PREPARING ROW
|
STA
|
231.000
|
$450.000
|
$509.490
|
$750.000
|
$500.000
|
$500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
66,681.000
|
$7.000
|
$9.350
|
$10.000
|
$12.000
|
$14.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
11,558.000
|
$20.000
|
$14.940
|
$16.000
|
$8.500
|
$23.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
11,679.000
|
$20.000
|
$14.940
|
$23.000
|
$9.000
|
$17.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
231.000
|
$100.000
|
$108.900
|
$150.000
|
$125.000
|
$175.000
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
123,097.000
|
$1.000
|
$0.240
|
$0.250
|
$0.200
|
$0.200
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$80.000
|
$128.700
|
$100.000
|
$80.000
|
$139.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
41,796.000
|
$85.000
|
$80.530
|
$90.000
|
$92.000
|
$105.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
17,457.000
|
$6.350
|
$5.020
|
$4.800
|
$5.000
|
$5.250
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
630.000
|
$148.000
|
$126.860
|
$130.000
|
$100.000
|
$151.000
|
|
|
CEM STABIL BKFL
|
CY
|
396.000
|
$135.000
|
$382.290
|
$175.000
|
$250.000
|
$185.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
115.000
|
$10.000
|
$8.360
|
$20.000
|
$25.000
|
$21.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
17.000
|
$906.980
|
$716.800
|
$605.000
|
$700.000
|
$675.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
20.000
|
$300.000
|
$290.000
|
$275.000
|
$325.000
|
$295.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
42.000
|
$906.980
|
$734.720
|
$610.000
|
$700.000
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
464.000
|
$700.000
|
$639.150
|
$600.000
|
$700.000
|
$625.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
20.000
|
$1,500.000
|
$3,584.000
|
$2,100.000
|
$2,250.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
70.000
|
$120.000
|
$107.520
|
$89.000
|
$125.000
|
$90.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
656.000
|
$160.000
|
$161.280
|
$123.000
|
$150.000
|
$140.000
|
|
|
RC PIPE (CL V)(36 IN)
|
LF
|
66.000
|
$500.000
|
$418.130
|
$345.000
|
$400.000
|
$325.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
6.000
|
$17,678.250
|
$11,349.330
|
$7,150.000
|
$8,000.000
|
$7,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$20,000.000
|
$14,933.330
|
$8,500.000
|
$9,000.000
|
$8,000.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
2.000
|
$6,554.000
|
$9,557.330
|
$9,650.000
|
$11,000.000
|
$9,000.000
|
|
|
WINGWALL (FW - 0) (HW=8 FT)
|
EA
|
2.000
|
$13,136.000
|
$26,282.650
|
$24,170.000
|
$27,000.000
|
$23,000.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
4.000
|
$8,624.000
|
$11,349.330
|
$12,345.000
|
$15,000.000
|
$11,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
7.000
|
$1,272.000
|
$2,688.000
|
$1,717.000
|
$2,000.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,099.000
|
$2,986.660
|
$2,121.000
|
$2,400.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,563.000
|
$4,480.000
|
$2,222.000
|
$2,700.000
|
$2,050.000
|
|
|
REMOV STR (SET)
|
EA
|
14.000
|
$268.000
|
$1,791.990
|
$450.000
|
$1,000.000
|
$400.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,801.000
|
$2,986.660
|
$1,000.000
|
$1,500.000
|
$925.000
|
|
|
REMOV STR (PIPE)
|
LF
|
624.000
|
$34.740
|
$23.890
|
$6.000
|
$10.000
|
$5.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,228,370.610
|
$1,011,668.550
|
$1,026,000.000
|
$1,000,000.000
|
$1,165,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$5,200.000
|
$7,000.000
|
$2,700.000
|
$10,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
315.000
|
$31.000
|
$37.770
|
$37.000
|
$35.000
|
$53.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
315.000
|
$14.000
|
$14.440
|
$14.000
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
134.000
|
$45.430
|
$32.220
|
$32.000
|
$20.000
|
$39.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
134.000
|
$10.440
|
$11.110
|
$11.000
|
$10.000
|
$13.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
100.000
|
$67.000
|
$105.300
|
$70.000
|
$100.000
|
$110.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,374.000
|
$8.110
|
$4.170
|
$4.000
|
$4.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,374.000
|
$2.000
|
$1.390
|
$1.400
|
$2.000
|
$0.250
|
|
|
CONSTRUCTING DETOURS
|
SY
|
13,322.000
|
$103.980
|
$28.880
|
$45.000
|
$65.000
|
$49.250
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
250.000
|
$90.000
|
$128.700
|
$130.000
|
$150.000
