PREPARING ROW
|
STA
|
10.860
|
$8,000.000
|
$16,410.000
|
$5,500.000
|
$2,900.000
|
$19,000.000
|
$20,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
1,815.000
|
$8.000
|
$8.000
|
$10.000
|
$17.000
|
$10.000
|
$5.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
131.000
|
$15.000
|
$8.000
|
$10.000
|
$36.000
|
$20.000
|
$2.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,319.000
|
$20.000
|
$9.000
|
$20.000
|
$31.000
|
$25.000
|
$20.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
1,466.000
|
$15.000
|
$5.000
|
$25.000
|
$37.000
|
$25.000
|
$30.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
60.000
|
$35.000
|
$48.000
|
$30.000
|
$115.000
|
$75.000
|
$30.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
4,531.000
|
$2.000
|
$1.450
|
$3.000
|
$3.600
|
$2.100
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
4,531.000
|
$4.000
|
$4.750
|
$6.000
|
$5.250
|
$3.150
|
$5.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
4,531.000
|
$0.500
|
$0.200
|
$0.500
|
$0.300
|
$0.100
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
1,348.100
|
$15.000
|
$8.000
|
$1.000
|
$16.000
|
$1.050
|
$45.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(15")
|
SY
|
2,365.000
|
$37.000
|
$24.000
|
$40.000
|
$35.000
|
$45.000
|
$45.000
|
|
|
PRIME COAT (MS-2 OR SS-1)
|
GAL
|
473.000
|
$6.000
|
$13.300
|
$14.000
|
$9.000
|
$13.850
|
$15.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
394.000
|
$10.000
|
$16.500
|
$16.000
|
$15.000
|
$16.770
|
$18.000
|
|
|
ASPH (RC-250)
|
GAL
|
221.000
|
$8.000
|
$38.000
|
$38.000
|
$34.000
|
$39.250
|
$40.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
6.000
|
$250.000
|
$1,100.000
|
$1,500.000
|
$2,500.000
|
$1,065.000
|
$1,500.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
331.000
|
$12.000
|
$25.500
|
$25.000
|
$23.000
|
$26.090
|
$25.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
6.000
|
$250.000
|
$840.000
|
$1,000.000
|
$2,360.000
|
$852.000
|
$1,000.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
8.000
|
$200.000
|
$980.000
|
$1,000.000
|
$1,780.000
|
$1,011.750
|
$1,000.000
|
|
|
CEM STABIL BKFL
|
CY
|
150.000
|
$200.000
|
$120.000
|
$220.000
|
$237.000
|
$275.000
|
$250.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
114.000
|
$200.000
|
$220.000
|
$220.000
|
$200.000
|
$215.000
|
$225.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
811.000
|
$200.000
|
$250.000
|
$195.000
|
$225.000
|
$260.000
|
$275.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
75.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
$1,020.000
|
$1,500.000
|
$1,250.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
74.500
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$1,300.000
|
$1,500.000
|
$1,250.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
61.300
|
$1,100.000
|
$1,100.000
|
$1,200.000
|
$1,200.000
|
$1,500.000
|
$1,250.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
13,440.000
|
$19.500
|
$19.000
|
$24.000
|
$21.000
|
$25.000
|
$25.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
1,606.000
|
$20.000
|
$15.500
|
$20.000
|
$24.000
|
$30.000
|
$20.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
133.000
|
$560.000
|
$600.000
|
$800.000
|
$850.000
|
$700.000
|
$800.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
395.380
|
$200.000
|
$240.000
|
$235.000
|
$295.000
|
$275.000
|
$250.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,587.500
|
$180.000
|
$225.000
|
$235.000
|
$225.000
|
$250.000
|
$225.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
380.000
|
$145.000
|
$120.000
|
$150.000
|
$125.000
|
$105.000
|
$125.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,342.000
|
$150.000
|
$115.000
|
$145.000
|
$125.000
|
$105.000
|
$125.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
74.000
|
$450.000
|
$525.000
|
$500.000
|
$600.000
|
$700.000
|
$650.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
