PREPARING ROW
|
STA
|
361.620
|
$900.000
|
$350.000
|
$140.000
|
$2,600.000
|
$2,770.000
|
$3,800.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
43.000
|
$10.000
|
$55.000
|
$37.000
|
$200.000
|
$20.000
|
$18.570
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
454.000
|
$22.000
|
$30.000
|
$32.000
|
$20.000
|
$20.000
|
$20.510
|
|
|
REMOV CONC (FLUME)
|
SY
|
13.000
|
$25.000
|
$105.000
|
$90.000
|
$100.000
|
$50.000
|
$61.410
|
|
|
RMV (0"-10") TRT/UNTRT BASE & ASPH PAV
|
SY
|
16,932.000
|
$9.500
|
$12.000
|
$20.000
|
$2.520
|
$10.000
|
$9.630
|
|
|
EXCAV (ROADWAY)
|
CY
|
13,224.000
|
$16.000
|
$17.000
|
$23.000
|
$17.000
|
$20.000
|
$15.090
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
17,084.000
|
$20.000
|
$37.000
|
$26.000
|
$30.000
|
$30.000
|
$14.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
361.620
|
$300.000
|
$250.000
|
$800.000
|
$250.000
|
$250.000
|
$166.430
|
|
|
BLADING
|
STA
|
361.620
|
$200.000
|
$55.000
|
$10.000
|
$160.000
|
$250.000
|
$345.830
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
257,068.000
|
$0.950
|
$0.940
|
$0.750
|
$1.080
|
$2.000
|
$1.380
|
|
|
BLOCK SODDING
|
SY
|
6,422.000
|
$3.500
|
$5.850
|
$6.000
|
$4.880
|
$8.000
|
$6.680
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
250,646.000
|
$0.150
|
$0.290
|
$0.100
|
$0.150
|
$0.350
|
$1.600
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
125,324.000
|
$0.100
|
$0.210
|
$0.100
|
$0.150
|
$0.350
|
$1.600
|
|
|
VEGETATIVE WATERING
|
TGL
|
56,887.000
|
$0.750
|
$0.100
|
$0.500
|
$1.000
|
$5.000
|
$0.100
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
15,864.000
|
$120.000
|
$109.000
|
$98.000
|
$150.000
|
$125.000
|
$158.650
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
15,139.000
|
$125.000
|
$116.000
|
$100.000
|
$155.000
|
$145.000
|
$113.500
|
|
|
TACK COAT
|
GAL
|
19,142.000
|
$3.500
|
$3.000
|
$1.000
|
$4.000
|
$6.000
|
$3.850
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
7,398.000
|
$115.000
|
$113.000
|
$90.000
|
$125.000
|
$120.000
|
$115.180
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
105,245.000
|
$2.000
|
$1.850
|
$2.250
|
$2.550
|
$3.500
|
$1.390
|
|
|
CEM STABIL BKFL
|
CY
|
15.000
|
$205.000
|
$800.000
|
$300.000
|
$800.000
|
$350.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
918.000
|
$30.000
|
$60.000
|
$33.000
|
$60.000
|
$85.000
|
$77.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
155.000
|
$495.000
|
$750.000
|
$1,100.000
|
$625.000
|
$550.000
|
$787.430
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
163.000
|
$410.000
|
$755.000
|
$1,000.000
|
$640.000
|
$550.000
|
$837.390
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
107.000
|
$350.000
|
$405.000
|
$500.000
|
$250.000
|
$185.000
|
$444.240
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
8.000
|
$900.000
|
$1,660.000
|
$1,400.000
|
$1,660.000
|
$2,000.000
|
$1,450.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
|
LF
|
19.000
|
$1,400.000
|
$1,750.000
|
$1,900.000
|
$1,750.000
|
$3,000.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,896.000
|
$75.000
|
$50.000
|
$70.000
|
$50.000
|
$85.000
|
$88.120
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
701.000
|
$85.000
|
$65.000
|
$90.000
|
$65.000
|
$95.000
|
$106.550
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
16.000
|
$120.000
|
$150.000
|
$270.000
|
$150.000
|
$120.000
|
$140.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
295.000
|
$180.000
|
$175.000
|
$200.000
|
$175.000
|
$150.000
|
$170.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
16.000
|
$230.000
|
$250.000
|
$340.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
48.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$14,000.000
|
$11,000.000
|
$7,900.000
|
$11,000.000
|
$4,500.000
|
$11,185.300
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$16,000.000
|
$14,500.000
|
$8,400.000
|
$14,500.000
|
$5,000.000
|
$12,906.450
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$18,000.000
|
$22,000.000
|
$11,400.000
|
$22,000.000
|
$8,500.000
|
$19,706.260
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
1.000
|
$11,000.000
