PREPARING ROW
|
STA
|
11.510
|
$26,602.000
|
$1,000.000
|
$5,000.000
|
$6,000.000
|
$29,500.000
|
$29,000.000
|
$1,200.000
|
|
|
PREP ROW (TREE REMOVE) (0"-12" DIA)
|
EA
|
13.000
|
$750.000
|
$1,000.000
|
$1,000.000
|
$750.000
|
$675.000
|
$2,500.000
|
$800.000
|
|
|
PREP ROW (TREE REMOVE) (12"-24" DIA)
|
EA
|
11.000
|
$1,200.000
|
$1,500.000
|
$1,200.000
|
$1,050.000
|
$950.000
|
$5,000.000
|
$1,500.000
|
|
|
REMOV CONC (PAV)
|
SY
|
1,729.000
|
$20.000
|
$40.000
|
$28.000
|
$31.500
|
$26.400
|
$20.000
|
$60.000
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
299.000
|
$30.000
|
$40.000
|
$18.000
|
$12.600
|
$20.000
|
$20.000
|
$32.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
406.000
|
$30.000
|
$40.000
|
$38.000
|
$18.900
|
$17.900
|
$20.000
|
$32.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
776.000
|
$30.000
|
$30.000
|
$20.000
|
$21.000
|
$22.300
|
$20.000
|
$32.000
|
|
|
REMOV CONC (CURB)
|
LF
|
5,166.000
|
$15.000
|
$5.000
|
$8.000
|
$1.000
|
$2.700
|
$20.000
|
$1.500
|
|
|
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,952.000
|
$9.750
|
$30.000
|
$20.000
|
$21.000
|
$20.700
|
$20.000
|
$15.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
5,522.000
|
$25.000
|
$50.000
|
$22.000
|
$21.000
|
$46.600
|
$20.000
|
$44.000
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
117.000
|
$20.000
|
$50.000
|
$55.000
|
$31.500
|
$830.000
|
$50.000
|
$110.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
2,110.000
|
$5.000
|
$5.000
|
$8.000
|
$7.490
|
$9.600
|
$7.000
|
$5.000
|
|
|
BLOCK SODDING
|
SY
|
2,110.000
|
$10.000
|
$10.000
|
$7.000
|
$6.630
|
$9.800
|
$7.000
|
$8.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
2,110.000
|
$3.000
|
$1.300
|
$1.500
|
$1.390
|
$0.500
|
$1.000
|
$1.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
628.000
|
$10.000
|
$70.000
|
$75.000
|
$1.000
|
$30.500
|
$20.000
|
$5.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
|
SY
|
6,160.000
|
$36.520
|
$30.000
|
$45.000
|
$40.000
|
$26.500
|
$32.000
|
$50.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
1,232.000
|
$6.000
|
$10.000
|
$10.500
|
$4.280
|
$9.200
|
$10.000
|
$1.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
1,355.000
|
$165.000
|
$180.000
|
$222.000
|
$155.150
|
$168.000
|
$200.000
|
$170.000
|
|
|
CONC PVMT (CRCP) (9")
|
SY
|
5,112.000
|
$195.000
|
$140.000
|
$130.750
|
$150.000
|
$114.500
|
$150.000
|
$120.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
38.000
|
$360.000
|
$300.000
|
$270.000
|
$630.000
|
$2,500.000
|
$350.000
|
$330.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
121.000
|
$50.000
|
$10.000
|
$4.500
|
$21.000
|
$26.900
|
$10.000
|
$1.250
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$500.000
|
$800.000
|
$850.000
|
$781.420
|
$687.550
|
$650.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
94.000
|
$120.000
|
$80.000
|
$330.000
|
$450.000
|
$159.000
|
$105.000
|
$150.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
27.000
|
$150.000
|
$120.000
|
$550.000
|
$650.000
|
$276.000
|
$250.000
|
$170.000
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
5.000
|
$8,000.000
|
$8,000.000
|
$10,000.000
|
$21,000.000
|
$8,000.000
|
$12,500.000
|
$16,000.000
|
|
|
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
|
EA
|
1.000
|
$10,000.000
|
$5,000.000
|
$10,000.000
|
$18,000.000
|
$6,460.000
|
$12,500.000
|
$18,000.000
|
|
|
ADJUSTING INLETS (CAP)
|
EA
|
2.000
|
$5,000.000
|
$2,000.000
|
$4,500.000
|
$7,500.000
|
$1,615.000
|
$2,500.000
|
