PREPARING ROW
|
STA
|
160.320
|
$2,500.000
|
$293.070
|
$651.970
|
$759.240
|
$275.280
|
$1,000.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
708.000
|
$10.000
|
$41.860
|
$18.480
|
$13.680
|
$7.630
|
$6.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-12")
|
SY
|
44,533.500
|
$4.290
|
$2.950
|
$4.900
|
$4.500
|
$11.460
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
21,326.000
|
$9.500
|
$4.820
|
$15.900
|
$18.180
|
$8.530
|
$14.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
3,329.000
|
$15.000
|
$24.080
|
$21.730
|
$9.360
|
$4.810
|
$16.000
|
|
|
BLADING
|
HR
|
80.000
|
$110.000
|
$128.300
|
$104.320
|
$117.000
|
$105.450
|
$150.000
|
|
|
BLOCK SODDING
|
SY
|
14,764.000
|
$3.000
|
$6.150
|
$8.130
|
$8.240
|
$8.880
|
$8.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
79,462.000
|
$0.260
|
$0.690
|
$0.344
|
$0.570
|
$0.340
|
$0.360
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
79,462.000
|
$0.280
|
$0.690
|
$0.344
|
$0.570
|
$0.340
|
$0.360
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
64,698.000
|
$0.190
|
$0.170
|
$0.247
|
$0.290
|
$0.240
|
$0.170
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
64,698.000
|
$0.140
|
$0.170
|
$0.190
|
$0.240
|
$0.190
|
$0.160
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
64,698.000
|
$0.100
|
$0.150
|
$0.190
|
$0.240
|
$0.190
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
666.000
|
$20.000
|
$47.360
|
$23.470
|
$20.520
|
$19.980
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
15,502.700
|
$55.000
|
$75.890
|
$88.360
|
$75.670
|
$125.980
|
$100.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
12,113.900
|
$3.800
|
$6.350
|
$5.760
|
$6.030
|
$5.740
|
$6.000
|
|
|
AGGR(TY-PD GR-5 SAC-A)
|
CY
|
431.600
|
$90.000
|
$103.980
|
$148.160
|
$160.680
|
$208.920
|
$200.000
|
|
|
CUT & RESTORING PAV
|
SY
|
924.000
|
$118.000
|
$138.640
|
$105.000
|
$200.000
|
$60.500
|
$80.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
100.100
|
$205.000
|
$253.230
|
$230.000
|
$500.000
|
$172.050
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
37.000
|
$400.000
|
$906.980
|
$550.000
|
$900.000
|
$555.000
|
$800.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
11,868.000
|
$7.500
|
$7.510
|
$8.000
|
$10.000
|
$11.430
|
$8.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
223.000
|
$285.000
|
$504.870
|
$514.290
|
$750.000
|
$683.160
|
$625.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
2,341.000
|
$172.000
|
$209.930
|
$224.840
|
$320.000
|
$315.330
|
$250.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$6,000.000
|
$17,678.250
|
$11,760.000
|
$8,500.000
|
$7,215.000
|
$12,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
10.000
|
$6,700.000
|
$9,036.030
|
$10,360.000
|
$10,000.000
|
$16,650.000
|
$10,000.000
|
|
|
SET (TY II) (DES 3) (RCP) (4: 1) (P)
|
EA
|
10.000
|
$2,800.000
|
$3,784.880
|
$5,012.000
|
$5,000.000
|
$3,885.000
|
$5,000.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
72.000
|
$3,200.000
|
$5,777.920
|
$5,012.000
|
$7,200.000
|
$4,440.000
|
$8,000.000
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$495.000
|
$357.510
|
$900.000
|
$500.000
|
$3,241.790
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
247.000
|
$11.500
|
$34.740
|
$25.000
|
$25.000
|
$3.160
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$533,975.850
|
$172,605.720
|
$500,000.000
|
$820,387.920
|
$481,544.340
|
$950,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$4,000.000
|
$1,733.060
|
$5,500.000
|
$15,000.000
|
$6,105.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
400.000
|
$50.000
|
$173.060
|
$68.530
|
$82.400
|
$69.930
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$14.000
|
$46.210
|
$40.850
|
$15.450
|
$41.630
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.400
|
$20.000
|
$45.430
|
$49.720
|
$22.660
|
$51.060
|
$10.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.400
|
$5.000
|
$10.440
|
$31.170
|
$8.240
|
$32.190
|
$5.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
90.000
|
$70.000
|
$57.770
|
$80.000
|
$117.000
|
$49.950
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,230.000
|
$2.000
|
$8.110
|
$4.140
|
$3.860
|
$4.220
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,230.000
|
$1.000
|
$1.030
|
$1.770
|
$1.290
|
$1.780
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,493.000
|
$60.000
|
$103.980
|
$97.420
|
$40.500
|
$119.380
|
$100.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
1,200.000
|
$111.000
|
$44.940
|
$102.360
|
$117.000
|
$140.840
|
$160.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$4,000.000
|
$7,509.940
|
$4,300.000
|
$10,916.520
|
$6,700.000
|
$7,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
180.000
|
$30.000
|
$105.370
|
$100.000
|
$125.000
|
$124.320
|
$125.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
540.000
|
$6.000
|
$27.880
|
$30.000
|
$75.000
|
$41.620
|
$65.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
180.000
|
$9.000
|
$41.100
|
$20.000
|
$100.000
|
$131.540
|
$35.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