|
$9,200.000
|
$7,700.000
|
$9,200.000
|
$5,000.000
|
$9,458.030
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
1.000
|
$15,000.000
|
$11,000.000
|
$7,900.000
|
$11,000.000
|
$6,000.000
|
$10,554.180
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$19,000.000
|
$16,600.000
|
$19,200.000
|
$16,600.000
|
$8,500.000
|
$8,991.910
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
3.000
|
$23,000.000
|
$25,000.000
|
$33,900.000
|
$25,000.000
|
$25,000.000
|
$46,818.080
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
130.000
|
$1,200.000
|
$850.000
|
$900.000
|
$850.000
|
$1,250.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,500.000
|
$965.000
|
$1,900.000
|
$965.000
|
$2,500.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$1,800.000
|
$1,300.000
|
$1,400.000
|
$1,300.000
|
$2,500.000
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,350.000
|
$2,600.000
|
$1,350.000
|
$3,000.000
|
$1,590.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
21.000
|
$3,000.000
|
$2,500.000
|
$3,700.000
|
$2,500.000
|
$4,000.000
|
$4,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$6,000.000
|
$3,745.000
|
$4,400.000
|
$3,745.000
|
$4,000.000
|
$9,100.000
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$3,600.000
|
$6,800.000
|
$3,600.000
|
$6,500.000
|
$8,440.190
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$7,900.000
|
$4,620.000
|
$5,700.000
|
$4,620.000
|
$7,500.000
|
$8,100.050
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
15.000
|
$2,500.000
|
$2,500.000
|
$2,000.000
|
$2,500.000
|
$1,500.000
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
38.000
|
$600.000
|
$200.000
|
$300.000
|
$200.000
|
$500.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$2,300.000
|
$1,200.000
|
$2,300.000
|
$1,200.000
|
$2,500.000
|
$500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
30.000
|
$2,000.000
|
$800.000
|
$1,200.000
|
$800.000
|
$2,500.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,691.000
|
$30.000
|
$8.000
|
$32.000
|
$8.000
|
$50.000
|
$12.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
8.000
|
$500.000
|
$100.000
|
$1,500.000
|
$100.000
|
$200.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$952,230.210
|
$800,000.000
|
$1,115,000.000
|
$1,035,000.000
|
$1,300,000.000
|
$1,515,111.640
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$25,000.000
|
$24,000.000
|
$20,000.000
|
$31,000.000
|
$8,500.000
|
$35,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$18,000.000
|
$25,000.000
|
$20,000.000
|
$20,000.000
|
$28,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$250.000
|
$405.000
|
$280.000
|
$2,100.000
|
$250.000
|
$453.530
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
250.000
|
$55.000
|
$110.000
|
$34.000
|
$150.000
|
$55.000
|
$1.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
475.000
|
$45.000
|
$87.000
|
$80.000
|
$87.000
|
$50.000
|
$70.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
475.000
|
$12.000
|
$16.000
|
$20.000
|
$16.000
|
$20.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
172.000
|
$32.000
|
$36.080
|
$35.000
|
$36.080
|
$50.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
172.000
|
$10.000
|
$12.000
|
$10.000
|
$12.000
|
$20.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
21,153.000
|
$3.000
|
$3.380
|
$4.000
|
$3.380
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
21,153.000
|
$0.500
|
$1.000
|
$1.200
|
$1.000
|
$2.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,575.000
|
$3.500
|
$3.500
|
$7.000
|
$3.500
|
$18.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,575.000
|
$1.000
|
$1.000
|
$1.200
|
$1.000
|
$9.000
|
$0.500
|
|
|
INTERSECTIONS (ACP)
|
SY
|
728.000
|
$55.000
|
$35.000
|
$17.000
|
$72.650
|
$50.000
|
$66.010
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
542.000
|
$125.000
|
$130.000
|
$120.000
|
$115.000
|
$150.000
|
$129.620
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,945.000
|
$55.000
|
$58.000
|
$60.000
|
$78.560
|
$45.000
|
$86.200
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
76,844.000
|
$0.250
|
$0.260
|
$0.080
|
$0.250
|
$0.500
|
$0.080