816.000
|
$120.000
|
$125.000
|
$140.000
|
$160.000
|
$145.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
125.000
|
$130.000
|
$110.000
|
$120.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$75,000.000
|
$20,000.000
|
$35,000.000
|
$15,000.000
|
$25,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$65,000.000
|
$150,000.000
|
$150,000.000
|
$70,000.000
|
$110,000.000
|
$125,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$236,770.700
|
$285,000.000
|
$265,000.000
|
$284,384.220
|
$325,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$14,500.000
|
$3,500.000
|
$8,500.000
|
$5,700.000
|
$5,250.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
72.000
|
$50.000
|
$45.000
|
$1.000
|
$185.000
|
$45.000
|
$70.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
72.000
|
$12.000
|
$12.000
|
$1.000
|
$70.000
|
$22.500
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
655.000
|
$25.000
|
$17.000
|
$1.000
|
$34.000
|
$10.500
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
655.000
|
$7.000
|
$9.500
|
$1.000
|
$8.000
|
$5.250
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,160.000
|
$3.000
|
$1.750
|
$1.000
|
$4.000
|
$2.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,160.000
|
$1.000
|
$0.450
|
$1.000
|
$1.000
|
$0.250
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
792.000
|
$6.000
|
$4.000
|
$5.000
|
$10.000
|
$7.500
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
792.000
|
$1.250
|
$1.000
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
84.000
|
$55.000
|
$35.000
|
$50.000
|
$170.000
|
$79.570
|
$75.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
600.000
|
$27.000
|
$23.000
|
$30.000
|
$25.000
|
$25.560
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,000.000
|
$1,900.000
|
$1,800.000
|
$2,150.000
|
$2,923.250
|
$2,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,625.000
|
$3,000.000
|
$3,100.000
|
$3,300.000
|
$3,439.950
|
$3,250.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 1
|
EA
|
1.000
|
$300.000
|
$350.000
|
$500.000
|
$500.000
|
$340.800
|
$750.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
1.000
|
$550.000
|
$400.000
|
$500.000
|
$250.000
|
$399.380
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$700.000
|
$810.000
|
$850.000
|
$690.000
|
$718.880
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$920.000
|
$850.000
|
$890.000
|
$931.880
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$1,000.000
|
$1,050.000
|
$1,000.000
|
$1,050.000
|
$1,091.630
|
$1,250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$25.000
|
$20.000
|
$20.000
|
$22.000
|
$21.300
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
14.000
|
$27.000
|
$26.000
|
$30.000
|
$30.000
|
$29.820
|
$40.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
2,172.000
|
$0.500
|
$1.050
|
$1.000
|
$0.760
|
$1.070
|
$1.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
2,172.000
|
$0.500
|
$1.050
|
$1.000
|
$0.760
|
$1.070
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
28.000
|
$6.000
|
$10.500
|
$10.000
|
$10.200
|
$10.650
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,344.000
|
$0.250
|
$1.050
|
$1.000
|
$0.760
|
$1.070
|
$1.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$3,000.000
|
$550.000
|
$500.000
|
$2,000.000
|
$800.000
|
$800.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$2,000.000
|
$550.000
|
$200.000
|
$1,200.000
|
$1,000.000
|
$400.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
390.000
|
$205.000
|
$155.000
|
$150.000
|
$145.000
|
$163.000
|
$170.000
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
|
LF
|
3,180.000
|
$4.000
|
$3.500
|
$0.100
|
$3.500
|
$1.860
|
$4.000
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
|
LF
|
3,180.000
|
$1.500
|
$1.000
|
$0.100
|
$1.000
|
$0.210
|
$1.000
|
|
Totals: |
$2,749,477.700
|
$2,851,250.800
|
$2,975,033.400
|
$3,012,231.550
|
$3,242,290.995
|
$3,275,581.500
|