|
|
PREPARING ROW
|
STA
|
31.200
|
$3,500.000
|
$1,000.000
|
$4,800.000
|
$1,320.000
|
$3,000.000
|
$8,618.000
|
$3,900.000
|
$1,650.000
|
$6,300.000
|
$4,500.000
|
$2,800.000
|
$3,000.000
|
$13,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
40.000
|
$20.000
|
$25.000
|
$50.000
|
$18.000
|
$15.000
|
$48.000
|
$10.000
|
$75.000
|
$31.500
|
$8.100
|
$25.000
|
$15.000
|
$19.050
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-12")
|
SY
|
7,823.000
|
$10.500
|
$5.000
|
$4.000
|
$3.930
|
$5.000
|
$3.500
|
$4.000
|
$4.750
|
$4.200
|
$4.000
|
$6.000
|
$12.000
|
$6.200
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,733.000
|
$10.500
|
$7.000
|
$15.000
|
$9.250
|
$8.000
|
$7.500
|
$9.000
|
$7.000
|
$9.450
|
$10.000
|
$10.000
|
$10.000
|
$30.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
11,226.000
|
$15.000
|
$10.000
|
$4.000
|
$14.000
|
$6.000
|
$7.500
|
$19.000
|
$10.000
|
$17.850
|
$16.550
|
$20.000
|
$10.000
|
$12.100
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
575.000
|
$20.000
|
$10.000
|
$25.000
|
$22.500
|
$14.000
|
$22.000
|
$19.000
|
$18.000
|
$31.500
|
$24.000
|
$20.000
|
$16.000
|
$25.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
25,742.000
|
$1.000
|
$2.000
|
$0.750
|
$0.790
|
$0.900
|
$0.800
|
$3.000
|
$1.800
|
$0.760
|
$1.200
|
$1.250
|
$1.000
|
$0.750
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
25,742.000
|
$0.200
|
$0.210
|
$0.140
|
$0.270
|
$0.300
|
$0.230
|
$0.200
|
$0.230
|
$2.770
|
$0.210
|
$0.350
|
$0.150
|
$0.140
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
7,793.000
|
$0.200
|
$0.230
|
$0.110
|
$0.240
|
$0.270
|
$0.250
|
$0.200
|
$0.260
|
$0.010
|
$0.230
|
$0.300
|
$0.150
|
$0.110
|
|
|
VEGETATIVE WATERING
|
MG
|
2,774.600
|
$15.000
|
$10.000
|
$6.000
|
$28.000
|
$25.000
|
$12.500
|
$19.000
|
$15.000
|
$1.050
|
$16.500
|
$1.000
|
$20.000
|
$15.000
|
|
|
FL BS (CMP IN PLC)(TY-D GR-1-2)(14")
|
SY
|
12,288.000
|
$20.000
|
$20.000
|
$16.500
|
$21.500
|
$40.000
|
$15.000
|
$19.000
|
$16.000
|
$17.850
|
$17.000
|
$25.000
|
$22.000
|
$16.900
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
184.000
|
$165.000
|
$180.000
|
$170.000
|
$190.000
|
$149.000
|
$170.000
|
$190.000
|
$240.000
|
$210.000
|
$186.000
|
$200.000
|
$190.000
|
$168.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
12,288.000
|
$6.000
|
$6.000
|
$5.000
|
$6.750
|
$4.000
|
$6.000
|
$4.000
|
$4.750
|
$6.300
|
$5.500
|
$5.000
|
$5.000
|
$4.450
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
2,460.000
|
$10.000
|
$5.340
|
$5.500
|
$3.250
|
$4.000
|
$7.250
|
$3.500
|
$5.700
|
$5.000
|
$7.000
|
$6.000
|
$5.000
|
$5.100
|
|
|
ASPH (CRS-2P)
|
GAL
|
3,075.000
|
$5.000
|
$5.000
|
$4.500
|
$5.230
|
$5.500
|
$4.800
|
$7.000
|
$4.750
|
$4.500
|
$11.210
|
$8.000
|
$5.000
|
$10.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
2,581.000
|
$5.000
|
$5.170
|
$5.250
|
$6.020
|
$3.700
|
$5.400
|
$7.000
|
$5.500
|
$5.200
|
$13.450
|
$8.000
|
$5.000
|
$12.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
61.000
|
$400.000
|
$500.000
|
$395.000
|
$546.230
|
$95.000
|
$420.000
|
$140.000
|
$420.000
|
$420.000
|
$336.290
|
$500.000
|
$130.000
|
$300.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
