|
|
REMOV CONC (MOWSTRIP)
|
SY
|
2,493.000
|
$30.000
|
$50.000
|
$21.700
|
$40.000
|
$20.130
|
|
|
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
6,561.000
|
$7.000
|
$40.000
|
$4.490
|
$16.500
|
$25.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
13,277.000
|
$30.000
|
$30.000
|
$12.590
|
$15.000
|
$43.250
|
|
|
SUBGR WIDEN (OC)
|
STA
|
442.000
|
$500.000
|
$650.000
|
$884.550
|
$750.000
|
$1,750.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
2,358.000
|
$27.600
|
$65.000
|
$68.000
|
$40.000
|
$110.000
|
|
|
BLADING
|
HR
|
40.000
|
$270.000
|
$150.000
|
$558.560
|
$500.000
|
$450.000
|
|
|
DRILL SEED (PERM_URBAN_SAND)
|
SY
|
55,075.000
|
$0.750
|
$1.000
|
$0.420
|
$0.330
|
$0.490
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$138.000
|
$150.000
|
$203.670
|
$160.000
|
$200.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (10")
|
SY
|
45,661.000
|
$21.000
|
$23.000
|
$41.980
|
$20.000
|
$40.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
9,133.000
|
$11.000
|
$5.000
|
$8.510
|
$7.000
|
$11.040
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
17,352.000
|
$5.000
|
$10.000
|
$6.130
|
$7.700
|
$8.880
|
|
|
AGGR (TY-PB, GR-4)(SAC-A)
|
CY
|
506.000
|
$120.000
|
$350.000
|
$454.600
|
$280.000
|
$600.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
5,022.000
|
$150.000
|
$190.000
|
$211.530
|
$264.000
|
$250.000
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
2,510.000
|
$300.000
|
$225.000
|
$298.480
|
$318.000
|
$283.030
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
14.000
|
$330.000
|
$350.000
|
$337.770
|
$335.000
|
$362.250
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
200.000
|
$400.000
|
$350.000
|
$498.340
|
$500.000
|
$517.500
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
42.000
|
$510.000
|
$450.000
|
$609.080
|
$600.000
|
$632.500
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
73.500
|
$785.000
|
$650.000
|
$308.920
|
$1,200.000
|
$1,725.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
442.000
|
$650.000
|
$950.000
|
$675.530
|
$1,000.000
|
$701.500
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
4.000
|
$5,000.000
|
$12,500.000
|
$16,141.800
|
$20,000.000
|
$21,275.000
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$1,900.000
|
$2,500.000
|
$2,918.310
|
$5,000.000
|
$2,875.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$800.000
|
$500.000
|
$1,223.660
|
$4,500.000
|
$1,725.000
|
|
|
REMOV STR (PIPE)
|
LF
|
42.000
|
$35.000
|
$50.000
|
$58.270
|
$200.000
|
$57.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$613,302.230
|
$800,000.000
|
$776,797.630
|
$1,060,000.000
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$15,000.000
|
$15,000.000
|
$13,306.940
|
$40,000.000
|
$50,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$20,000.000
|
$15,886.110
|
$20,000.000
|
$26,250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
270.000
|
$150.000
|
$250.000
|
$365.090
|
$350.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
9.000
|
$440.000
|
$250.000
|
$895.870
|
$1,000.000
|
$1,275.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
3,216.000
|
$10.000
|
$18.000
|
$11.070
|
$11.500
|
$15.730
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,216.000
|
$3.000
|
$9.000
|
$2.210
|
$2.750
|
$3.380
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
713.000
|
$44.000
|
$35.000
|
$39.870
|
$40.000
|
$41.400
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,350.000
|
$1,850.000
|
$2,353.280
|
$2,400.000
|
$2,443.750
|
|
|
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
|
LF
|
9,078.000
|
$14.000
|
$28.000
|
$18.830
|
$18.700
|
$19.550
|
|
|
CABLE BARRIER TERM SEC (INSTL)(TL-4)
|
EA
|
30.000
|
$4,200.000
|
$3,850.000
|
$5,160.600
|
$5,000.000
|
$5,359.000
|
|
|
CABLE BARRIER (REMOVE)
|
LF
|
7,617.000
|
$8.000
|
$5.000
|
$4.430
|
$4.400
|
$4.600
|
|
|
CABLE BARRIER TERMINAL SECTION (REMOVE)
