PREPARING ROW
|
STA
|
340.040
|
$700.000
|
$400.000
|
$400.000
|
$2,100.000
|
$1,212.000
|
$6,273.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
419.000
|
$17.000
|
$29.000
|
$39.000
|
$18.000
|
$25.000
|
$15.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,904.000
|
$18.000
|
$18.500
|
$25.000
|
$23.000
|
$35.000
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
13,990.000
|
$6.000
|
$10.000
|
$11.000
|
$6.000
|
$20.000
|
$7.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0"-10")
|
SY
|
7,557.000
|
$4.000
|
$9.500
|
$21.500
|
$6.390
|
$20.000
|
$51.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
14,941.000
|
$14.000
|
$20.000
|
$21.000
|
$15.000
|
$10.000
|
$151.750
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
20,200.000
|
$20.000
|
$13.000
|
$41.000
|
$20.000
|
$42.000
|
$200.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
340.040
|
$220.000
|
$300.000
|
$375.000
|
$220.000
|
$400.000
|
$4,500.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
269,754.000
|
$0.980
|
$0.250
|
$0.900
|
$1.040
|
$1.000
|
$0.450
|
|
|
BLOCK SODDING
|
SY
|
11,903.000
|
$3.500
|
$6.200
|
$3.840
|
$4.450
|
$6.000
|
$15.090
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
257,851.000
|
$0.150
|
$0.150
|
$0.220
|
$0.260
|
$0.170
|
$0.100
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
128,926.000
|
$0.100
|
$0.150
|
$0.210
|
$0.240
|
$0.150
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
60,188.000
|
$0.800
|
$1.000
|
$0.100
|
$0.010
|
$2.100
|
$0.010
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
2,000.000
|
$130.000
|
$110.000
|
$117.000
|
$140.000
|
$225.000
|
$119.420
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
91,688.000
|
$2.000
|
$2.500
|
$2.600
|
$2.390
|
$5.000
|
$2.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,632.000
|
$30.000
|
$10.000
|
$23.000
|
$27.000
|
$115.000
|
$65.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
41.000
|
$550.000
|
$1,100.000
|
$700.000
|
$600.000
|
$800.000
|
$900.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
287.000
|
$350.000
|
$480.000
|
$255.000
|
$215.000
|
$525.000
|
$250.000
|
|
|
CONC BOX CULV (10 FT X 4 FT)
|
LF
|
22.000
|
$1,200.000
|
$1,700.000
|
$1,180.000
|
$1,180.000
|
$2,500.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,413.000
|
$64.000
|
$97.000
|
$52.000
|
$52.000
|
$85.000
|
$65.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,846.000
|
$85.000
|
$130.000
|
$74.000
|
$74.000
|
$105.000
|
$140.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
76.000
|
$120.000
|
$190.000
|
$95.000
|
$95.000
|
$165.000
|
$195.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
240.000
|
$180.000
|
$240.000
|
$135.000
|
$135.000
|
$180.000
|
$245.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
152.000
|
$300.000
|
$460.000
|
$225.000
|
$225.000
|
$450.000
|
$350.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
3.000
|
$500.000
|
$860.000
|
$390.000
|
$390.000
|
$1,100.000
|
$425.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
238.000
|
$600.000
|
$570.000
|
$345.000
|
$345.000
|
$750.000
|
$450.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 54 IN)
|
EA
|
1.000
|
$21,000.000
|
$16,000.000
|
$10,500.000
|
$10,500.000
|
$13,355.000
|
$20,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$18,000.000
|
$20,000.000
|
$9,800.000
|
$9,800.000
|
$16,205.000
|
$18,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
4.000
|
$20,000.000
|
$30,000.000
|
$13,300.000
|
$13,300.000
|
$20,665.000
|
$28,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$15,000.000
|
$45,000.000
|
$19,600.000
|
$19,600.000
|
$27,950.000
|
$18,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
2.000
|
$17,000.000
|
$31,000.000
|
$22,400.000
|
$22,400.000
|
$22,025.000
|
$30,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$22,000.000
|
$20,000.000
|
$12,600.000
|
$12,600.000
|
$17,250.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
140.000
|
$1,150.000
|
$1,700.000
|
$1,180.000
|
$1,180.000
|
$1,250.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$3,500.000
|
$1,105.000
|
$1,105.000
|
$4,000.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
106.000
|
$1,800.000
|
$2,500.000
|
$1,465.000
|
$1,465.000
|
$1,700.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$5,000.000
|
$1,475.000
|
$1,475.000
|
$7,500.000
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$5,000.000
|
$1,740.000
|
$1,740.000
|
$8,000.000
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$3,500.000
|
$5,500.000
|
$4,000.000
|
$4,000.000
|
$5,000.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$6,000.000
|
$4,100.000
|
$4,100.000
|
$10,000.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$6,000.000
|
$7,600.000
|
$4,800.000
|
$4,800.000
|
$11,000.000
|
$4,500.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$7,900.000
|
$7,100.000
|
$5,800.000
|
$5,800.000
|
$11,000.000
|
$5,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$11,500.000
|
$10,300.000
|
$6,800.000
|
$6,800.000
|
$12,000.000
|