$3,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
7.000
|
$1,400.000
|
$2,000.000
|
$2,500.000
|
$2,200.000
|
$612.000
|
$2,500.000
|
$1,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
271.000
|
$25.000
|
$20.000
|
$47.000
|
$30.000
|
$22.000
|
$50.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$304,631.420
|
$300,000.000
|
$340,000.000
|
$473,000.000
|
$385,000.000
|
$400,000.000
|
$440,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$12,000.000
|
$5,000.000
|
$25,000.000
|
$63,000.000
|
$55,000.000
|
$8,500.000
|
$45,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$276.000
|
$1,000.000
|
$185.000
|
$200.000
|
$346.000
|
$250.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$108.000
|
$100.000
|
$80.000
|
$1,000.000
|
$68.000
|
$550.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
72.000
|
$40.000
|
$40.000
|
$150.000
|
$55.000
|
$39.000
|
$50.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
72.000
|
$10.000
|
$10.000
|
$100.000
|
$27.500
|
$30.000
|
$20.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,015.000
|
$5.000
|
$6.000
|
$4.000
|
$3.300
|
$3.500
|
$4.000
|
$4.250
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
342.000
|
$10.000
|
$6.000
|
$9.000
|
$11.000
|
$8.250
|
$8.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,357.000
|
$1.500
|
$1.000
|
$2.250
|
$1.650
|
$1.100
|
$2.000
|
$2.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
342.000
|
$10.000
|
$10.000
|
$8.500
|
$9.900
|
$5.750
|
$18.000
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
342.000
|
$5.000
|
$1.000
|
$3.000
|
$3.300
|
$1.250
|
$9.000
|
$3.250
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
232.000
|
$206.000
|
$120.000
|
$210.000
|
$210.000
|
$84.000
|
$200.000
|
$330.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
3,850.000
|
$20.000
|
$25.000
|
$10.000
|
$9.000
|
$7.600
|
$20.000
|
$15.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
132.000
|
$95.000
|
$20.000
|
$60.000
|
$75.000
|
$50.000
|
$55.000
|
$80.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
151.000
|
$250.000
|
$120.000
|
$180.000
|
$175.000
|
$98.000
|
$125.000
|
$190.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
617.000
|
$95.000
|
$100.000
|
$120.000
|
$90.000
|
$66.000
|
$65.000
|
$110.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
13.000
|
$2,500.000
|
$3,000.000
|
$3,000.000
|
$3,500.000
|
$1,700.000
|
$3,250.000
|
$5,000.000
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
4.000
|
$350.000
|
$500.000
|
$500.000
|
$450.000
|
$500.000
|
$500.000
|
$500.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
190.000
|
$25.000
|
$25.000
|
$28.000
|
$25.570
|
$15.320
|
$40.000
|
$60.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
50.000
|
$35.000
|
$30.000
|
$32.000
|
$29.100
|
$26.670
|
$50.000
|
$60.000
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
615.000
|
$45.000
|
$40.000
|
$46.000
|
$42.800
|
$48.650
|
$80.000
|
$110.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
560.000
|
$2.000
|
$3.000
|
$2.000
|
$1.930
|
$1.760
|
$3.000
|
$6.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,170.000
|
$2.000
|
$3.000
|
$3.250
|
$2.890
|
$2.210
|
$3.000
|
$7.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
885.000
|
$2.200
|
$3.000
|
$3.250
|
$2.890
|
$2.680
|
$3.000
|
$9.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
40.000
|
$2.000
|
$5.000
|
$4.000
|
$3.640
|
$2.750
|
$3.000
|
$9.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$1,500.000
|
$2,500.000
|
$2,500.000
|
$2,187.080
|