1,306.000
|
$90.000
|
$102.250
|
$101.350
|
$71.500
|
$95.000
|
$110.000
|
$99.000
|
$104.000
|
$75.000
|
$96.000
|
$100.000
|
$96.000
|
$84.150
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
716.000
|
$8.000
|
$5.000
|
$4.250
|
$6.920
|
$8.000
|
$5.500
|
$7.000
|
$4.600
|
$9.000
|
$7.000
|
$9.000
|
$3.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,552.000
|
$24.000
|
$30.000
|
$30.000
|
$42.200
|
$60.400
|
$54.000
|
$40.000
|
$32.000
|
$31.500
|
$47.000
|
$30.000
|
$25.000
|
$25.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
803.000
|
$150.000
|
$150.000
|
$170.000
|
$174.950
|
$290.000
|
$175.000
|
$190.000
|
$205.000
|
$210.000
|
$209.000
|
$150.000
|
$180.000
|
$190.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
49.600
|
$1,000.000
|
$1,770.000
|
$1,600.000
|
$1,150.000
|
$900.000
|
$1,000.000
|
$1,050.000
|
$1,100.000
|
$1,785.000
|
$653.000
|
$1,200.000
|
$2,000.000
|
$1,500.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
55.500
|
$1,000.000
|
$1,414.000
|
$1,300.000
|
$1,300.000
|
$921.000
|
$1,250.000
|
$1,050.000
|
$1,400.000
|
$1,365.000
|
$1,181.000
|
$1,400.000
|
$2,000.000
|
$1,600.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
48.000
|
$1,000.000
|
$500.000
|
$1,200.000
|
$925.000
|
$990.000
|
$1,250.000
|
$900.000
|
$1,500.000
|
$1,155.000
|
$1,168.000
|
$1,400.000
|
$3,000.000
|
$1,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
11,340.000
|
$20.000
|
$18.000
|
$24.000
|
$23.000
|
$15.220
|
$22.000
|
$22.000
|
$21.500
|
$24.680
|
$21.100
|
$24.000
|
$25.000
|
$27.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
64.200
|
$485.000
|
$500.000
|
$610.000
|
$725.000
|
$472.000
|
$475.000
|
$540.000
|
$550.000
|
$735.000
|
$571.000
|
$600.000
|
$3,000.000
|
$475.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,608.000
|
$135.000
|
$135.000
|
$125.000
|
$164.850
|
$115.000
|
$138.000
|
$160.000
|
$140.000
|
$210.000
|
$146.000
|
$165.000
|
$150.000
|
$165.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
1,179.900
|
$130.000
|
$100.000
|
$110.000
|
$110.000
|
$102.000
|
$94.000
|
$65.000
|
$122.000
|
$126.000
|
$132.000
|
$100.000
|
$140.000
|
$110.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
65.000
|
$485.000
|
$400.000
|
$500.000
|
$485.000
|
$450.000
|
$350.000
|
$550.000
|
$500.000
|
$525.000
|
$527.000
|
$500.000
|
$500.000
|
$470.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
772.000
|
$100.000
|
$100.000
|
$155.000
|
$127.000
|
$110.000
|
$104.000
|
$140.000
|
$120.000
|
$147.000
|
$105.000
|
$110.000
|
$125.000
|
$80.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
83.000
|
$90.000
|
$100.000
|
$100.000
|
$70.000
|
$85.000
|
$85.000
|
$95.000
|
$110.000
|
$63.000
|
$101.000
|
$80.000
|
$90.000
|
$82.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
180.000
|
$700.000
|
$405.000
|
$1,100.000
|
$611.000
|
$516.000
|
$525.000
|
$900.000
|
$535.000
|
$630.000
|
$628.500
|
$650.000
|
$450.000
|
$700.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
55.000
|
$150.000
|
$90.000
|
$150.000
|
$120.000
|
$50.000
|
$90.000
|
$140.000
|
$88.000
|
$84.000
|
$162.000
|
$100.000
|
$75.000
|
