PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
4.000
|
$700.790
|
$2,000.000
|
$1,875.000
|
$792.000
|
$1,200.000
|
$1,296.000
|
$1,000.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
9.000
|
$3,000.000
|
$1,000.000
|
$1,000.000
|
$525.000
|
$1,000.000
|
$1,296.000
|
$850.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
507.000
|
$18.000
|
$10.040
|
$14.000
|
$5.110
|
$12.000
|
$11.840
|
$4.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
7,756.000
|
$12.000
|
$10.040
|
$10.000
|
$11.890
|
$15.000
|
$27.880
|
$15.000
|
|
|
BLADING
|
STA
|
257.400
|
$270.000
|
$68.610
|
$160.000
|
$52.500
|
$150.000
|
$70.200
|
$100.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
9.780
|
$676.000
|
$434.000
|
$675.000
|
$350.000
|
$450.000
|
$468.720
|
$450.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
9.780
|
$582.000
|
$320.000
|
$550.000
|
$350.000
|
$450.000
|
$345.600
|
$320.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,062.000
|
$20.000
|
$10.560
|
$12.000
|
$31.500
|
$15.000
|
$30.240
|
$22.000
|
|
|
PROOF ROLLING
|
HR
|
25.000
|
$71.000
|
$53.500
|
$100.000
|
$78.000
|
$75.000
|
$59.400
|
$85.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
40,722.000
|
$35.000
|
$36.620
|
$35.400
|
$34.250
|
$36.000
|
$34.000
|
$30.000
|
|
|
REWORK BS MTL (TY C)(11")(DENS CONT)
|
SY
|
114,404.000
|
$2.250
|
$1.600
|
$1.810
|
$2.200
|
$1.900
|
$1.240
|
$5.300
|
|
|
PRIME COAT (RC-250)
|
GAL
|
28,853.000
|
$3.900
|
$3.560
|
$3.600
|
$3.250
|
$3.800
|
$3.780
|
$3.500
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
1,031.000
|
$65.000
|
$52.060
|
$42.600
|
$69.200
|
$100.000
|
$62.400
|
$55.750
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
1,603.000
|
$90.000
|
$73.590
|
$74.000
|
$86.200
|
$80.000
|
$97.230
|
$88.700
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,202.000
|
$85.000
|
$76.360
|
$70.000
|
$95.200
|
$90.000
|
$87.600
|
$88.700
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
49,050.000
|
$3.250
|
$2.930
|
$3.000
|
$3.200
|
$3.200
|
$3.620
|
$3.500
|
|
|
ASPH (CRS-1P OR AC-15P)
|
GAL
|
60,591.000
|
$3.750
|
$2.660
|
$3.100
|
$2.850
|
$3.200
|
$3.590
|
$3.000
|
|
|
HMCL ACP TY-F SAC-B AC-1.5
|
TON
|
68.000
|
$140.000
|
$117.310
|
$150.000
|
$124.200
|
$130.000
|
$189.000
|
$244.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
96.000
|
$140.000
|
$111.310
|
$150.000
|
$151.200
|
$160.000
|
$156.600
|
$237.000
|
|
|
CEM STABIL BKFL
|
CY
|
54.000
|
$77.190
|
$150.000
|
$200.000
|
$240.000
|
$160.000
|
$108.000
|
$150.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
202.200
|
$250.000
|
$150.000
|
$200.000
|
$193.000
|
$165.000
|
$218.380
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
92.000
|
$20.000
|
$15.000
|
$10.000
|
$26.200
|
$16.000
|
$8.640
|
$20.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
355.000
|
$75.000
|
$55.000
|
$47.000
|
$48.300
|
$58.000
|
$51.840
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
86.000
|
$150.000
|
$75.000
|
$70.000
|
$73.500
|
$78.000
|
$95.040
|
$120.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
367.000
|
$200.000
|
$140.000
|
$160.000
|
$135.200
|
$150.000
|
$151.200
|
$180.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 5)
|
LF
|
5.000
|
$1,000.000
|
$450.000
|
$285.000
|
$420.000
|
$550.000
|
$378.000
|
$300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$700.000
|
$1,000.000
|
$800.000
|
$875.000
|
$1,000.000
|
$864.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$1,050.000
|
$975.000
|
$990.000
|
$1,100.000
|
$864.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
8.000
|
$2,690.000
|
$3,000.000
|
$1,800.000
|
$1,825.000
|
$3,000.000
|
$3,240.000
|
$4,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$3,200.000
|
$3,500.000
|
$1,900.000
|
$2,620.000
|
$3,600.000
|
$3,240.000
|
$4,000.000
|
|
|
SET (TY II) (60 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$4,000.000
|
$9,500.000
|
$3,700.000
|
$4,500.000
|
$5,940.000
|
$4,500.000
|
|
|
SET (TY II) (DES 5) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$2,200.000
|
$3,000.000
|
$2,250.000
|
$1,955.000
|
$3,200.000
|
$3,780.000
|
$5,000.000
|
|
|
SET (TY II) (DES 7) (CMP) (4: 1) (C)
|
EA
|
8.000
|
$4,000.000
|
$4,100.000
|
$3,350.000
|
$3,235.000
|
$4,500.000
|
$5,238.000
|
$5,500.000
|
|
|
SET (TY II) (DES 8) (CMP) (4: 1) (C)
|
EA
|
