|
|
PREPARING ROW
|
STA
|
45.000
|
$10,000.000
|
$1,850.000
|
$5,000.000
|
$504.000
|
$1,050.000
|
$4,400.000
|
$1,600.000
|
$750.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,286.000
|
$21.650
|
$23.250
|
$21.200
|
$14.980
|
$20.000
|
$30.000
|
$34.500
|
$23.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
2,674.000
|
$30.000
|
$14.300
|
$22.300
|
$11.000
|
$12.500
|
$32.000
|
$46.000
|
$24.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
28,358.000
|
$1.000
|
$0.380
|
$0.380
|
$0.430
|
$0.420
|
$0.420
|
$0.450
|
$0.400
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
28,358.000
|
$1.020
|
$0.280
|
$0.280
|
$0.310
|
$0.420
|
$0.320
|
$0.350
|
$0.400
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
3,311.000
|
$98.780
|
$106.000
|
$79.810
|
$83.780
|
$90.000
|
$100.000
|
$163.000
|
$110.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
74.000
|
$435.000
|
$399.000
|
$330.000
|
$228.180
|
$500.000
|
$540.000
|
$403.000
|
$400.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
9,932.000
|
$9.000
|
$5.300
|
$4.800
|
$6.320
|
$4.000
|
$10.000
|
$6.500
|
$8.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,986.000
|
$7.210
|
$5.800
|
$6.440
|
$5.870
|
$10.000
|
$6.500
|
$6.600
|
$8.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
16,500.000
|
$3.950
|
$3.000
|
$3.230
|
$5.080
|
$4.500
|
$2.500
|
$4.400
|
$5.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
304.000
|
$225.000
|
$340.000
|
$230.000
|
$380.800
|
$257.600
|
$300.000
|
$380.000
|
$750.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
45.000
|
$422.750
|
$380.000
|
$325.000
|
$425.600
|
$364.750
|
$400.000
|
$425.000
|
$750.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
13.300
|
$466.250
|
$1,870.000
|
$1,596.250
|
$1,344.000
|
$2,250.000
|
$2,000.000
|
$1,220.000
|
$1,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$353,120.610
|
$390,000.000
|
$399,200.080
|
$506,371.120
|
$450,000.000
|
$480,000.000
|
$493,000.000
|
$575,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,150.000
|
$6,170.000
|
$10,000.000
|
$3,360.000
|
$7,500.000
|
$2,500.000
|
$3,300.000
|
$25,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
500.000
|
$50.000
|
$74.650
|
$74.650
|
$16.800
|
$15.000
|
$40.000
|
$83.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
500.000
|
$12.400
|
$23.300
|
$23.300
|
$5.600
|
$10.000
|
$20.000
|
$26.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,047.000
|
$6.950
|
$3.850
|
$3.850
|
$4.310
|
$2.500
|
$5.000
|
$4.300
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,047.000
|
$2.750
|
$0.500
|
$0.500
|
$0.560
|
$2.500
|
$1.000
|
$0.600
|
$2.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
220.000
|
$83.250
|
$88.000
|
$96.000
|
$79.380
|
$120.000
|
$85.000
|
$200.000
|
$200.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
7,860.000
|
$55.250
|
$101.000
|
$100.000
|
$106.550
|
$88.000
|
$110.000
|
$100.000
|
$140.000
|
|
|
PTB (STKPL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
7,860.000
|
$7.000
|
$12.500
|
$20.000
|
$20.700
|
$55.000
|
$21.000
|
$32.000
|
$40.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
540.000
|
$84.850
|
$80.000
|
$54.200
|
$70.620
|
$60.210
|
$100.000
|
$126.000
|
$150.000
|
|
|
TURNOUTS (ACP)
|
SY
|
16.000
|
$105.000
|
$70.000
|
$151.800
|
$72.560
|
$127.000
|
$140.000
|
$100.000
|
$300.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
8,190.000
|
$0.600
|
$0.180
|
$0.780
|
$0.560
|
$1.250
|
$0.280
|
$0.400
|
$0.750
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
7,535.000
|
$0.100
|
$0.220
|
$0.830
|
$0.670
|
$1.250
|
$0.280
|
$0.400
|
$0.750
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
20.000
|
$800.000
|
$750.000
|
$3,038.230
|