$120.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$32,000.000
|
$32,656.000
|
$42,500.000
|
$38,000.000
|
$35,500.000
|
$23,000.000
|
$60,000.000
|
$32,000.000
|
$42,000.000
|
$35,325.000
|
$30,000.000
|
$30,000.000
|
$34,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,100.000
|
$1,000.000
|
$2,300.000
|
$900.000
|
$850.000
|
$780.000
|
$3,500.000
|
$850.000
|
$840.000
|
$3,723.000
|
$2,000.000
|
$1,000.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,200.000
|
$1,200.000
|
$2,500.000
|
$1,100.000
|
$600.000
|
$950.000
|
$3,800.000
|
$1,000.000
|
$945.000
|
$4,143.000
|
$3,000.000
|
$1,100.000
|
$1,600.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$600.000
|
$250.000
|
$500.000
|
$210.000
|
$700.000
|
$350.000
|
$100.000
|
$200.000
|
$210.000
|
$248.000
|
$500.000
|
$500.000
|
$340.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,500.000
|
$500.000
|
$1,000.000
|
$2,550.000
|
$1,700.000
|
$1,400.000
|
$4,500.000
|
$4,500.000
|
$1,575.000
|
$882.000
|
$8,000.000
|
$1,500.000
|
$1,600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
53.000
|
$55.000
|
$10.000
|
$40.000
|
$17.000
|
$15.000
|
$14.000
|
$35.000
|
$35.000
|
$16.800
|
$27.000
|
$40.000
|
$20.000
|
$17.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
148.000
|
$50.000
|
$50.000
|
$175.000
|
$72.000
|
$49.000
|
$100.000
|
$120.000
|
$150.000
|
$63.000
|
$127.000
|
$135.000
|
$60.000
|
$75.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$50,000.000
|
$50,000.000
|
$25,000.000
|
$42,000.000
|
$120,000.000
|
$290,680.000
|
$49,000.000
|
$53,250.000
|
$21,000.000
|
$40,685.000
|
$35,000.000
|
$55,000.000
|
$200,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$328,195.910
|
$500,000.000
|
$318,000.000
|
$320,000.000
|
$310,000.000
|
$371,000.000
|
$370,000.000
|
$368,000.000
|
$350,000.000
|
$383,000.000
|
$395,000.000
|
$500,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$3,000.000
|
$1,075.000
|
$2,500.000
|
$2,000.000
|
$2,000.000
|
$6,000.000
|
$3,600.000
|
$3,000.000
|
$13,650.000
|
$6,900.000
|
$3,500.000
|
$8,500.000
|
$9,900.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$30.000
|
$20.000
|
$28.000
|
$21.300
|
$25.000
|
$22.000
|
$30.000
|
$21.750
|
$23.630
|
$20.000
|
$20.000
|
$35.000
|
$25.770
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$15.000
|
$10.000
|
$5.000
|
$2.130
|
$11.000
|
$9.000
|
$10.000
|
$9.000
|
$10.500
|
$10.000
|
$10.000
|
$10.000
|
$13.110
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
657.000
|
$24.000
|
$18.000
|
$25.000
|
$19.330
|
$19.000
|
$20.000
|
$25.000
|
$19.500
|
$18.900
|
$18.150
|
$20.000
|
$35.000
|
$23.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
657.000
|
$8.500
|
$10.000
|
$1.000
|
$3.190
|
$5.000
|
$8.000
|
$15.000
|
$8.500
|
$10.500
|
$9.000
|
$5.000
|
$10.000
|
$7.780
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,100.000
|
$2.500
|
$2.000
|
$1.350
|
$2.130
|
$2.200
|
$2.200
|
$3.000
|
$2.200
|
$1.520
|
$2.000
|
$2.250
|
$3.000
|
$2.040
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,100.000
|
$0.800
|
$1.000
|
$0.100
|
$0.960
|
$1.200
|
$0.900
|
$1.000
|
$1.050
|
$0.110
|
$1.000
|
$1.000
|
$1.000
|
$0.400
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,785.000