5,405.000
|
$22.000
|
$35.930
|
$25.000
|
$40.000
|
$37.740
|
$35.000
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
3,018.000
|
$76.750
|
$37.010
|
$25.000
|
$40.000
|
$42.180
|
$33.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,713.000
|
$90.000
|
$267.380
|
$85.000
|
$150.000
|
$154.290
|
$135.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,160.000
|
$40.000
|
$57.770
|
$67.620
|
$36.000
|
$58.140
|
$75.000
|
|
|
TURNOUTS (ACP)
|
SY
|
2,075.000
|
$50.000
|
$69.320
|
$69.850
|
$36.000
|
$61.470
|
$70.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,828.000
|
$50.000
|
$75.460
|
$62.000
|
$105.000
|
$65.490
|
$85.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$2,250.000
|
$3,680.080
|
$2,200.000
|
$3,000.000
|
$3,219.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
8.000
|
$2,000.000
|
$2,292.250
|
$2,200.000
|
$3,200.000
|
$3,219.000
|
$2,750.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
24.000
|
$1,600.000
|
$4,806.250
|
$2,200.000
|
$3,600.000
|
$3,663.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 20)
|
EA
|
1.000
|
$2,600.000
|
$2,432.590
|
$2,200.000
|
$3,800.000
|
$3,774.000
|
$3,500.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
23,047.000
|
$0.250
|
$0.350
|
$0.530
|
$0.450
|
$0.500
|
$0.500
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
14,230.000
|
$0.250
|
$0.350
|
$0.540
|
$0.450
|
$0.390
|
$0.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
12.000
|
$800.000
|
$164.940
|
$800.000
|
$975.000
|
$1,082.250
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$700.000
|
$247.420
|
$800.000
|
$975.000
|
$1,082.250
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$7,500.000
|
$5,407.620
|
$9,000.000
|
$8,775.000
|
$9,740.250
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
8.000
|
$255.000
|
$352.390
|
$327.870
|
$325.000
|
$360.750
|
$400.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$585.000
|
$1,172.710
|
$1,091.120
|
$850.000
|
$943.500
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
43.000
|
$540.000
|
$918.520
|
$854.620
|
$725.000
|
$804.750
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$700.000
|
$1,053.700
|
$980.400
|
$950.000
|
$1,054.500
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$900.000
|
$1,294.020
|
$1,204.000
|
$995.000
|
$1,104.450
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
47.000
|
$75.000
|
$127.090
|
$118.250
|
$80.000
|
$88.800
|
$150.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
16.000
|
$120.000
|
$115.540
|
$104.270
|
$95.000
|
$105.450
|
$125.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
23,633.000
|
$0.200
|
$0.580
|
$0.370
|
$0.350
|
$0.610
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
1,471.000
|
$1.250
|
$4.620
|
$3.225
|
$3.000
|
$1.780
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
292.000
|
$2.250
|
$8.090
|
$6.450
|
$6.000
|
$5.110
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,849.000
|
$0.200
|
$0.580
|
$0.370
|
$0.350
|
$0.830
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
33,333.000
|
$0.250
|
$0.580
|
$0.370
|
$0.350
|
$0.610
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,272.000
|
$3.000
|
$4.620
|
$3.698
|
$3.440
|
$5.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
96.000
|
$7.500
|
$16.180
|
$12.900
|
$12.000
|
$17.760
|
$20.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,720.000
|
$1.000
|
$2.310
|
$1.650
|
$1.470
|
$1.670
|
$1.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
23,633.000
|
$0.120
|
$0.400
|
$0.370
|
$0.350
|
$0.500
|
$0.500
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
1,471.000
|
$1.510
|
$4.620
|
$3.220
|
$3.000
|
$2.780
|
$2.500
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
292.000
|
$2.730
|
$8.090
|
$6.450
|
$6.000
|
$6.110
|
$5.500
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
2,849.000
|
$0.110
|
$0.400
|
$0.370
|
$0.350
|
$0.560
|
$0.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
13,818.000
|
$0.120
|
$0.400
|
$0.370
|
$0.350
|
$0.530
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
327.000
|
$3.000
|
$9.240
|
$8.600
|
$8.000
|
$7.770
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
21,596.000
|
$0.300
|
$0.770
|
$0.720
|
$0.670
|
$0.420
|
$1.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
2,843.000
|
$80.000
|
$103.980
|
$116.190
|
$99.900
|
$145.550
|
$125.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
6,353.000
|
$110.000
|
$132.870
|
$165.140
|
$115.020
|
$158.250
|
$135.000
|
|
|
BONDING COURSE
|
GAL
|
1,236.000
|
$3.000
|
$4.620
|
$6.340
|
$4.550
|
$5.000
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$7,500.000
|
$5,776.870
|
$14,962.500
|
$10,063.490
|
$19,980.000
|
$7,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
65.000
|
$175.000
|
$577.690
|
$157.500
|
$352.220
|
$555.000
|
$325.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
65.000
|
$200.000
|
$538.340
|
$262.500
|
$503.170
|
$222.000
|
$25.000
|
|
Totals: |
$5,888,684.335
|
$6,904,228.804
|
$7,527,827.331
|
$8,294,470.151
|
$8,911,964.629
|
$8,935,557.810
|