$1,668.000
|
$1,500.000
|
$5,000.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$6,000.000
|
$12,000.000
|
$12,000.000
|
$10,833.750
|
$10,659.000
|
$12,500.000
|
$20,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$855.000
|
$600.000
|
$750.000
|
$679.450
|
$689.000
|
$1,500.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$1,500.000
|
$600.000
|
$800.000
|
$715.830
|
$697.000
|
$1,500.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
4.000
|
$687.000
|
$600.000
|
$825.000
|
$765.050
|
$596.000
|
$1,500.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
3.000
|
$700.000
|
$600.000
|
$850.000
|
$786.450
|
$754.000
|
$1,500.000
|
$900.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
6.000
|
$1,200.000
|
$500.000
|
$700.000
|
$652.700
|
$594.000
|
$1,000.000
|
$800.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$1,200.000
|
$500.000
|
$900.000
|
$829.250
|
$625.000
|
$1,000.000
|
$1,000.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
232.000
|
$2.000
|
$3.000
|
$2.250
|
$3.300
|
$3.000
|
$6.000
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,771.000
|
$2.000
|
$2.000
|
$2.000
|
$1.650
|
$1.500
|
$6.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
660.000
|
$10.000
|
$9.000
|
$10.000
|
$7.700
|
$7.000
|
$20.000
|
$11.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
26.000
|
$250.000
|
$250.000
|
$250.000
|
$209.000
|
$190.000
|
$250.000
|
$280.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
25.000
|
$250.000
|
$300.000
|
$300.000
|
$231.000
|
$210.000
|
$250.000
|
$340.000
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
1,258.000
|
$2.000
|
$2.187
|
$2.000
|
$1.100
|
$1.000
|
$1.000
|
$2.250
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
2,480.000
|
$2.000
|
$2.187
|
$2.000
|
$1.100
|
$1.000
|
$1.000
|
$2.250
|
|
|
PAVEMENT SLER 6"
|
LF
|
5,665.000
|
$2.000
|
$0.700
|
$0.550
|
$0.280
|
$0.250
|
$1.000
|
$0.600
|
|
|
PAVEMENT SLER 8"
|
LF
|
4,003.000
|
$2.000
|
$1.000
|
$0.850
|
$0.390
|
$0.350
|
$1.000
|
$1.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
660.000
|
$2.000
|
$3.000
|
$2.250
|
$1.100
|
$1.000
|
$6.000
|
$2.500
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
26.000
|
$100.000
|
$80.000
|
$85.000
|
$27.500
|
$25.000
|
$150.000
|
$90.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
25.000
|
$100.000
|
$80.000
|
$85.000
|
$27.500
|
$25.000
|
$150.000
|
$90.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
1,927.000
|
$2.000
|
$2.000
|
$2.000
|
$1.100
|
$1.000
|
$1.000
|
$2.250
|
|
REFL PAV MRKR TY I-C
|
EA
|
224.000
|
$10.000
|
$7.000
|
$8.000
|
$5.500
|
$5.000
|
$6.000
|
$9.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
5,058.000
|
$1.160
|
$0.800
|
$0.750
|
$0.610
|
$0.550
|
$1.000
|
$0.800
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
3,157.000
|
$2.070
|
$0.800
|
$1.000
|
$1.100
|
$1.000
|
$6.000
|
$1.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
1,124.000
|
$2.630
|
$2.500
|
$2.250
|
$1.650
|
$1.500
|
$8.000
|
$2.500
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
229.000
|
$4.550
|
$4.000
|
$4.000
|
$3.300
|
$3.000
|
$20.000
|
$3.750
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
18.000
|
$110.000
|
$100.000
|
$100.000
|
$71.500
|
$65.000
|
$250.000
|
$110.000
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
1.000
|
$175.000
|
$130.000
|
$135.000
|
$132.000
|
$120.000
|
$500.000
|
$150.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
18.000
|
$150.000
|
$100.000
|
$100.000
|
$71.500
|
$65.000
|
$250.000
|