|
$80.000
|
$19.000
|
$32.500
|
$41.000
|
$3.000
|
$32.000
|
$40.000
|
$85.000
|
$42.000
|
$125.000
|
$80.000
|
$65.000
|
$22.950
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,160.000
|
$40.000
|
$85.000
|
$25.000
|
$33.010
|
$65.000
|
$35.000
|
$40.000
|
$31.000
|
$31.500
|
$10.000
|
$85.000
|
$30.000
|
$40.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,310.000
|
$10.000
|
$10.000
|
$10.000
|
$6.390
|
$25.000
|
$7.000
|
$6.000
|
$5.000
|
$3.150
|
$8.000
|
$8.000
|
$5.000
|
$5.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,160.000
|
$15.000
|
$20.000
|
$5.000
|
$8.520
|
$25.000
|
$7.000
|
$7.000
|
$10.000
|
$6.300
|
$6.500
|
$35.000
|
$9.000
|
$10.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
488.000
|
$73.000
|
$50.000
|
$30.000
|
$37.000
|
$50.000
|
$22.000
|
$20.000
|
$40.000
|
$42.000
|
$27.000
|
$40.000
|
$40.000
|
$27.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
800.000
|
$19.500
|
$20.000
|
$19.000
|
$20.230
|
$25.000
|
$19.250
|
$22.000
|
$19.500
|
$19.270
|
$23.500
|
$20.000
|
$25.000
|
$19.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,500.000
|
$1,500.000
|
$1,650.000
|
$1,757.120
|
$1,875.000
|
$1,500.000
|
$1,500.000
|
$1,495.000
|
$1,726.170
|
$1,909.000
|
$1,700.000
|
$1,650.000
|
$1,475.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
808.000
|
$4.000
|
$2.000
|
$3.000
|
$3.190
|
$3.100
|
$2.500
|
$5.000
|
$240.000
|
$2.360
|
$4.100
|
$3.000
|
$4.000
|
$1.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$190.000
|
$150.000
|
$250.000
|
$266.230
|
$255.000
|
$136.000
|
$300.000
|
$150.000
|
$387.670
|
$255.100
|
$300.000
|
$275.000
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,200.000
|
$3,000.000
|
$2,350.000
|
$2,502.560
|
$3,000.000
|
$2,700.000
|
$2,700.000
|
$2,600.000
|
$2,572.500
|
$2,705.000
|
$2,500.000
|
$2,750.000
|
$2,450.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$250.000
|
$200.000
|
$250.000
|
$266.230
|
$255.000
|
$275.000
|
$300.000
|
$250.000
|
$236.250
|
$256.000
|
$300.000
|
$300.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
12.000
|
$1,000.000
|
$795.000
|
$1,000.000
|
$1,277.900
|
$3,000.000
|
$860.000
|
$4,000.000
|
$1,385.000
|
$1,155.000
|
$1,497.000
|
$2,500.000
|
$1,600.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
7.000
|
$825.000
|
$500.000
|
$500.000
|
$1,597.380
|
$2,000.000
|
$500.000
|
$850.000
|
$750.000
|
$630.000
|
$806.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
7.000
|
$8,000.000
|
$7,250.000
|
$10,000.000
|
$7,454.440
|
$9,500.000
|
$7,600.000
|
$12,000.000
|
$8,200.000
|
$8,400.000
|
$8,492.000
|
$9,000.000
|
$9,100.000
|
$8,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$450.000
|
$500.000
|
$500.000
|
$532.460
|
$480.000
|
$550.000
|
$450.000
|
$510.020
|
$498.750
|
$485.000
|
$550.000
|
$550.000
|
$475.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$600.000
|
$600.000
|
$500.000
|
$532.460
|
$550.000
|
$550.000
|
$500.000
|
$630.000
|
$551.250
|
$536.000
|
$550.000
|
$700.000
|
$525.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$32.000
|
$20.000
|
$15.000
|
$15.970
|
$20.000
|
$26.000
|
$14.000
|
$21.000
|
$15.750
|
$15.500
|
