|
|
PREPARING ROW
|
STA
|
199.000
|
$3,500.000
|
$400.000
|
$600.000
|
$825.000
|
$625.000
|
$790.000
|
$1,750.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
228.000
|
$14.000
|
$21.000
|
$15.000
|
$31.500
|
$25.000
|
$20.500
|
$50.000
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
2,899.000
|
$6.000
|
$8.320
|
$5.500
|
$21.000
|
$11.500
|
$18.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,563.000
|
$9.300
|
$12.410
|
$18.000
|
$1.000
|
$18.500
|
$8.750
|
$25.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
199.000
|
$140.000
|
$179.160
|
$445.000
|
$800.000
|
$550.000
|
$335.000
|
$500.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
11,573.000
|
$11.680
|
$13.620
|
$20.250
|
$1.000
|
$36.000
|
$39.000
|
$5.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
199.000
|
$165.000
|
$204.760
|
$290.000
|
$150.000
|
$400.000
|
$275.000
|
$1,000.000
|
|
|
BLADING
|
STA
|
199.000
|
$150.000
|
$220.110
|
$225.000
|
$25.000
|
$170.000
|
$120.000
|
$10.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
199.000
|
$150.000
|
$220.110
|
$250.000
|
$25.000
|
$170.000
|
$120.000
|
$10.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
115,055.000
|
$1.200
|
$1.000
|
$1.200
|
$0.750
|
$1.000
|
$0.970
|
$2.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
86,291.000
|
$0.300
|
$0.140
|
$0.330
|
$0.160
|
$0.140
|
$0.120
|
$0.050
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
115,055.000
|
$0.180
|
$0.140
|
$0.250
|
$0.200
|
$0.140
|
$0.260
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
29,952.000
|
$8.000
|
$0.500
|
$1.000
|
$1.050
|
$1.000
|
$0.010
|
$10.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
68,510.000
|
$15.080
|
$20.280
|
$18.000
|
$26.500
|
$28.000
|
$28.500
|
$28.000
|
|
|
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
|
CY
|
5,894.000
|
$70.000
|
$76.120
|
$60.000
|
$81.000
|
$77.000
|
$53.000
|
$75.000
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
SY
|
53,040.000
|
$1.460
|
$2.170
|
$3.100
|
$1.250
|
$2.300
|
$2.000
|
$5.000
|
|
|
CEMENT
|
TON
|
354.000
|
$210.000
|
$217.000
|
$260.000
|
$300.000
|
$260.000
|
$250.000
|
$250.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
70,720.000
|
$1.400
|
$2.190
|
$2.750
|
$2.000
|
$3.750
|
$2.750
|
$3.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
13,702.000
|
$4.740
|
$4.720
|
$6.000
|
$5.750
|
$7.500
|
$5.000
|
$7.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
16,575.000
|
$5.000
|
$5.130
|
$6.000
|
$4.300
|
$4.300
|
$6.850
|
$4.250
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
13,923.000
|
$5.660
|
$5.700
|
$6.500
|
$5.250
|
$5.050
|
$7.250
|
$7.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
632.000
|
$230.000
|
$83.800
|
$235.000
|
$190.000
|
$175.000
|
$400.000
|
$225.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
48,620.000
|
$2.500
|
$1.260
|
$2.750
|
$2.100
|
$1.900
|
$3.100
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
460.000
|
$105.000
|
$199.500
|
$225.000
|
$225.000
|
$190.000
|
$215.000
|
$220.000
|
|
|
CUT & RESTORING PAV
|
SY
|
330.000
|
$110.000
|
$63.000
|
$125.000
|
$100.000
|
$210.000
|
$70.000
|
$70.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
426.000
|
$2.530
|
$1.050
|
$15.000
|
$5.000
|
$1.000
|
$1.150
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,278.000
|
$33.580
|
$35.000
|
$35.000
|
$95.000
|
$23.000
|
$32.000
|
$35.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
15.000
|
$471.000
|
$577.500
|
$800.000
|
$735.000
|
$750.000
|
$600.000
|
$700.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
197.000
|
$180.000
|
$431.000
|
$158.000
|
$250.000
|
$296.000
|
$250.000
|
$275.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
70.000
|
$300.000
|
$498.750
|
$500.000
|
$400.000
|
$375.000
|
$550.000
|
$750.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
109.000
|
$526.000
|
$892.500
|
$1,000.000
|
$800.000
|
$750.000
|
$1,000.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
93.000
|
$90.000
|
$82.950
|
$85.000
|
$135.000
|
$74.000
|
$91.000
|
$100.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
466.000
|
$117.610
|
$120.750
|
$115.000
|
$262.000
|
$105.000
|
$133.000
|
$140.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
124.000
|
$140.000
|
$174.300
|
$145.000
|
$236.000
|
$146.000
|
$192.000
|
$150.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
271.000
|
$160.000
|
$231.000
|
$245.000
|
$378.000
|
$200.000
|
$250.000
|
$275.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
617.000
|
$97.000
|
$68.250
|
$80.000
|
$98.000
|
$60.000
|
$74.000
|
$80.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
313.000
|
$140.000
|
$110.250
|
$140.000
|
$129.000
|
$92.000
|
$120.000
|
$130.000
|
|
|
WINGWALL (FW - S) (HW=3 FT)
|
EA
|
2.000
|
$9,000.000
|
$3,150.000
|
$10,000.000
|
$10,000.000
|
$3,000.000
|
$3,500.000
|
$5,000.000
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
2.000
|
$15,500.000
|
$19,320.000
|
$21,000.000
|
$20,000.000
|
$18,400.000
|
$21,000.000
|
$30,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$15,000.000
|
$25,410.000
|
$27,500.000
|
$25,000.000
|
$24,200.000
|
$28,000.000
|
$40,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
38.000
|
$1,000.000
|
$761.250
|
$775.000
|
$1,250.000
|
$725.000
|
$830.000
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,100.000