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
38,235.000
|
$0.250
|
$0.260
|
$0.080
|
$0.250
|
$0.500
|
$0.080
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,312.500
|
$25.000
|
$22.500
|
$31.000
|
$22.500
|
$28.000
|
$22.500
|
|
|
SHORT RADIUS (28")
|
LF
|
61.000
|
$215.000
|
$25.000
|
$80.000
|
$25.000
|
$100.000
|
$25.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$750.000
|
$1,000.000
|
$1,400.000
|
$1,000.000
|
$1,850.000
|
$2,508.460
|
|
|
MTL BM GD FEN TRANS (31"-28")(25')
|
EA
|
2.000
|
$250.000
|
$550.000
|
$1,100.000
|
$550.000
|
$2,500.000
|
$2,058.460
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$3,400.000
|
$2,850.000
|
$3,500.000
|
$2,850.000
|
$3,250.000
|
$2,850.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
38.000
|
$310.000
|
$200.000
|
$240.000
|
$203.000
|
$850.000
|
$225.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
6.000
|
$350.000
|
$220.000
|
$270.000
|
$223.000
|
$850.000
|
$240.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$715.000
|
$500.000
|
$600.000
|
$508.000
|
$850.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
119.000
|
$615.000
|
$590.000
|
$700.000
|
$600.000
|
$1,250.000
|
$630.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
13.000
|
$725.000
|
$675.000
|
$800.000
|
$687.000
|
$1,250.000
|
$740.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$850.000
|
$675.000
|
$800.000
|
$687.000
|
$1,250.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,125.000
|
$800.000
|
$1,000.000
|
$814.000
|
$1,250.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$1,500.000
|
$995.000
|
$1,200.000
|
$1,012.000
|
$1,250.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$1,100.000
|
$990.000
|
$1,200.000
|
$1,007.000
|
$1,250.000
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$380.000
|
$500.000
|
$600.000
|
$509.000
|
$1,100.000
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$700.000
|
$600.000
|
$700.000
|
$610.000
|
$1,100.000
|
$550.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
|
EA
|
30.000
|
$50.000
|
$25.000
|
$50.000
|
$86.000
|
$100.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
30.000
|
$53.000
|
$45.000
|
$100.000
|
$56.000
|
$100.000
|
$60.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
80.000
|
$1.000
|
$3.500
|
$2.500
|
$1.000
|
$5.000
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,170.000
|
$1.000
|
$1.500
|
$2.500
|
$1.000
|
$5.000
|
$3.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
138.000
|
$1.500
|
$1.500
|
$1.800
|
$4.000
|
$3.000
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
75.000
|
$1.100
|
$1.000
|
$1.200
|
$3.000
|
$3.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
217.000
|
$7.000
|
$8.000
|
$9.750
|
$13.200
|
$20.000
|
$8.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
12.000
|
$35.000
|
$59.000
|
$70.000
|
$100.000
|
$500.000
|
$59.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
108.000
|
$3.200
|
$4.000
|
$5.000
|
$6.000
|
$6.000
|
$4.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
5,053.000
|
$0.250
|
$0.180
|
$0.200
|
$0.330
|
$3.000
|
$0.180
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
80,742.000
|
$0.650
|
$0.630
|
$0.800
|
$0.570
|
$0.750
|
$0.630
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
5,620.000
|
$0.650
|
$0.630
|
$0.800
|
$0.670
|
$1.000
|
$0.630
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
55,011.000
|
$0.650
|
$0.630
|
$0.800
|
$0.570
|
$0.750
|
$0.630
|
|
REFL PAV MRKR TY I-C
|
EA
|
21.000
|
$3.500
|
$4.200
|
$5.000
|
$10.000
|
$6.000
|
$4.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,018.000
|
$4.100
|
$4.200
|
$5.000
|
$6.450
|
$6.000
|
$4.200
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
5,053.000
|
$0.250
|
$0.600
|
$0.700
|
$0.750
|
$2.000
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,053.000
|
$0.100
|
$0.080
|
$0.100
|
$0.100
|
$3.000
|
$0.080
|
|
|
FULL - WIDTH MOWING
|
CYC
|
8.000
|
$2,500.000
|
$4,000.000
|
$4,300.000
|
$5,000.000
|
$2,000.000
|
$7,745.760
|
|
Totals: |
$10,474,532.260
|
$9,988,205.610
|
$10,042,874.720
|
$12,953,797.340
|
$13,120,185.650
|
$13,773,742.251
|