$20.000
|
$20.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
|
EA
|
24.000
|
$28.000
|
$20.000
|
$20.000
|
$21.300
|
$34.000
|
$26.000
|
$14.000
|
$19.000
|
$24.150
|
$15.500
|
$20.000
|
$20.000
|
$15.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
2.000
|
$55.000
|
$40.000
|
$50.000
|
$53.250
|
$45.000
|
$55.000
|
$40.000
|
$85.000
|
$47.250
|
$46.000
|
$50.000
|
$80.000
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,626.000
|
$1.000
|
$1.000
|
$1.000
|
$1.060
|
$1.150
|
$1.100
|
$1.500
|
$1.070
|
$1.050
|
$1.020
|
$1.100
|
$1.000
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,626.000
|
$1.000
|
$1.000
|
$1.000
|
$1.060
|
$1.200
|
$1.100
|
$1.500
|
$1.070
|
$1.050
|
$1.020
|
$1.100
|
$1.000
|
$0.750
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,240.000
|
$0.250
|
$0.500
|
$0.500
|
$0.530
|
$0.500
|
$0.550
|
$1.000
|
$0.590
|
$0.530
|
$0.600
|
$0.600
|
$0.350
|
$0.130
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
6,748.000
|
$1.000
|
$1.000
|
$1.000
|
$1.060
|
$1.200
|
$1.100
|
$0.600
|
$1.070
|
$1.050
|
$1.020
|
$1.200
|
$0.500
|
$0.290
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,748.000
|
$1.000
|
$1.000
|
$1.000
|
$1.060
|
$1.200
|
$1.100
|
$0.600
|
$1.070
|
$1.050
|
$1.020
|
$1.200
|
$0.500
|
$0.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
86.000
|
$9.000
|
$8.000
|
$8.000
|
$8.520
|
$8.150
|
$8.500
|
$10.000
|
$10.500
|
$8.400
|
$8.200
|
$15.000
|
$4.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,660.000
|
$1.000
|
$2.000
|
$2.000
|
$2.130
|
$2.250
|
$2.200
|
$5.000
|
$2.200
|
$2.100
|
$2.100
|
$2.500
|
$0.650
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
13,496.000
|
$0.350
|
$0.150
|
$0.150
|
$0.160
|
$0.250
|
$0.170
|
$0.250
|
$0.150
|
$0.160
|
$0.150
|
$0.200
|
$0.150
|
$0.050
|
|
|
FULL - WIDTH MOWING
|
AC
|
7.970
|
$500.000
|
$300.000
|
$200.000
|
$153.350
|
$150.000
|
$155.000
|
$200.000
|
$165.000
|
$189.000
|
$144.000
|
$150.000
|
$500.000
|
$150.000
|
|
|
LITTER REMOVAL
|
AC
|
7.970
|
$500.000
|
$300.000
|
$200.000
|
$1,437.840
|
$489.000
|
$525.000
|
$90.000
|
$250.000
|
$210.000
|
$643.000
|
$150.000
|
$650.000
|
$200.000
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
200.000
|
$50.000
|
$0.250
|
$14.000
|
$26.360
|
$26.000
|
$30.000
|
$30.000
|
$26.100
|
$42.000
|
$26.250
|
$30.000
|
$30.000
|
$43.680
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
200.000
|
$4.000
|
$0.250
|
$6.000
|
$2.400
|
$3.000
|
$2.500
|
$3.000
|
$2.800
|
$15.750
|
$3.500
|
$10.000
|
$10.000
|
$15.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$5,000.000
|
$16,000.000
|
$15,000.000
|
$12,500.000
|
$14,000.000
|
$10,500.000
|
$21,000.000
|
$15,500.000
|
$20,000.000
|
$17,500.000
|
$2,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$5,000.000
|
$10,000.000
|
$5,000.000
|
$39,500.000
|
$5,000.000
|
$20,000.000
|
$7,000.000
|
$15,000.000
|
$11,550.000
|
$22,333.000
|
$20,000.000
|
$17,500.000
|
$3,000.000
|
|
Totals: |
$3,666,125.010
|
$3,324,126.280
|
$3,403,074.960
|
$3,542,196.614
|
$3,559,145.840
|
$3,715,294.330
|
$3,782,231.800
|
$3,797,779.090
|
$4,009,631.880
|
$4,099,268.700
|
$4,120,010.300
|
$4,246,070.150
|
$4,260,673.240
|