|
|
PREPARING ROW
|
STA
|
15.750
|
$9,000.000
|
$10,500.000
|
$1,150.000
|
$350.000
|
$4,094.000
|
$6,500.000
|
|
|
PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
54.000
|
$220.000
|
$550.000
|
$495.000
|
$500.000
|
$800.000
|
$640.000
|
|
|
PREP ROW (TREE) (18"-36" DIA.)
|
EA
|
16.000
|
$600.000
|
$825.000
|
$1,240.000
|
$750.000
|
$1,500.000
|
$1,100.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
794.000
|
$18.000
|
$20.000
|
$16.000
|
$25.000
|
$55.000
|
$33.000
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
4,983.000
|
$15.000
|
$6.000
|
$13.000
|
$10.110
|
$8.500
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,629.000
|
$12.000
|
$20.000
|
$14.500
|
$12.490
|
$12.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
489.000
|
$18.000
|
$20.000
|
$55.000
|
$28.660
|
$9.000
|
$30.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
20,756.000
|
$1.500
|
$0.650
|
$2.000
|
$0.580
|
$0.580
|
$0.750
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
20,756.000
|
$0.250
|
$0.150
|
$0.110
|
$0.440
|
$0.440
|
$0.130
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
2,400.000
|
$0.220
|
$0.390
|
$0.390
|
$0.100
|
$0.100
|
$0.450
|
|
|
VEGETATIVE WATERING
|
MG
|
3,448.800
|
$16.000
|
$2.100
|
$1.000
|
$2.980
|
$1.000
|
$30.000
|
|
|
FL BS (CMP IN PLC)(TYB GR1-2)(FNAL POS)
|
CY
|
39.000
|
$50.000
|
$95.000
|
$180.000
|
$366.080
|
$55.000
|
$240.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
867.000
|
$15.000
|
$24.000
|
$37.000
|
$24.020
|
$18.000
|
$28.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
7,137.000
|
$17.000
|
$24.000
|
$20.500
|
$23.740
|
$36.000
|
$30.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
100.000
|
$170.000
|
$210.000
|
$235.000
|
$188.000
|
$250.000
|
$215.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
7,451.000
|
$6.000
|
$8.000
|
$13.500
|
$2.370
|
$5.000
|
$9.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,416.000
|
$3.400
|
$7.000
|
$6.000
|
$9.360
|
$8.000
|
$2.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
448.000
|
$100.000
|
$151.000
|
$131.000
|
$154.880
|
$150.000
|
$140.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
15.000
|
$200.000
|
$420.000
|
$315.000
|
$253.680
|
$309.000
|
$470.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
217.000
|
$65.000
|
$60.000
|
$53.000
|
$48.000
|
$65.000
|
$64.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
163.000
|
$80.000
|
$80.000
|
$74.000
|
$65.000
|
$75.000
|
$93.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
36.000
|
$100.000
|
$100.000
|
$100.000
|
$90.000
|
$98.000
|
$140.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
7.000
|
$1,200.000
|
$1,000.000
|
$1,050.000
|
$700.000
|
$1,200.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$2,000.000
|
$1,275.000
|
$1,200.000
|
$1,500.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,000.000
|
$2,000.000
|
$1,275.000
|
$1,200.000
|
$1,600.000
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,500.000
|
$2,500.000
|
$2,300.000
|
$2,500.000
|
$3,500.000
|
$2,700.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$300.000
|
$400.000
|
$250.000
|
$200.000
|
$350.000
|
$290.000
|
|
|
REMOV STR (PIPE)
|
LF
|
391.000
|
$15.000
|
$15.000
|
$12.000
|
$15.000
|
$7.000
|
$14.000
|
|
|
REMOV STR (CATTLE GUARD)
|
EA
|
1.000
|
$2,200.000
|
$1,000.000
|
$3,114.040
|
$1,500.000
|
$1,500.000
|
$2,400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,000.000
|
$179,254.770
|
$140,000.000
|
$276,771.000
|
$144,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,000.000
|
$10,500.000
|
$15,000.000
|
$15,000.000
|
$7,550.000
|
$6,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
30.000
|
$30.000
|
$27.500
|
$31.030
|
$40.000
|
$40.000
|
$36.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
30.000