$2,208.690
|
$950.000
|
$3,200.000
|
$1,100.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
20.000
|
$9,360.000
|
$8,300.000
|
$8,480.400
|
$2,208.690
|
$1,500.000
|
$10,000.000
|
$12,200.000
|
$10,000.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
1.000
|
$800.000
|
$250.000
|
$249.450
|
$896.000
|
$500.000
|
$250.000
|
$350.000
|
$300.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
38.000
|
$4,490.000
|
$4,560.000
|
$4,350.000
|
$5,107.200
|
$4,872.000
|
$5,500.000
|
$5,100.000
|
$6,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
8,305.000
|
$13.000
|
$11.500
|
$12.000
|
$12.880
|
$13.450
|
$12.000
|
$13.000
|
$22.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
485.000
|
$33.000
|
$25.000
|
$35.000
|
$28.000
|
$39.200
|
$33.000
|
$28.000
|
$82.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
8,750.000
|
$1.480
|
$1.850
|
$1.500
|
$2.070
|
$1.680
|
$2.500
|
$2.000
|
$3.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
17,500.000
|
$1.570
|
$1.950
|
$1.500
|
$2.180
|
$1.680
|
$2.500
|
$2.200
|
$3.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
20.000
|
$1.930
|
$1.950
|
$1.500
|
$2.180
|
$1.700
|
$1.500
|
$2.200
|
$7.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
40.000
|
$2.140
|
$2.050
|
$1.750
|
$2.300
|
$2.250
|
$3.000
|
$2.300
|
$7.000
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
500.000
|
$2.400
|
$2.350
|
$1.750
|
$2.630
|
$2.250
|
$3.000
|
$2.600
|
$7.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
2.000
|
$1,300.000
|
$975.000
|
$1,100.000
|
$1,092.000
|
$1,232.000
|
$1,700.000
|
$1,085.000
|
$5,000.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
350.000
|
$3.000
|
$4.250
|
$4.500
|
$4.760
|
$5.100
|
$4.000
|
$4.700
|
$8.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,600.000
|
$6,500.000
|
$6,000.000
|
$7,280.000
|
$6,720.000
|
$10,400.000
|
$7,225.000
|
$15,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$828.500
|
$625.000
|
$676.940
|
$728.000
|
$840.000
|
$700.000
|
$725.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$985.250
|
$800.000
|
$810.200
|
$868.000
|
$1,024.000
|
$840.000
|
$861.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$900.000
|
$950.000
|
$867.760
|
$1,008.000
|
$1,500.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$963.500
|
$975.000
|
$1,023.400
|
$1,103.200
|
$1,400.000
|
$1,050.000
|
$1,100.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,042.500
|
$1,050.000
|
$1,209.960
|
$1,288.000
|
$1,512.000
|
$1,240.000
|
$1,280.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
4.000
|
$1,120.000
|
$1,200.000
|
$1,271.790
|
$1,736.000
|
$1,680.000
|
$1,300.000
|
$1,722.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
40.000
|
$133.750
|
$100.000
|
$106.600
|
$95.200
|
$135.000
|
$110.000
|
$95.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
10,390.000
|
$0.850
|
$2.500
|
$2.500
|
$2.800
|
$0.850
|
$3.000
|
$2.800
|
$0.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
470.000
|
$1.410
|
$2.250
|
$1.630
|
$1.120
|
$2.000
|
$2.000
|
$3.300
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
470.000
|
$1.310
|
$2.250
|
$1.630
|
$1.120
|
$2.000
|
$2.000
|
$3.300
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
375.000
|
$0.850
|
$0.660
|
$0.660
|
$0.740
|
$2.010
|
$0.750
|
$0.750
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
75.000
|
$2.850
|
$0.880
|
$0.880
|
$0.990
|
$2.910
|
$1.000
|
$1.000
|
$2.800
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,705.000
|
$1.800
|
$0.880
|
$0.880
|
$0.990
|
$1.960
|
$1.000
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
120.000
|
$12.650
|
$9.000
|
$9.000
|
$10.080
|
$14.000
|
$10.000
|
$10.000
|
$13.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$183.000
