PREPARING ROW
|
STA
|
96.000
|
$2,000.000
|
$125.000
|
$5,452.510
|
$650.000
|
$2,675.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
584.000
|
$20.870
|
$24.000
|
$12.240
|
$26.000
|
$21.000
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
4,035.000
|
$13.000
|
$20.000
|
$25.060
|
$16.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,002.000
|
$8.000
|
$5.000
|
$8.170
|
$41.000
|
$8.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
7,019.000
|
$30.000
|
$20.000
|
$13.970
|
$52.000
|
$8.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
96.000
|
$250.000
|
$250.000
|
$406.910
|
$400.000
|
$500.000
|
|
|
BLADING
|
STA
|
103.000
|
$211.000
|
$280.000
|
$218.200
|
$180.000
|
$750.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
46,933.000
|
$1.300
|
$1.000
|
$1.030
|
$1.030
|
$1.050
|
|
|
BLOCK SODDING
|
SY
|
25,361.000
|
$4.750
|
$6.000
|
$3.910
|
$3.910
|
$4.200
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
46,933.000
|
$0.180
|
$0.150
|
$0.210
|
$0.210
|
$0.220
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
36,147.000
|
$0.150
|
$0.150
|
$0.160
|
$0.160
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
16,132.000
|
$2.000
|
$1.000
|
$0.050
|
$1.000
|
$1.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,733.000
|
$120.000
|
$100.000
|
$135.080
|
$130.000
|
$125.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
74,762.000
|
$2.500
|
$3.000
|
$2.800
|
$3.430
|
$3.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,064.000
|
$22.610
|
$54.000
|
$84.190
|
$35.000
|
$125.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
182.000
|
$336.860
|
$420.000
|
$355.100
|
$345.000
|
$400.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
|
LF
|
44.000
|
$903.000
|
$1,500.000
|
$911.320
|
$1,050.000
|
$2,600.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
60.000
|
$1,300.000
|
$1,800.000
|
$1,354.260
|
$1,675.000
|
$2,900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
213.000
|
$75.000
|
$140.000
|
$83.860
|
$64.000
|
$105.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
152.000
|
$89.000
|
$160.000
|
$107.440
|
$85.000
|
$115.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
12.000
|
$166.000
|
$850.000
|
$199.920
|
$300.000
|
$600.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
24.000
|
$448.000
|
$670.000
|
$374.720
|
$425.000
|
$850.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
2.000
|
$19,844.000
|
$17,000.000
|
$18,593.490
|
$10,000.000
|
$16,000.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
2.000
|
$70,000.000
|
$105,000.000
|
$84,242.360
|
$100,000.000
|
$120,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$24,460.000
|
$25,000.000
|
$24,496.230
|
$30,000.000
|
$30,000.000
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
2.000
|
$4,000.000
|
$4,900.000
|
$4,860.290
|
$7,000.000
|
$8,000.000
|
|
|
SET (TY I) (36 IN) (4: 1) (C)
|
EA
|
2.000
|
$10,000.000
|
$5,600.000
|
$5,906.090
|
$10,000.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
22.000
|
$1,072.000
|
$1,500.000
|
$1,654.590
|
$1,190.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,785.000
|
$1,900.000
|
$2,231.230
|
$1,460.000
|
$1,800.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
9.000
|
$2,665.000
|
$1,500.000
|
$2,260.370
|
$2,500.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
34.000
|
$520.000
|
$100.000
|
$602.760
|
$120.000
|
$300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$2,038.000
|
$5,300.000
|
$1,130.180
|
$800.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
17.000
|
$20.000
|
$100.000
|
$101.000
|
$20.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$419,944.200
|
$420,000.000
|
$523,441.090
|
$355,000.000
|
$575,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$15,000.000
|
$27,000.000
|
$15,265.000
|
$36,000.000
|
$31,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
400.000
|
$34.000
|
$50.000
|
$34.780
|
$34.780
|
$52.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$8.500
|
$10.000
|
$10.070
|
$10.070
|
$26.250
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
200.000
|
$26.000
|
$25.000
|
$38.490
|
$38.490
|
$25.200
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
200.000
|
$12.000
|
$5.000
|
$10.700
|
$10.700
|
$12.600
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
200.000
|
$3.500
|
$10.000
|
$5.750
|
$5.750
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
200.000
|
$0.560
|
$3.000
|
$1.300
|
$1.300
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,450.000
|
$5.000
|
$7.000
|
$5.660
|
$5.660
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,450.000
|
$1.000
|
$2.000
|
$1.340
|
$1.340
|
$2.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,907.000
|
$55.000
|
$64.000
|
$94.090
|
$88.000
|
$85.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
587.000
|
$120.000
|
$110.000
|
$150.500
|
$143.000
|
$150.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
40,148.000
|
$0.450
|
$0.170
|
$0.060
|
$0.240
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
20,074.000
|
$0.500
|
$0.300
|
$0.080
|
$0.240
|
$0.150
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$300.000
|
$430.000
|
$347.000
|
$350.000
|
$315.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$679.000
|
$970.000
|
$625.000
|
$785.000
|
$703.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$779.000
|
$1,100.000
|
$700.000
|
$900.000
|
$955.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
5.000
|
$55.000
|
$93.000
|
$65.000
|
$75.000
|
$68.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
52,240.000
|
$0.500
|
$0.450
|
$0.350
|
$0.510
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
40,240.000
|
$0.480
|
$0.450
|
$0.350
|
$0.510
|
$0.270
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,057.000
|
$1.200
|
$2.600
|
$2.000
|
$1.300
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
450.000
|
$0.910
|
$1.800
|
$1.450
|
$2.000
|
$1.420
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,500.000
|
$1.200
|
$1.800
|
$1.450
|
$1.220
|
$1.210
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
500.000
|
$7.000
|
$7.300
|
$5.870
|
$10.000
|
$14.440
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
60.000
|
$126.000
|
$180.000
|
$148.000
|
$157.000
|
$194.250
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
40.000
|
$141.000
|
$200.000
|
$164.000
|
$187.000
|
$215.250
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
500.000
|
$5.500
|
$2.600
|
$2.110
|
$4.500
|
$14.440
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
52,240.000
|
$0.690
|
$0.800
|
$0.660
|
$0.770
|
$0.670
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
500.000
|
$0.690
|
$0.800
|
$0.660
|
$1.000
|
$0.670
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
40,240.000
|
$0.700
|
$0.800
|
$0.660
|
$0.770
|
$0.650
|
|
REFL PAV MRKR TY I-C
|
EA
|
250.000
|
$4.500
|
$4.500
|
$3.650
|
$5.000
|
$6.140
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
528.000
|
$4.500
|
$4.500
|
$3.650
|
$5.000
|
$6.140
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
5,852.000
|
$101.000
|
$100.000
|
$120.000
|
$122.000
|
$115.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
10,076.000
|
$123.000
|
$110.000
|
$120.000
|
$136.000
|
$125.000
|
|
|
TACK COAT
|
GAL
|
6,662.000
|
$3.200
|
$1.500
|
$3.850
|
$2.850
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$25,000.000
|
$6,495.000
|
$18,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
25.000
|
$164.000
|
$1,200.000
|
$415.000
|
$330.000
|
$315.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
30.000
|
$71.000
|
$50.000
|
$3.000
|
$95.000
|
$105.000
|
|
Totals: |
$4,619,386.180
|
$4,665,613.560
|
$5,234,410.790
|
$5,435,097.090
|
$5,543,825.000
|