$110.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,665.000
|
$2.000
|
$0.500
|
$0.500
|
$0.060
|
$0.050
|
$1.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,003.000
|
$2.000
|
$0.600
|
$0.550
|
$0.080
|
$0.070
|
$1.000
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
660.000
|
$5.000
|
$1.700
|
$1.750
|
$0.220
|
$0.200
|
$6.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
26.000
|
$100.000
|
$70.000
|
$68.000
|
$11.000
|
$10.000
|
$150.000
|
$80.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
25.000
|
$100.000
|
$70.000
|
$68.000
|
$11.000
|
$10.000
|
$150.000
|
$80.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$4,000.000
|
$75,000.000
|
$90,000.000
|
$78,639.540
|
$55,430.000
|
$55,000.000
|
$50,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$30,000.000
|
$10,000.000
|
$12,000.000
|
$9,818.110
|
$150,000.000
|
$12,500.000
|
$11,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
12.000
|
$350.000
|
$500.000
|
$500.000
|
$433.350
|
$465.000
|
$325.000
|
$1,300.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
12.000
|
$350.000
|
$500.000
|
$500.000
|
$433.350
|
$473.000
|
$325.000
|
$1,300.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$350.000
|
$500.000
|
$500.000
|
$433.350
|
$465.000
|
$325.000
|
$1,300.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
12.000
|
$350.000
|
$500.000
|
$500.000
|
$433.350
|
$473.000
|
$325.000
|
$1,300.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
12.000
|
$350.000
|
$500.000
|
$500.000
|
$433.350
|
$465.000
|
$325.000
|
$1,300.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$350.000
|
$500.000
|
$500.000
|
$433.350
|
$473.000
|
$325.000
|
$1,300.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$350.000
|
$1,000.000
|
$1,000.000
|
$836.310
|
$879.000
|
$8,500.000
|
$2,200.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
16.000
|
$275.000
|
$250.000
|
$250.000
|
$222.770
|
$286.990
|
$250.000
|
$490.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
4.000
|
$275.000
|
$400.000
|
$400.000
|
$357.270
|
$345.000
|
$300.000
|
$500.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,030.000
|
$2.000
|
$3.500
|
$3.500
|
$3.210
|
$3.930
|
$3.000
|
$6.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
80.000
|
$3.000
|
$5.000
|
$4.500
|
$3.850
|
$5.310
|
$3.000
|
$7.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
1,615.000
|
$3.500
|
$5.000
|
$5.000
|
$4.280
|
$4.630
|
$3.000
|
$11.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
840.000
|
$5.000
|
$8.000
|
$9.000
|
$8.350
|
$8.880
|
$3.000
|
$17.000
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
1,675.000
|
$2.000
|
$3.000
|
$3.000
|
$2.780
|
$4.660
|
$3.000
|
$6.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
4.000
|
$40,000.000
|
$40,000.000
|
$50,000.000
|
$40,464.080
|
$42,502.250
|
$85,000.000
|
$70,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
7.000
|
$3,600.000
|
$4,000.000
|
$4,400.000
|
$3,737.720
|
$4,550.000
|
$6,500.000
|
$9,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
8.000
|
$900.000
|
$1,600.000
|
$2,000.000
|
$1,680.970
|
$844.000
|
$1,850.000
|
$2,900.000
|
|
|
REMOVAL OF TRAFFIC SIGNAL POLE FND
|
LF
|
4.000
|
$500.000
|
$500.000
|
$500.000
|
$392.800
|
$1,586.000
|
$2,500.000
|
$1,800.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
190.000
|
$3.500
|
$5.000
|
$3.500
|
$3.000
|
$3.800
|
$6.000
|
$9.000
|
|
Totals: |
$3,503,880.980
|
$3,143,471.806
|
$3,411,000.450
|
$3,769,012.310
|
$3,822,461.000
|
$3,890,474.000
|
$4,048,467.700
|