|
$150.000
|
$150.000
|
$168.000
|
$229.600
|
$165.000
|
$167.000
|
$230.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$234.500
|
$250.000
|
$250.000
|
$280.000
|
$263.200
|
$275.000
|
$278.000
|
$250.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
26,965.000
|
$0.280
|
$0.320
|
$0.320
|
$0.360
|
$0.390
|
$0.400
|
$0.400
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,780.000
|
$0.450
|
$0.440
|
$0.440
|
$0.490
|
$0.450
|
$0.500
|
$0.500
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
120.000
|
$2.150
|
$0.880
|
$0.880
|
$0.990
|
$3.360
|
$1.000
|
$1.000
|
$3.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
6.000
|
$41.000
|
$100.000
|
$100.000
|
$112.000
|
$61.600
|
$110.000
|
$111.000
|
$45.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$51.250
|
$100.000
|
$100.000
|
$112.000
|
$75.040
|
$110.000
|
$111.000
|
$65.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
11,185.000
|
$1.000
|
$0.660
|
$0.660
|
$0.740
|
$1.340
|
$0.700
|
$0.700
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
15,405.000
|
$1.000
|
$0.660
|
$0.660
|
$0.740
|
$1.340
|
$0.700
|
$0.700
|
$0.750
|
|
REFL PAV MRKR TY I-C
|
EA
|
85.000
|
$5.200
|
$5.000
|
$5.000
|
$5.600
|
$8.120
|
$5.500
|
$5.600
|
$7.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
463.000
|
$5.550
|
$5.000
|
$5.000
|
$5.600
|
$8.120
|
$5.500
|
$5.600
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
26,965.000
|
$0.070
|
$0.040
|
$0.040
|
$0.040
|
$0.390
|
$0.050
|
$0.050
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,780.000
|
$0.220
|
$0.080
|
$0.080
|
$0.090
|
$0.450
|
$0.100
|
$0.100
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
120.000
|
$0.450
|
$0.300
|
$0.300
|
$0.340
|
$2.500
|
$0.330
|
$0.300
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$21.750
|
$20.000
|
$20.000
|
$22.400
|
$28.000
|
$22.000
|
$22.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$21.750
|
$20.000
|
$20.000
|
$22.400
|
$28.000
|
$22.000
|
$22.000
|
$5.000
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
2.000
|
$4,800.000
|
$10,500.000
|
$6,000.000
|
$11,760.000
|
$6,720.000
|
$25,000.000
|
$11,700.000
|
$10,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$283.000
|
$175.000
|
$315.000
|
$196.000
|
$352.000
|
$300.000
|
$194.000
|
$575.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
6.000
|
$282.000
|
$175.000
|
$315.000
|
$196.000
|
$352.000
|
$300.000
|
$194.000
|
$575.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
|
LF
|
380.000
|
$2.250
|
$2.250
|
$1.750
|
$2.520
|
$2.000
|
$2.500
|
$2.500
|
$6.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$6,850.000
|
$5,800.000
|
$5,500.000
|
$6,496.000
|
$6,160.000
|
$6,600.000
|
$6,450.000
|
$12,000.000
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
2,389.000
|
$132.750
|
$125.000
|
$115.800
|
$144.480
|
$138.000
|
$134.000
|
$135.000
|
$180.000
|
|
|
D-GR HMA TY-C SAC-A PG76-22
|
TON
|
3,520.000
|
$223.000
|
$158.000
|
$119.400
|
$174.720
|
$145.000
|
$172.000
|
$172.000
|
$200.000
|
|
|
BONDING COURSE
|
GAL
|
6,114.000
|
$4.800
|
$2.500
|
$3.540
|
$5.600
|
$5.250
|
$5.000
|
$7.600
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,700.000
|
$2,200.000
|
$12,500.000
|
$7,280.000
|
$700.000
|
$16,000.000
|
$12,940.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
256.000
|
$258.700
|
$165.000
|
$250.000
|
$140.000
|
$500.000
|
$200.000
|
$209.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
14.000
|
$216.350
|
$500.000
|
$900.000
|
$196.000
|
$750.000
|
$650.000
|
$576.000
|
$200.000
|
|
Totals: |
$4,389,001.735
|
$4,036,048.130
|
$4,086,375.305
|
$4,136,538.300
|
$4,220,069.990
|
$4,832,633.020
|
$5,033,882.000
|
$5,820,485.150
|