|
EA
|
23.000
|
$1,100.000
|
$1,000.000
|
$1,661.140
|
$1,650.000
|
$1,725.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$3,850.000
|
$3,931.360
|
$3,900.000
|
$4,082.500
|
|
|
IN RD IL (TY AL) 40T-8 (250W EQ) LED
|
EA
|
5.000
|
$5,400.000
|
$6,500.000
|
$7,198.260
|
$7,200.000
|
$7,475.000
|
|
|
IN RD IL (TY AL) 50T-8-8 (400W EQ) LED
|
EA
|
16.000
|
$6,500.000
|
$8,500.000
|
$11,627.970
|
$11,550.000
|
$12,075.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,330.000
|
$18.000
|
$30.000
|
$11.070
|
$11.000
|
$11.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,410.000
|
$26.000
|
$80.000
|
$55.370
|
$55.000
|
$57.500
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
145.000
|
$25.000
|
$40.000
|
$33.220
|
$33.000
|
$34.500
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
265.000
|
$30.000
|
$90.000
|
$66.450
|
$66.000
|
$69.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,915.000
|
$2.400
|
$3.000
|
$1.380
|
$1.400
|
$1.440
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
11,380.000
|
$2.700
|
$3.000
|
$1.940
|
$1.900
|
$2.010
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
450.000
|
$2.750
|
$3.000
|
$1.940
|
$1.900
|
$2.010
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
70.000
|
$2.800
|
$3.000
|
$2.490
|
$2.500
|
$2.590
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
22.000
|
$1,900.000
|
$1,500.000
|
$1,937.990
|
$1,925.000
|
$2,012.500
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$1,900.000
|
$1,650.000
|
$2,768.560
|
$2,750.000
|
$2,875.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
4.000
|
$9,500.000
|
$12,500.000
|
$12,181.680
|
$12,100.000
|
$12,650.000
|
|
|
ELC SRV TY D 120/240 060(SS)SS(E)SP(O)
|
EA
|
1.000
|
$6,000.000
|
$12,500.000
|
$13,289.100
|
$13,200.000
|
$13,800.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
78.000
|
$45.000
|
$30.000
|
$83.060
|
$82.500
|
$86.250
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
110.000
|
$37.000
|
$30.000
|
$42.080
|
$42.000
|
$43.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
59.000
|
$750.000
|
$1,500.000
|
$781.840
|
$777.000
|
$1,035.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
48.000
|
$804.000
|
$1,500.000
|
$1,077.520
|
$1,070.000
|
$1,270.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$1,000.000
|
$1,500.000
|
$878.190
|
$872.000
|
$1,132.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
13.000
|
$1,200.000
|
$1,500.000
|
$1,241.420
|
$1,233.000
|
$1,437.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,300.000
|
$1,500.000
|
$1,094.140
|
$1,087.000
|
$1,345.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,350.000
|
$1,500.000
|
$1,483.950
|
$1,475.000
|
$1,725.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
43.000
|
$650.000
|
$1,100.000
|
$756.370
|
$751.000
|
$1,063.750
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$700.000
|
$1,100.000
|
$866.010
|
$860.000
|
$1,081.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
150.000
|
$160.000
|
$100.000
|
$160.520
|
$220.000
|
$175.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
591.000
|
$9.000
|
$20.000
|
$8.530
|
$8.500
|
$15.530
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$1,400.000
|
$5,000.000
|
$1,218.170
|
$1,210.000
|
$1,725.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
|
EA
|
19.000
|
$18.000
|
$100.000
|
$33.220
|
$33.000
|
$34.500
|
|
|
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
|
EA
|
42.000
|
$52.000
|
$1,000.000
|
$53.160
|
$53.000
|
$143.750
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
34.000
|
$90.000
|
$100.000
|
$56.480
|
$56.000
|
$143.750
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
2,299.000
|
$1.000
|
$2.000
|
$1.380
|
$1.400
|
$1.440
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
41,680.000
|
$1.000
|
$2.000
|
$0.940
|
$1.100
|
$0.980
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