$6,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$2,500.000
|
$2,700.000
|
$1,500.000
|
$1,500.000
|
$3,000.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
120.000
|
$600.000
|
$50.000
|
$150.000
|
$150.000
|
$500.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,300.000
|
$5,000.000
|
$1,000.000
|
$1,000.000
|
$5,000.000
|
$2,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
13.000
|
$2,000.000
|
$1,000.000
|
$800.000
|
$800.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4,257.000
|
$30.000
|
$30.000
|
$10.000
|
$10.000
|
$20.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
2.000
|
$120.000
|
$2,000.000
|
$500.000
|
$500.000
|
$2,500.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$852,135.000
|
$1,100,000.000
|
$805,000.000
|
$1,050,000.000
|
$1,239,000.000
|
$2,133,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$14,000.000
|
$35,000.000
|
$28,500.000
|
$25,000.000
|
$52,500.000
|
$147,800.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,415.000
|
$32.000
|
$46.000
|
$35.070
|
$35.070
|
$50.000
|
$55.070
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,415.000
|
$12.000
|
$20.250
|
$8.000
|
$8.000
|
$25.000
|
$18.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$32.000
|
$10.000
|
$33.380
|
$33.380
|
$35.000
|
$33.380
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$10.000
|
$1.000
|
$15.000
|
$15.000
|
$15.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,900.000
|
$3.000
|
$4.900
|
$3.500
|
$3.500
|
$3.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,900.000
|
$0.500
|
$1.800
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,163.000
|
$3.500
|
$7.400
|
$3.900
|
$3.900
|
$5.000
|
$3.900
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,163.000
|
$1.000
|
$1.800
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
12,829.000
|
$50.000
|
$55.000
|
$64.000
|
$65.840
|
$70.000
|
$59.710
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
1,587.000
|
$125.000
|
$120.000
|
$126.000
|
$110.000
|
$140.000
|
$95.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
61,630.000
|
$0.210
|
$0.150
|
$0.250
|
$0.250
|
$0.150
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
34,315.000
|
$0.210
|
$0.150
|
$0.250
|
$0.250
|
$0.150
|
$0.100
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
58.000
|
$300.000
|
$310.000
|
$255.000
|
$250.000
|
$268.750
|
$305.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
7.000
|
$700.000
|
$760.000
|
$630.000
|
$675.000
|
$725.630
|
$810.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$615.000
|
$780.000
|
$650.000
|
$635.000
|
$682.630
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$850.000
|
$900.000
|
$750.000
|
$768.000
|
$825.600
|
$810.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$1,150.000
|
$1,100.000
|
$925.000
|
$1,125.000
|
$1,209.380
|
$1,215.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
26.000
|
$54.000
|
$72.000
|
$60.000
|
$60.000
|
$64.500
|
$89.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,806.000
|
$1.000
|
$3.800
|
$1.200
|
$0.820
|
$5.250
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
27.000
|
$1.500
|
$2.100
|
$1.700
|
$1.700
|
$11.000
|
$1.550
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
311.000
|
$8.000
|
$8.600
|
$7.100
|
$7.100
|
$20.000
|
$10.850
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,420.000
|
$0.250
|
$0.220
|
$0.180
|
$0.180
|
$1.100
|
$0.300
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
96,560.000
|
$0.650
|
$0.800
|
$0.660
|
$0.660
|
$0.800
|
$0.670
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
6,560.000
|
$0.600
|
$0.900
|
$0.740
|
$0.740
|
$0.900
|
$0.690
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
30,622.000
|
$0.600
|
$0.800
|
$0.660
|
$0.660
|
$0.800
|
$0.670
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
713.000
|
$4.300
|
$6.000
|
$5.000
|
$5.000
|
$10.000
|
$5.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,420.000
|
$0.300
|
$0.450
|
$0.360
|
$0.360
|
$6.300
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,420.000
|
$0.100
|
$0.020
|
$0.020
|
$0.020
|
$1.100
|
$0.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$5,000.000
|
$2,500.000
|
$6,000.000
|
$5,000.000
|
$15,000.000
|
$12,500.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
14,943.000
|
$120.000
|
$105.000
|
$115.000
|
$147.000
|
$120.000
|
$131.350
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
12,784.000
|
$125.000
|
$106.000
|
$121.000
|
$160.000
|
$123.000
|
$131.350
|
|
|
TACK COAT
|
GAL
|
16,519.000
|
$3.560
|
$1.000
|
$4.500
|
$4.000
|
$1.000
|
$1.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$20,000.000
|
$24,000.000
|
$18,000.000
|
$8,400.000
|
$35,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$230.000
|
$250.000
|
$400.000
|
$2,200.000
|
$175.000
|
$320.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
200.000
|
$55.000
|
$35.000
|
$110.000
|
$159.000
|
$100.000
|
$78.000
|
|
Totals: |
$9,389,253.060
|
$9,863,216.750
|
$9,914,780.960
|
$11,418,477.880
|
$12,606,216.210
|
$22,231,306.840
|