|
$950.250
|
$1,075.000
|
$2,450.000
|
$905.000
|
$1,050.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$1,500.000
|
$1,433.250
|
$1,075.000
|
$1,650.000
|
$1,365.000
|
$1,600.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
20.000
|
$1,550.000
|
$1,438.500
|
$1,475.000
|
$3,750.000
|
$1,370.000
|
$1,600.000
|
$1,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,922.320
|
$2,370.000
|
$3,400.000
|
$6,300.000
|
$2,600.000
|
$3,000.000
|
$4,000.000
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (C)
|
EA
|
10.000
|
$1,500.000
|
$4,515.000
|
$4,900.000
|
$8,000.000
|
$4,300.000
|
$5,000.000
|
$5,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,250.000
|
$735.000
|
$1,500.000
|
$4,000.000
|
$700.000
|
$800.000
|
$1,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
47.000
|
$300.000
|
$262.500
|
$250.000
|
$500.000
|
$250.000
|
$290.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$600,000.000
|
$594,699.000
|
$700,000.000
|
$773,000.000
|
$745,000.000
|
$500,000.000
|
$970,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$5,000.000
|
$16,000.000
|
$2,000.000
|
$27,500.000
|
$13,000.000
|
$15,000.000
|
$35,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
309.000
|
$41.490
|
$55.000
|
$40.000
|
$50.000
|
$55.000
|
$133.000
|
$90.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
309.000
|
$11.310
|
$12.000
|
$8.000
|
$25.000
|
$12.000
|
$25.000
|
$13.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
367.000
|
$25.500
|
$30.000
|
$40.000
|
$20.000
|
$30.000
|
$44.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
367.000
|
$5.120
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$10.700
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,578.000
|
$2.670
|
$4.000
|
$3.900
|
$2.350
|
$4.000
|
$4.460
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,578.000
|
$0.510
|
$1.000
|
$1.000
|
$0.300
|
$1.000
|
$0.890
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,606.000
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$5.450
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,606.000
|
$1.200
|
$1.000
|
$1.250
|
$1.000
|
$1.000
|
$0.890
|
$1.100
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,238.000
|
$45.000
|
$48.500
|
$95.000
|
$57.500
|
$56.000
|
$65.000
|
$75.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,620.000
|
$66.740
|
$48.500
|
$60.000
|
$57.500
|
$63.000
|
$86.000
|
$90.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
228.000
|
$117.760
|
$100.000
|
$145.000
|
$168.000
|
$111.000
|
$115.000
|
$150.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
28,371.000
|
$0.120
|
$0.300
|
$0.280
|
$0.120
|
$0.300
|
$0.350
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
13,625.000
|
$0.150
|
$0.300
|
$0.280
|
$0.120
|
$0.300
|
$0.350
|
$0.200
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
24.000
|
$251.860
|
$250.000
|
$350.000
|
$295.000
|
$250.000
|
$340.000
|
$275.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
2.000
|
$234.760
|
$270.000
|
$325.000
|
$315.000
|
$270.000
|
$340.000
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
2.000
|
$226.000
|
$550.000
|
$325.000
|
$705.000
|
$550.000
|
$700.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
57.000
|
$679.770
|
$630.000
|
$775.000
|
$675.000
|
$630.000
|
$775.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$795.000
|
$740.000
|
$950.000
|
$850.000
|
$740.000
|
$875.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$780.000
|
$1,100.000
|
$1,500.000
|
$1,300.000
|
$1,100.000
|
$1,500.000
|
$1,200.000
|
|
|
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
|
EA
|
24.000
|
$104.000
|
$100.000
|
$93.000
|
$155.000
|
$100.000
|
$29.000
|
$110.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,991.000
|
$1.520
|
$2.250
|
$2.000
|
$3.150
|
$1.850
|
$1.000
|
$8.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
24.000
|
$7.150
|
$15.000
|
$15.000
|
$12.500
|
$15.000
|
$12.000
|
$11.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
32,797.000
|
$0.420
|
$0.490
|
$1.150
|
$0.500
|
$0.490
|
$0.550
|
$0.750
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
6,397.000
|
$0.460
|
$0.680
|
$1.000
|
$0.750
|
$0.680
|
$0.650
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,772.000
|
$0.350
|
$0.570
|
$0.800
|
$0.500
|
$0.570
|
$0.800
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
28,758.000
|
$0.430
|
$0.490
|
$0.650
|
$0.500
|
$0.490
|
$0.550
|
$0.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
506.000
|
$4.270
|
$5.000
|
$7.500
|
$5.250
|
$5.000
|
$5.000
|
$5.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
11,122.000
|
$115.000
|
$110.000
|
$155.000
|
$121.000
|
$122.000
|
$142.000
|
$128.000
|
|
|
TACK COAT
|
GAL
|
4,045.000
|
$3.120
|
$7.300
|
$5.500
|
$7.300
|
$4.250
|
$5.000
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$3,000.000
|
$10,000.000
|
$8,000.000
|
$7,350.000
|
$17,000.000
|
$11,000.000
|
$35,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$115.510
|
$150.000
|
$165.000
|
$73.500
|
$315.000
|
$2,500.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
150.000
|
$64.910
|
$75.000
|
$90.000
|
$73.500
|
$80.000
|
$75.000
|
$500.000
|
|
Totals: |
$6,712,604.340
|
$6,544,754.190
|
$7,525,551.960
|
$7,738,319.280
|
$8,075,577.440
|
$8,714,803.480
|
$9,697,760.300
|