116,691.000
|
$1.500
|
$1.500
|
$0.960
|
$1.200
|
$1.000
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
117,687.000
|
$1.500
|
$1.500
|
$0.960
|
$1.200
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
29,888.000
|
$0.750
|
$1.500
|
$0.730
|
$0.800
|
$0.760
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
1,289.000
|
$18.000
|
$20.000
|
$15.500
|
$16.000
|
$16.100
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
93.000
|
$270.000
|
$250.000
|
$276.860
|
$275.000
|
$287.500
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
93.000
|
$325.000
|
$250.000
|
$354.380
|
$385.000
|
$368.000
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
446.000
|
$45.000
|
$75.000
|
$19.930
|
$60.500
|
$20.700
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,920.000
|
$6.000
|
$6.000
|
$4.710
|
$5.500
|
$4.890
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
104,664.000
|
$1.250
|
$0.500
|
$1.280
|
$1.150
|
$7.750
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
148.000
|
$15.000
|
$20.000
|
$1.150
|
$4.400
|
$25.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
11.000
|
$105.000
|
$250.000
|
$59.130
|
$59.000
|
$30.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
12.000
|
$105.000
|
$250.000
|
$58.910
|
$59.000
|
$30.000
|
|
|
ELIM EXT PM & MRKS (36")(YLD TRI)
|
EA
|
12.000
|
$25.000
|
$150.000
|
$58.910
|
$59.000
|
$30.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$36,000.000
|
$50,000.000
|
$55,371.270
|
$55,000.000
|
$57,500.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
7.000
|
$400.000
|
$385.000
|
$359.910
|
$358.000
|
$373.750
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
2.000
|
$400.000
|
$385.000
|
$359.920
|
$358.000
|
$373.750
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
7.000
|
$400.000
|
$385.000
|
$359.910
|
$358.000
|
$373.750
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
2.000
|
$400.000
|
$385.000
|
$359.920
|
$358.000
|
$373.750
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
7.000
|
$400.000
|
$385.000
|
$359.910
|
$358.000
|
$373.750
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$400.000
|
$385.000
|
$359.910
|
$358.000
|
$373.750
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
7.000
|
$230.000
|
$200.000
|
$221.490
|
$220.000
|
$230.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
2.000
|
$280.000
|
$250.000
|
$276.860
|
$275.000
|
$287.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
315.000
|
$3.500
|
$3.000
|
$3.320
|
$3.300
|
$3.450
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
105.000
|
$4.750
|
$3.000
|
$4.430
|
$4.500
|
$4.600
|
|
|
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
|
LF
|
595.000
|
$6.000
|
$3.000
|
$6.640
|
$6.500
|
$6.900
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$1,450.000
|
$2,500.000
|
$719.830
|
$715.000
|
$747.500
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
2.000
|
$15,400.000
|
$25,000.000
|
$19,379.950
|
$19,250.000
|
$20,125.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$21,500.000
|
$30,000.000
|
$22,148.510
|
$22,000.000
|
$23,000.000
|
|
|
BONDING COURSE
|
GAL
|
4,567.000
|
$5.500
|
$10.000
|
$3.680
|
$8.000
|
$11.200
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
1.000
|
$10,500.000
|
$6,500.000
|
$13,289.100
|
$13,200.000
|
$13,800.000
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
3.000
|
$9,000.000
|
$15,000.000
|
$18,272.520
|
$18,150.000
|
$18,975.000
|
|
|
RVDS (ADVANCE DETENTION ONLY)
|
EA
|
3.000
|
$6,900.000
|
$15,000.000
|
$18,272.520
|
$18,150.000
|
$18,975.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
1.000
|
$3,000.000
|
$6,500.000
|
$12,735.390
|
$12,650.000
|
$13,225.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
1.000
|
$750.000
|
$2,500.000
|
$4,983.410
|
$4,950.000
|
$5,175.000
|
|
Totals: |
$6,735,407.030
|
$8,360,128.000
|
$8,590,346.200
|
$8,714,547.450
|
$11,102,993.350
|