|
$10.000
|
$12.500
|
$9.270
|
$10.000
|
$10.000
|
$10.750
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
200.000
|
$20.000
|
$22.000
|
$23.880
|
$30.000
|
$30.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
200.000
|
$10.000
|
$10.000
|
$6.630
|
$10.000
|
$10.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
235.000
|
$2.000
|
$2.000
|
$5.850
|
$4.000
|
$4.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
235.000
|
$0.500
|
$0.150
|
$1.870
|
$1.000
|
$1.000
|
$3.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,353.000
|
$75.000
|
$75.000
|
$133.000
|
$130.740
|
$159.700
|
$110.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$40.000
|
$25.000
|
$38.000
|
$84.000
|
$99.000
|
$44.250
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$50.000
|
$50.000
|
$38.000
|
$82.000
|
$99.000
|
$44.250
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,080.000
|
$9.000
|
$5.000
|
$10.000
|
$21.000
|
$15.000
|
$15.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$15.000
|
$10.000
|
$10.000
|
$21.000
|
$15.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$10.000
|
$10.000
|
$15.000
|
$21.000
|
$25.000
|
$17.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$15.000
|
$20.000
|
$15.000
|
$21.000
|
$25.000
|
$17.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
249.000
|
$30.000
|
$75.000
|
$75.000
|
$52.320
|
$28.600
|
$75.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
158.000
|
$70.000
|
$150.000
|
$145.000
|
$100.000
|
$145.000
|
$140.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$500.000
|
$874.500
|
$950.000
|
$950.000
|
$950.000
|
$920.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
3.000
|
$600.000
|
$935.000
|
$1,000.000
|
$100.000
|
$1,000.000
|
$990.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
2.000
|
$65.000
|
$220.000
|
$60.000
|
$60.000
|
$150.000
|
$120.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,455.000
|
$1.200
|
$1.100
|
$0.750
|
$0.750
|
$0.750
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,944.000
|
$1.200
|
$1.100
|
$0.750
|
$0.750
|
$0.750
|
$1.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
85.000
|
$8.000
|
$13.200
|
$6.550
|
$6.550
|
$6.550
|
$14.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
2,727.000
|
$0.950
|
$1.650
|
$0.990
|
$0.990
|
$0.990
|
$1.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
2,527.000
|
$0.950
|
$1.650
|
$0.990
|
$0.990
|
$0.990
|
$1.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
19.000
|
$3.000
|
$7.700
|
$4.000
|
$4.000
|
$4.000
|
$8.100
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,742.000
|
$0.500
|
$1.100
|
$0.500
|
$0.500
|
$1.500
|
$1.200
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,000.000
|
$1,000.000
|
$3,700.000
|
$3,500.000
|
$150.000
|
$4,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$2,500.000
|
$1,000.000
|
$4,000.000
|
$3,500.000
|
$1,500.000
|
$2,000.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
105.000
|
$100.000
|
$275.000
|
$255.000
|
$103.800
|
$103.800
|
$150.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
1,296.000
|
$110.000
|
$123.200
|
$111.000
|
$123.000
|
$123.000
|
$110.000
|
|
|
SP MIXES SP-D PG64-22 (LEVEL-UP)
|
TON
|
8.000
|
$90.000
|
$495.000
|
$405.000
|
$152.000
|
$152.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
294.000
|
$5.000
|
$6.000
|
$5.000
|
$7.500
|
$7.500
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$17,000.000
|
$15,000.000
|
$15,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
80.000
|
$200.000
|
$160.000
|
$225.000
|
$150.000
|
$150.000
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$100.000
|
$75.000
|
$55.000
|
$150.000
|
$115.000
|
$50.000
|
|
Totals: |
$1,609,333.800
|
$1,884,000.000
|
$1,979,509.660
|
$2,019,832.394
|
$2,105,165.880
|
$2,115,783.180
|