|
$0.500
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
250.000
|
$148.680
|
$175.500
|
$180.000
|
$175.000
|
$5.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
15.000
|
$6,406.000
|
$2,134.180
|
$2,680.000
|
$7,250.000
|
$1,000.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
11,850.000
|
$76.000
|
$34.000
|
$12.000
|
$40.000
|
$50.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
42,210.000
|
$48.000
|
$9.950
|
$7.000
|
$7.000
|
$3.250
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
11,850.000
|
$76.000
|
$16.000
|
$20.000
|
$5.000
|
$17.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,205.000
|
$60.000
|
$40.500
|
$70.000
|
$80.000
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
46,160.000
|
$1.000
|
$0.230
|
$0.150
|
$0.250
|
$0.330
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
23,080.000
|
$1.000
|
$0.230
|
$0.150
|
$0.300
|
$0.440
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$30.000
|
$29.330
|
$29.000
|
$30.000
|
$34.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
50.000
|
$105.000
|
$92.550
|
$91.000
|
$100.000
|
$115.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,274.000
|
$3,460.770
|
$3,440.000
|
$4,000.000
|
$3,800.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
48.000
|
$1,021.000
|
$833.250
|
$825.000
|
$1,000.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
12.000
|
$631.000
|
$388.850
|
$385.000
|
$500.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
12.000
|
$9,600.000
|
$8,643.580
|
$8,600.000
|
$10,000.000
|
$8,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$918.520
|
$636.300
|
$1,330.000
|
$1,000.000
|
$630.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$781.000
|
$757.500
|
$1,650.000
|
$1,200.000
|
$750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$107.000
|
$126.250
|
$165.000
|
$200.000
|
$125.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
6.000
|
$125.000
|
$219.600
|
$330.000
|
$400.000
|
$400.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$35.000
|
$35.350
|
$61.000
|
$75.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
25.000
|
$79.000
|
$106.050
|
$138.000
|
$150.000
|
$105.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
22,054.000
|
$1.000
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,352.000
|
$4.000
|
$2.530
|
$3.000
|
$3.000
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
192,638.000
|
$1.000
|
$0.510
|
$0.600
|
$0.750
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
528.000
|
$9.000
|
$7.070
|
$8.000
|
$8.000
|
$7.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
72,000.000
|
$1.000
|
$0.510
|
$0.600
|
$0.750
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,699.000
|
$2.000
|
$1.440
|
$1.500
|
$1.250
|
$1.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
6,719.000
|
$2.000
|
$1.440
|
$1.500
|
$1.250
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
46,160.000
|
$0.450
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,595.000
|
$0.540
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,810.000
|
$0.580
|
$0.450
|
$0.500
|
$0.750
|
$0.450
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
370.000
|
$4.000
|
$2.530
|
$3.000
|
$3.000
|
$2.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
264,638.000
|
$1.000
|
$0.270
|
$0.300
|
$0.500
|
$0.270
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
528.000
|
$5.000
|
$2.020
|
$2.200
|
$2.500
|
$2.000
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
7,680.000
|
$2.000
|
$2.020
|
$2.200
|
$3.000
|
$2.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
26,165.000
|
$130.000
|
$102.060
|
$114.000
|
$125.000
|
$119.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
9,442.000
|
$150.000
|
$117.180
|
$138.000
|
$140.000
|
$160.000
|
|
|
BONDING COURSE
|
GAL
|
8,477.000
|
$6.500
|
$4.290
|
$5.000
|
$5.250
|
$5.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,300.000
|
$10,000.000
|
$17,300.000
|
$25,000.000
|
$15,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
7,680.000
|
$13.000
|
$8.080
|
$9.000
|
$10.000
|
$8.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$226.520
|
$220.000
|
$180.000
|
$350.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$77.350
|
$80.000
|
$60.000
|
$25.000
|
$75.000
|
|
|
DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM
|
MO
|
15.000
|
$5,700.000
|
$3,300.000
|
$2,670.000
|
$10,000.000
|
$1,000.000
|
|
Totals: |
$18,754,770.600
|
$12,957,924.780
|
$13,761,371.750
|
$14,998,596.650
|
$15,356,599.510
|