
|
$3.000
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
440.000
|
$0.650
|
$0.500
|
$0.600
|
$0.580
|
$0.550
|
$0.530
|
$0.550
|
$4.000
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
440.000
|
$0.650
|
$0.500
|
$0.600
|
$0.580
|
$0.550
|
$0.530
|
$0.550
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
21.000
|
$9.000
|
$5.000
|
$12.000
|
$5.800
|
$5.500
|
$10.500
|
$5.500
|
$25.000
|
|
|
REMOVE AND REPLACE WOOD FENCE
|
LF
|
32.000
|
$49.000
|
$86.000
|
$40.000
|
$52.200
|
$63.000
|
$50.000
|
$65.000
|
$150.000
|
|
Totals: |
$1,685,184.360
|
$1,648,413.600
|
$1,834,483.600
|
$1,845,288.119
|
$1,849,980.490
|
$1,869,758.770
|
$1,945,954.800
|
$2,403,160.000
|