6.000
|
$2,500.000
|
$4,200.000
|
$3,900.000
|
$4,060.000
|
$4,500.000
|
$6,480.000
|
$6,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
490.000
|
$19.920
|
$10.000
|
$24.000
|
$10.500
|
$11.000
|
$16.200
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$378,232.170
|
$287,821.610
|
$250,000.000
|
$379,000.000
|
$310,000.000
|
$429,452.600
|
$420,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$7,000.000
|
$1,942.570
|
$5,000.000
|
$2,000.000
|
$5,000.000
|
$2,268.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
30.000
|
$30.000
|
$43.000
|
$52.000
|
$31.500
|
$40.000
|
$46.440
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
30.000
|
$10.000
|
$10.000
|
$20.000
|
$10.500
|
$8.000
|
$8.640
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,146.000
|
$5.000
|
$2.500
|
$4.000
|
$2.350
|
$4.000
|
$2.700
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,146.000
|
$1.300
|
$0.850
|
$2.600
|
$0.530
|
$1.000
|
$0.540
|
$0.850
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
4,415.000
|
$6.500
|
$3.110
|
$5.000
|
$4.200
|
$5.500
|
$3.360
|
$3.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,415.000
|
$1.650
|
$0.600
|
$0.800
|
$0.530
|
$1.000
|
$0.540
|
$0.520
|
|
|
CONSTRUCTING DETOURS
|
SY
|
14,433.000
|
$22.000
|
$22.640
|
$17.000
|
$18.800
|
$19.000
|
$19.320
|
$19.750
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
1,838.000
|
$22.000
|
$16.560
|
$19.000
|
$18.900
|
$16.000
|
$12.960
|
$34.450
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
4,280.700
|
$20.000
|
$18.700
|
$19.000
|
$18.600
|
$16.000
|
$10.800
|
$34.450
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
44.000
|
$25.000
|
$17.630
|
$19.000
|
$41.000
|
$25.000
|
$5.400
|
$34.450
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
7.000
|
$205.000
|
$150.000
|
$225.000
|
$210.000
|
$220.000
|
$378.000
|
$210.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$550.000
|
$545.000
|
$950.000
|
$840.000
|
$370.000
|
$378.000
|
$610.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,200.000
|
$690.000
|
$1,000.000
|
$890.000
|
$530.000
|
$540.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
24.000
|
$550.000
|
$330.000
|
$725.000
|
$680.000
|
$320.000
|
$324.000
|
$240.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
22.000
|
$700.000
|
$420.000
|
$850.000
|
$785.000
|
$370.000
|
$378.000
|
$330.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$300.000
|
$345.000
|
$650.000
|
$575.000
|
$300.000
|
$297.000
|
$470.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
46.000
|
$110.000
|
$70.000
|
$115.000
|
$52.000
|
$110.000
|
$108.000
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
24.000
|
$80.000
|
$45.000
|
$75.000
|
$68.000
|
$80.000
|
$91.800
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
103,740.000
|
$0.170
|
$0.170
|
$0.190
|
$0.180
|
$0.160
|
$0.180
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
103,740.000
|
$0.200
|
$0.170
|
$0.190
|
$0.180
|
$0.160
|
$0.180
|
$0.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,969.000
|
$1.160
|
$1.140
|
$1.110
|
$1.550
|
$0.600
|
$0.950
|
$1.250
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
225.000
|
$0.600
|
$1.600
|
$1.780
|
$1.680
|
$1.700
|
$1.730
|
$1.630
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
150.000
|
$10.000
|
$12.000
|
$13.330
|
$12.600
|
$6.000
|
$12.960
|
$4.970
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,583.000
|
$0.450
|
$0.350
|
$0.390
|
$0.370
|
$0.480
|
$0.380
|
$0.450
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
51,480.000
|
$0.450
|
$0.320
|
$0.360
|
$0.340
|
$0.370
|
$0.350
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,890.000
|
$0.450
|
$0.320
|
$0.360
|
$0.340
|
$0.480
|
$0.350
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
37,730.000
|
$0.450
|
$0.320
|
$0.360
|
$0.340
|
$0.370
|
$0.350
|
$0.350
|
|
REFL PAV MRKR TY I-C
|
EA
|
197.000
|
$4.000
|
$4.000
|
$4.440
|
$4.200
|
$4.000
|
$4.320
|
$3.820
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
568.000
|
$4.000
|
$4.000
|
$4.440
|
$4.200
|
$3.500
|
$4.320
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
33,565.000
|
$0.750
|
$0.500
|
$0.520
|
$0.440
|
$0.650
|
$0.540
|
$0.320
|
|
Totals: |
$4,198,880.070
|
$3,673,746.044
|
$3,679,630.500
|
$3,794,143.620
|
$3,924,208.590
|
$3,967,029.386
|
$4,411,316.605
|